1 | FDP Form 10a - Bid Results on Civil Works | |||||||||||||||||||||||||
2 | Note: Bid Results are in three (3) separate forms, particularly, for Civil Works (Form 10a -CW), Goods and Services (Form 10b - GS) and Consulting Services | |||||||||||||||||||||||||
3 | (Form 10c - CS). If there is no bidded project, good or service for the quarter, the forms must still be submitted with the said notation and signed accordingly. | |||||||||||||||||||||||||
4 | ||||||||||||||||||||||||||
5 | CIVIL WORKS BID-OUT | |||||||||||||||||||||||||
6 | ||||||||||||||||||||||||||
7 | REGION: | REGION X - NORTHERN MINDANAO | CALENDAR YEAR: | 2025 | ||||||||||||||||||||||
8 | PROVINCE: | MISAMIS ORIENTAL | QUARTER: | 1 | ||||||||||||||||||||||
9 | CITY/MUNICIPALITY: | |||||||||||||||||||||||||
10 | ||||||||||||||||||||||||||
11 | No. | Reference No. | Name of Project | Approved Budget for Contract | Location | Winning Bidder | Name and Address | Bid Amount | Bidding Date | Contract Duration | ||||||||||||||||
12 | ||||||||||||||||||||||||||
13 | 1 | 3498-24 | Water Supply and Sanitation Projects - Construction of Bulk Water Supply Project in the Brgy. Samay, San Juan, Linabu, and Blanco, Municipality of Balingasag, Province of Misamis Oriental | 29,999,567.18 | Balingasag, Misamis Oriental | NONE | N/A | N/A | January 16, 2025 | 283 Calendar Days | ||||||||||||||||
14 | 2 | 0005-25 | Construction of Water System Brgy. Lagtang, Alubijid, Misamis Oriental | 3,598,315.63 | Alubijid, Misamis Oriental | NONE | N/A | N/A | January 16, 2025 | 161 Calendar Days | ||||||||||||||||
15 | 3 | 0013-25 | Construction of Water System Molocboloc, Alubijid, Misamis Oriental | 2,537,660.52 | Alubijid, Misamis Oriental | NONE | N/A | N/A | January 16, 2025 | 60 Calendar Days | ||||||||||||||||
16 | 4 | 0014-25 | Construction of Water System Tugasnon, Alubijid, Mis. Or. | 4,140,989.85 | Alubijid, Misamis Oriental | NONE | N/A | N/A | January 16, 2025 | 196 Calendar Days | ||||||||||||||||
17 | 5 | 0002-25 | Construction of Water System Lourdes, Alubijid, Misamis Oriental | 3,107,484.38 | Alubijid, Misamis Oriental | NONE | N/A | N/A | January 16, 2025 | 149 Calendar Days | ||||||||||||||||
18 | 6 | 0003-25 | Construction of Water System, Moog, Laguindingan, Misamis Oriental | 2,764,453.83 | Laguindingan, Misamis Oriental | NONE | N/A | N/A | January 16, 2025 | 125 Calendar Days | ||||||||||||||||
19 | 7 | 0001-25 | Construction of Water System Brgy. Kibaghot, Laguindingan, Misamis Oriental | 3,064,262.90 | Laguindingan, Misamis Oriental | NONE | N/A | N/A | January 16, 2025 | 142 Calendar Days | ||||||||||||||||
20 | 8 | 0015-25 | Construction of Water System Tubajon, Laguindingan, Misamis Oriental | 2,536,883.15 | Laguindingan, Misamis Oriental | NONE | N/A | N/A | January 16, 2025 | 40 Calendar Days | ||||||||||||||||
21 | 9 | 0012-25 | Rehabilitation of Water System, Upper Malubog, Manticao, Misamis Oriental | 2,996,464.93 | Manticao, Misamis Oriental | NONE | N/A | N/A | January 16, 2025 | 67 Calendar Days | ||||||||||||||||
22 | 10 | 0004-25 | Construction of Reservoir, Pontacon, Initao, Misamis Oriental | 1,803,907.41 | Initao, Misamis Oriental | NONE | N/A | N/A | January 16, 2025 | 36 Calendar Days | ||||||||||||||||
23 | 11 | 0007-25 | Completion of Multi-purpose Building, Cogon, Balingasag, Misamis Oriental | 1,499,946.61 | Balingasag, Misamis Oriental | NONE | N/A | N/A | January 16, 2025 | 23 Calendar Days | ||||||||||||||||
24 | 12 | 0010-25 | Construction of Child Development Center, Mambayaan, Balingasag, Misamis Oriental | 3,692,561.26 | Balingasag, Misamis Oriental | NONE | N/A | N/A | January 16, 2025 | 66 Calendar Days | ||||||||||||||||
25 | 13 | 0016-25 | Construction of Barangay Health Center and Nutrition Office Poblacion 3 Villanueva, Misamis Oriental | 13,680,091.63 | Villanueva, Misamis Oriental | NONE | N/A | N/A | January 23, 2025 | 141 Calendar Days | ||||||||||||||||
26 | 14 | 0020-25 | Construction of Spillway at Barangay Digkilaan, Manticao, Misamis Oriental | 10,497,970.11 | Manticao, Misamis Oriental | NONE | N/A | N/A | January 23, 2025 | 101 Calendar Days | ||||||||||||||||
27 | 15 | 0017-25 | Improvement of Water System, Balingoan, Misamis Oriental | 5,499,947.49 | Balingoan, Misamis Oriental | NONE | N/A | N/A | January 23, 2025 | 80 Calendar Days | ||||||||||||||||
28 | 16 | 0018-25 | Construction of Covered Court Barangay Bobontugan, Jasaan, Misamis Oriental | 5,540,101.08 | Jasaan, Misamis Oriental | NONE | N/A | N/A | January 23, 2025 | 170 Calendar Days | ||||||||||||||||
29 | 17 | 0019-25 | Construction of Footbridge Purok 3, Rosario, Balingasag, Misamis Oriental | 9,478,691.09 | Balingasag, Misamis Oriental | NONE | N/A | N/A | January 23, 2025 | 64 Calendar Days | ||||||||||||||||
30 | 18 | 0006-25 | Construction of Perimeter Fence at Tula Elementary School, Alubijid Misamis Oriental | 4,998,574.75 | Alubijid Misamis Oriental | NONE | N/A | N/A | January 23, 2025 | 76 Calendar Days | ||||||||||||||||
31 | 19 | 0036-25 | Construction of Water System Barangay Balintad, Manticao, Misamis Oriental | 1,642,635.52 | Manticao, Misamis Oriental | NONE | N/A | N/A | January 23, 2025 | 40 Calendar Days | ||||||||||||||||
32 | 20 | 0011-25 | Construction of Child Development Center, Brgy. Poblacion, Alubijid Misamis Oriental | 3,794,380.43 | Alubijid Misamis Oriental | NONE | N/A | N/A | January 23, 2025 | 67 Calendar Days | ||||||||||||||||
33 | 21 | 0008-25 | Construction of Covered Court Concrete Bleachers Brgy. Tula, Alubijid, Misamis Oriental | 1,376,895.80 | Alubijid, Misamis Oriental | NONE | N/A | N/A | January 23, 2025 | 64 Calendar Days | ||||||||||||||||
34 | 22 | 0037-25 | Construction of Water System Brgy. San Isidro, Balingasag, Misamis Oriental | 3,642,187.42 | Balingasag, Misamis Oriental | NONE | N/A | N/A | January 23, 2025 | 161 Calendar Days | ||||||||||||||||
35 | 23 | 0035-25 | Construction of 1 storey 4 Classroom School Building Pamalihi Elementary School, Samay, Balingasag, Misamis Oriental | 7,448,828.62 | Balingasag, Misamis Oriental | NONE | N/A | N/A | January 30, 2025 | 105 Calendar Days | ||||||||||||||||
36 | 24 | 0050-25 | Construction of Child Development Center San Roque Aposkahoy Claveria, Misamis Oriental | 3,663,708.92 | Claveria, Misamis Oriental | NONE | N/A | N/A | January 30, 2025 | 66 Calendar Days | ||||||||||||||||
37 | 25 | 0053-25 | Construction of Child Development Center, Salagsag, Salay, at Brgy. Salagsa, Salay Misamis Oriental | 3,529,985.53 | Salay Misamis Oriental | NONE | N/A | N/A | January 30, 2025 | 72 Calendar Days | ||||||||||||||||
38 | 26 | 0051-25 | Construction of Child Development Center Brgy. Solana, Jasaan Misamis Oriental | 3,924,217.29 | Jasaan Misamis Oriental | NONE | N/A | N/A | January 30, 2025 | 66 Calendar Days | ||||||||||||||||
39 | 27 | 0052-25 | Construction of Day Care Center Brgy. San Isidro, Magsaysay Misamis Oriental | 3,085,923.57 | Magsaysay Misamis Oriental | NONE | N/A | N/A | January 30, 2025 | 61 Calendar Days | ||||||||||||||||
40 | 28 | 3498-24 | Water Supply and Sanitation Projects - Construction of Bulk Water Supply Project in the Brgy. Samay, San Juan, Linabu, and Blanco, Municipality of Balingasag, Province of Misamis Oriental | 29,999,567.18 | Balingasag, Misamis Oriental | EQUALYZ TRADING | Beside Greenfield Montessori School Brgy. Samapaloc Tanay Rizal | 29,998,512.87 | January 30, 2025 | 283 Calendar Days | ||||||||||||||||
41 | 29 | 0005-25 | Construction of Water System Brgy. Lagtang, Alubijid, Misamis Oriental | 3,598,315.63 | Alubijid, Misamis Oriental | NONE | N/A | N/A | January 30, 2025 | 161 Calendar Days | ||||||||||||||||
42 | 30 | 0013-25 | Construction of Water System Molocboloc, Alubijid, Misamis Oriental | 2,537,660.52 | Alubijid, Misamis Oriental | NONE | N/A | N/A | January 30, 2025 | 60 Calendar Days | ||||||||||||||||
43 | 31 | 0014-25 | Construction of Water System Tugasnon, Alubijid, Mis. Or. | 4,140,989.85 | Alubijid, Misamis Oriental | NONE | N/A | N/A | January 30, 2025 | 196 Calendar Days | ||||||||||||||||
44 | 32 | 0002-25 | Construction of Water System Lourdes, Alubijid, Misamis Oriental | 3,107,484.38 | Alubijid, Misamis Oriental | NONE | N/A | N/A | January 30, 2025 | 149 Calendar Days | ||||||||||||||||
45 | 33 | 0003-25 | Construction of Water System, Moog, Laguindingan, Misamis Oriental | 2,764,453.83 | Laguindingan, Misamis Oriental | NONE | N/A | N/A | January 30, 2025 | 125 Calendar Days | ||||||||||||||||
46 | 34 | 0001-25 | Construction of Water System Brgy. Kibaghot, Laguindingan, Misamis Oriental | 3,064,262.90 | Laguindingan, Misamis Oriental | NONE | N/A | N/A | January 30, 2025 | 142 Calendar Days | ||||||||||||||||
47 | 35 | 0015-25 | Construction of Water System Tubajon, Laguindingan, Misamis Oriental | 2,536,883.15 | Laguindingan, Misamis Oriental | NONE | N/A | N/A | January 30, 2025 | 40 Calendar Days | ||||||||||||||||
48 | 36 | 0012-25 | Rehabilitation of Water System, Upper Malubog, Manticao, Misamis Oriental | 2,996,464.93 | Manticao, Misamis Oriental | CAGALAWAN ENTERPRISES, INC. | Zone 3, Igpit Opol, Misamis Oriental | 2,994,033.00 | January 30, 2025 | 67 Calendar Days | ||||||||||||||||
49 | 37 | 0004-25 | Construction of Reservoir, Pontacon, Initao, Misamis Oriental | 1,803,907.41 | Initao, Misamis Oriental | EQUALYZ TRADING | Beside Greenfield Montessori School Brgy. Samapaloc Tanay Rizal | 1,802,937.77 | January 30, 2025 | 36 Calendar Days | ||||||||||||||||
50 | 38 | 0007-25 | Completion of Multi-purpose Building, Cogon, Balingasag, Misamis Oriental | 1,499,946.61 | Balingasag, Misamis Oriental | STPK CONSTRUCTION SERVICES | Lower Zone 6 Bulua, Cagayan de Oro City | 1,495,620.70 | January 30, 2025 | 23 Calendar Days | ||||||||||||||||
51 | 39 | 0010-25 | Construction of Child Development Center, Mambayaan, Balingasag, Misamis Oriental | 3,692,561.26 | Balingasag, Misamis Oriental | TRIFOLD CONST. SERVICES | Brgy. 26 Gingoog City | 3,682,479.14 | January 30, 2025 | 66 Calendar Days | ||||||||||||||||
52 | 40 | 0009-25 | Construction of Solar Dryer, Valdeconcha, Binuangan, Misamis Oriental | 999,999.00 | Binuangan, Misamis Oriental | CAGALAWAN ENTERPRISES, INC. | Zone 3, Igpit Opol, Misamis Oriental | 999,300.40 | January 30, 2025 | 30 Calendar Days | ||||||||||||||||
53 | 41 | 0054-25 | Construction of Perimeter Fence ( Concrete Post with Interlink) & Gate at Talaba Elementary School, Alubijid, Misamis Oriental | 6,499,997.14 | Alubijid, Misamis Oriental | NONE | N/A | N/A | February 6, 2025 | 77 Calendar Days | ||||||||||||||||
54 | 42 | 0082-25 | Construction of Water System Brgy. Taparak, Alubijid, Misamis Oriental | 4,536,978.47 | Alubijid, Misamis Oriental | NONE | N/A | N/A | February 6, 2025 | 90 Calendar Days | ||||||||||||||||
55 | 43 | 0056-25 | Rehabilitation of Greenhouse in MOPADC (3units; 10 bays) Claveria, Misamis Oriental | 12,899,950.30 | Claveria, Misamis Oriental | NONE | N/A | N/A | February 6, 2025 | 157 Calendar Days | ||||||||||||||||
56 | 44 | 0016-25 | Construction of Barangay Health Center and Nutrition Office Poblacion 3 Villanueve, Misamis Oriental | 13,680,091.63 | Villanueve, Misamis Oriental | CAGALAWAN ENTERPRISES, INC. | Zone 3, Igpit Opol, Misamis Oriental | 13,676,523.63 | February 6, 2025 | 141 Calendar Days | ||||||||||||||||
57 | 45 | 0020-25 | Construction of Spillway at Barangay Digkilaan, Manticao, Misamis Oriental | 10,497,970.11 | Manticao, Misamis Oriental | CAGALAWAN ENTERPRISES, INC. | Zone 3, Igpit Opol, Misamis Oriental | 10,488,580.20 | February 6, 2025 | 101 Calendar Days | ||||||||||||||||
58 | 46 | 0017-25 | Improvement of Water System, Balingoan, Misamis Oriental | 5,499,947.49 | Balingoan, Misamis Oriental | EQUALYZ TRADING | Beside Greenfield Montessori School Brgy. Samapaloc Tanay Rizal | 5,498,933.44 | February 6, 2025 | 80 Calendar Days | ||||||||||||||||
59 | 47 | 0019-25 | Construction of Footbridge Purok 3, Rosario, Balingasag, Misamis Oriental | 9,478,691.09 | Balingasag, Misamis Oriental | BZAR CONSTRUCTION | Gadongan, Marawi Ciy, Lanao del Sur | 9,477,939.00 | February 6, 2025 | 64 Calendar Days | ||||||||||||||||
60 | 48 | 0006-25 | Cosntruction of Perimeter Fence at Tula Elementary School, Alubijid Misamis Oriental | 4,998,574.75 | Alubijid Misamis Oriental | Y CONSTRUCTION & SUPPLY | Purok 12, Brgy. Damilag Manolo Fortich, Bukidnon | 4,997,000.75 | February 6, 2025 | 76 Calendar Days | ||||||||||||||||
61 | 49 | 0036-25 | Construction of Water System Barangay Balintad, Manticao, Misamis Oriental | 1,642,635.52 | Manticao, Misamis Oriental | CAGALAWAN ENTERPRISES, INC. | Zone 3, Igpit Opol, Misamis Oriental | 1,639,244.56 | February 6, 2025 | 40 Calendar Days | ||||||||||||||||
62 | 50 | 0011-25 | Construction of Child Development Center, Brgy. Poblacion, Alubijid Misamis Oriental | 3,794,380.43 | Alubijid Misamis Oriental | Y CONSTRUCTION & SUPPLY | Purok 12, Brgy. Damilag Manolo Fortich, Bukidnon | 3,793,880.43 | February 6, 2025 | 67 Calendar Days | ||||||||||||||||
63 | 51 | 0008-25 | Construction of Covered Court Concrete Bleachers Brgy. Tula, Alubijid, Misamis Oriental | 1,376,895.80 | Alubijid Misamis Oriental | CAGALAWAN ENTERPRISES, INC. | Zone 3, Igpit Opol, Misamis Oriental | 1,376,012.32 | February 6, 2025 | 64 Calendar Days | ||||||||||||||||
64 | 52 | 0037-25 | Construction of Water System Brgy. San Isidro, Balingasag, Misamis Oriental | 3,642,187.42 | Balingasag, Misamis Oriental | NONE | N/A | N/A | February 6, 2025 | 161 Calendar Days | ||||||||||||||||
65 | 53 | 0155-25 | Construction of Stage Roofing & Storage Cabinet of Covered Court Honga Gue National High School, Inobulan, Misamis Oriental | 1,093,314.78 | Inobulan, Misamis Oriental | NONE | N/A | N/A | February 13, 2025 | 38 Calendar Days | ||||||||||||||||
66 | 54 | 0035-25 | Construction of 1 storey 4 Classroom School Building Pamalihi Elementary School, Samay, Balingasag, Misamis Oriental | 7,448,828.62 | Balingasag, Misamis Oriental | TCA CONCEPT BUILDERS & SERVICES | 8 Lt. Amb. F. Neri Street Blue Mountains, Sta. Cruz, Antipolo City Rizal 1980 | 7,447,952.00 | February 13, 2025 | 105 Calendar Days | ||||||||||||||||
67 | 55 | 0050-25 | Construction of Child Development Center San Roque Aposkahoy Claveria, Misamis Oriental | 3,663,708.92 | Claveria, Misamis Oriental | RAM DAAN CONSTRUCTION | 6th Division Zosima Gaboa St. Patag, CDO | 3,641,778.54 | February 13, 2025 | 66 Calendar Days | ||||||||||||||||
68 | 56 | 0053-25 | Construction of Child Development Center, Salagsag, Salay, at Brgy. Salagsa, Salay Misamis Oriental | 3,529,985.53 | Salay Misamis Oriental | FJQ CONSTRUCTION | Zone 6B, National Highway Brgy. Cugman, Cagayan de Oro City | 3,525,331.22 | February 13, 2025 | 72 Calendar Days | ||||||||||||||||
69 | 57 | 0051-25 | Construction of Child Development Center Brgy. Solana, Jasaan Misamis Oriental | 3,924,217.29 | Jasaan Misamis Oriental | CAGALAWAN ENTERPRISES, INC. | Zone 3, Igpit Opol, Misamis Oriental | 3,923,229.85 | February 13, 2025 | 66 Calendar Days | ||||||||||||||||
70 | 58 | 0052-25 | Construction of Day Care Center Brgy. San Isidro, Magsaysay Misamis Oriental | 3,085,923.57 | Magsaysay Misamis Oriental | NONE | N/A | N/A | February 13, 2025 | 61 Calendar Days | ||||||||||||||||
71 | 59 | 0005-25 | Construction of Water System Brgy. Lagtang, Alubijid, Misamis Oriental | 3,598,315.63 | Alubijid, Misamis Oriental | FIRST-MASEM DRILLING INC. | Zone 1, Igpit, Opol, Misamis Oriental | 3,503,000.00 | February 20, 2025 | 90 Calendar Days | ||||||||||||||||
72 | 60 | 0013-25 | Construction of Water System Molocboloc, Alubijid, Misamis Oriental | 2,537,660.52 | Alubijid, Misamis Oriental | FIRST-MASEM DRILLING INC. | Zone 1, Igpit, Opol, Misamis Oriental | 2,420,000.00 | February 20, 2025 | 91 Calendar Days | ||||||||||||||||
73 | 61 | 0014-25 | Construction of Water System Tugasnon, Alubijid, Mis. Or. | 4,140,989.85 | Alubijid, Misamis Oriental | FIRST-MASEM DRILLING INC. | Zone 1, Igpit, Opol, Misamis Oriental | 4,075,000.00 | February 20, 2025 | 90 Calendar Days | ||||||||||||||||
74 | 62 | 0002-25 | Construction of Water System Lourdes, Alubijid, Misamis Oriental | 3,107,484.38 | Alubijid, Misamis Oriental | FIRST-MASEM DRILLING INC. | Zone 1, Igpit, Opol, Misamis Oriental | 3,042,125.00 | February 20, 2025 | 88 Calendar Days | ||||||||||||||||
75 | 63 | 0003-25 | Construction of Water System, Moog, Laguindingan, Misamis Oriental | 2,764,453.83 | Laguindingan, Misamis Oriental | FIRST-MASEM DRILLING INC. | Zone 1, Igpit, Opol, Misamis Oriental | 2,670,000.00 | February 20, 2025 | 96 Calendar Days | ||||||||||||||||
76 | 64 | 0001-25 | Construction of Water System Brgy. Kibaghot, Laguindingan, Misamis Oriental | 3,064,262.90 | Laguindingan, Misamis Oriental | FIRST-MASEM DRILLING INC. | Zone 1, Igpit, Opol, Misamis Oriental | 2,987,412.00 | February 20, 2025 | 105 Calendar Days | ||||||||||||||||
77 | 65 | 0054-25 | Construction of Perimeter Fence ( Concrete Post with Interlink) & Gate at Talaba Elementary School, Alubijid, Misamis Oriental | 6,499,997.14 | Alubijid, Misamis Oriental | CAGALAWAN ENTERPRISES, INC. | Zone 3, Igpit Opol, Misamis Oriental | 6,498,614.87 | February 20, 2025 | 77 Calendar Days | ||||||||||||||||
78 | 66 | 0082-25 | Construction of Water System Brgy. Taparak, Alubijid, Misamis Oriental | 4,536,978.47 | Alubijid, Misamis Oriental | PARV ENGINEERING SERVICES | Damilag, Manolo Fortich, Bukidnon | 4,534,590.63 | February 20, 2025 | 90 Calendar Days | ||||||||||||||||
79 | 67 | 0056-25 | Rehabilitation of Greenhouse in MOPADC (3units; 10 bays) Claveria, Misamis Oriental | 12,899,950.30 | Claveria, Misamis Oriental | NETAPHILS INC. | N/A | 12,797,559.98 | February 20, 2025 | 157 Calendar Days | ||||||||||||||||
80 | 68 | 0155-25 | Construction of Stage Roofing & Storage Cabinet of Covered Court Honga Gue National High School, Inobulan, Misamis Oriental | 1,093,314.78 | Inobulan, Misamis Oriental | E & P BUILDERS | Morning Mist Village, Upper Carmen, Cagayan de Oro City | 1,090,159.29 | February 27, 2025 | 38 Calendar Days | ||||||||||||||||
81 | 69 | 0052-25 | Construction of Day Care Center Brgy. San Isidro, Magsaysay Misamis Oriental | 3,085,923.57 | Magsaysay Misamis Oriental | TCA CONCEPT BUILDERS & SERVICES | 8 Lt. Amb. F. Neri Street Blue Mountains, Sta. Cruz, Antipolo City Rizal 1980 | 3,084,691.00 | February 27, 2025 | 61 Calendar Days | ||||||||||||||||
82 | 70 | 0413-25 | Proposed Water Analysis Laboratory Area Capitol Compound, Cagayan de Oro City | 1,211,876.28 | Capitol Compound, Cagayan de Oro City | NONE | N/A | N/A | March 13, 2025 | 30 Calendar Days | ||||||||||||||||
83 | 71 | 0411-25 | Construction of Comfort Room and Dressing Room at Initao National Comprehensive High School, Jampason, Initao, Misamis Oriental | 1,687,457.61 | Initao, Misamis Oriental | NONE | N/A | N/A | March 13, 2025 | 66 Calendar Days | ||||||||||||||||
84 | 72 | 0402-25 | Construction of Interiors & Room Extension for Provincial Library Provincial Capitol Compound, Cagayan de Oro City | 1,498,673.83 | Capitol Compound, Cagayan de Oro City | NONE | N/A | N/A | March 13, 2025 | 48 Calendar Days | ||||||||||||||||
85 | 73 | 0400-25 | Proposed Construction of Student Maker Space at USTP Min Campus Phase-1 Barangay Lourdes, Alubijid, Misamis Oriental | 1,899,956.34 | Alubijid, Misamis Oriental | NONE | N/A | N/A | March 13, 2025 | 55 Calendar Days | ||||||||||||||||
86 | 74 | 0037-25 | Construction of Water System Brgy. San Isidro, Balingasag, Misamis Oriental | 3,642,187.42 | Balingasag, Misamis Oriental | FIRST-MASEM DRILLING INC. | Zone 1, Igpit, Opol, Misamis Oriental | 3,612,001.87 | March 20, 2025 | 100 Calendar Days | ||||||||||||||||
87 | 75 | 0412-25 | Construction of Water System Barangay Sinai, Laguindingan, Misamis Oriental | 2,984,409.82 | Laguindingan, Misamis Oriental | NONE | N/A | N/A | March 20, 2025 | 86 Calendar Days | ||||||||||||||||
88 | 76 | 0413-25 | Proposed Water Analysis Laboratory Area Capitol Compound, Cagayan de Oro City | 1,211,876.28 | Capitol Compound, Cagayan de Oro City | E & P BUILDERS | Morning Mist Village, Upper Carmen, Cagayan de Oro City | 1,200,000.00 | March 27, 2025 | 30 Calendar Days | ||||||||||||||||
89 | 77 | 0411-25 | Construction of Comfort Room and Dressing Room at Initao National Comprehensive High School, Jampason, Initao, Misamis Oriental | 1,687,457.61 | Initao, Misamis Oriental | ABAYCER CONST. SUPPLIES & GEN MDSE. | Bulua, Cagayan de Oro City | 1,686,233.80 | March 27, 2025 | 66 Calendar Days | ||||||||||||||||
90 | 78 | 0402-25 | Construction of Interiors & Room Extension for Provincial Library Provincial Capitol Compound, Cagayan de Oro City | 1,498,673.83 | Capitol Compound, Cagayan de Oro City | 3L & JES CONSTRUCTION | N/A | 1,477,911.58 | March 27, 2025 | 48 Calendar Days | ||||||||||||||||
91 | 79 | 0400-25 | Proposed Construction of Student Maker Space at USTP Min Campus Phase-1 Barangay Lourdes, Alubijid, Misamis Oriental | 1,899,956.34 | Alubijid, Misamis Oriental | BZAR CONSTRUCTION | Gadongan, Marawi Ciy, Lanao del Sur | 1,898,471.80 | March 27, 2025 | 55 Calendar Days | ||||||||||||||||
92 | ||||||||||||||||||||||||||
93 | We hereby certify that we have reviewed the contents and hereby attest to the veracity and correctness of the data or information contained in this document. | |||||||||||||||||||||||||
94 | ||||||||||||||||||||||||||
95 | ||||||||||||||||||||||||||
96 | ||||||||||||||||||||||||||
97 | ||||||||||||||||||||||||||
98 | SGD. | SGD. | ||||||||||||||||||||||||
99 | JACQUILINE M. NOBLE | FILEMON R. AGUILAR JR. | ||||||||||||||||||||||||
100 | BAC Secretariat Head | BAC Chairperson | ||||||||||||||||||||||||