ABCDEFGHKLMNOPTUVWXYZAAABACADAEAFAGAHAIAJAKALAMANAOAP
1
NotesThe commercial subcommittee of the Illinois Energy Code Advisory Council voted to use 2024 IECC-C public comment draft #1 as the basis for the Illinois commercial stretch energy code prior to public comment, and voted to reaffirm after public comment on 3/29/23. Proposals included in the draft are generally included in stretch code consideration. Proposals not included in the draft are shown in light green in this spreadsheet.The 2024 IECC Public Comment Draft #1 is online here.Additional proposals for the Illinois stretch code are described as amendments tothe 2024 IECC-C Public Comment Draft #1 here. This draft code language was approved for presentation for public comment by the IL ECAC commercial subcommittee in a 9-0 vote on 4/12/23.
2
formatting assist: link 1formatting assist: IDformatting assist: URLCode Change # (cdpAccess)Code Change # (if applicable) and LinkShort DescriptionCode Topic 1 (IECC)Long DescriptionTypeIL Energy Code Advisory Council Decision #1 (Re. Proceeding to Public Comment)IL ECAC Decision #1 DateIL ECAC Decision #2 (Post Public Comment Period 1)IECC-C Committee Action Prior to Public Comment (If Applicable)
3
135n/aSubstantial improvement definition changeExisting buildingsFor the purposes of defining a "substantial improvement," define "market value" as "cost to replace." Therefore, a substantial improvement is a change to the building the costs at least 50% of what it would cost to build the building today.IECAC Amendmentn/an/aYes (6 to 0, 3/15/23)
Yes to edit definition to be more specific about how to define cost and who estimates and approves cost (9 to 0, 4/12/23)
4
136Appendix language from NRDC commentAll-electric appendixn/aAn optional-to-localities appendix that would require new buildings to be all-electric.IL Stretch Public Comment Amendment - Optional-to-Localities Appendixn/an/aYes (8 to 0, 3/1/23)
5
New1ASHRAE 90.1-2019, Normative Appendix GRequire ASHRAE 90.1 Appendix G for Performance PathPerformance PathRequires that the performance path provided in ASHRAE 90.1 Appendix G be used instead of the IECC-specific performance path.IECAC AmendmentNo (9 to 0)12/1/22Not applicable (not in IECC-C 2024 draft)
6
https://energy.cdpaccess.com/proposal/408/1234/preview/https://energy.cdpaccess.com/live/proposal/408/html/CEPI-217-2133CEPI-217-21Existing Buildings Additional Efficiency CreditsExisting BuildingsCreates new Section C506 to require C406 credits from additions.2024 IECC-C DraftYes (5 to 2)12/15/2022approved as
modified
7
https://energy.cdpaccess.com/proposal/285/1230/preview/https://energy.cdpaccess.com/live/proposal/285/html/CEPI-219-2134CEPI-219-21Alteration Duct TestingExisting BuildingsRequires testing of ducts serving additions.2024 IECC-C DraftYes (5 to 2)12/15/2022approved as
modified
8
https://energy.cdpaccess.com/proposal/422/https://energy.cdpaccess.com/live/proposal/422/html/CEPI-221-2135CEPI-221-21Alterations building envelopeExisting BuildingsCreates additional requirements for insulation in alterations2024 IECC-C DraftYes (5 to 2)12/15/2022approved as
modified
9
https://energy.cdpaccess.com/proposal/397/https://energy.cdpaccess.com/live/proposal/397/html/CEPI-225-2136CEPI-225-21Definitions and Roof ReplacementExisting BuildingsLimits roof insulation exception to roof replacement to designs where an "approved source" demonstrates that it is not possible.2024 IECC-C DraftYes (5 to 2)12/15/2022approved as
modified
10
https://energy.cdpaccess.com/proposal/319/https://energy.cdpaccess.com/live/proposal/319/html/CEPI-227-2137CEPI-227-21Alterations HVAC controlsExisting BuildingsRequires new HVAC equipment to have code compliant controls.2024 IECC-C DraftYes (5 to 2)12/15/2022approved as
modified
11
https://energy.cdpaccess.com/proposal/278/https://energy.cdpaccess.com/live/proposal/278/html/CEPI-228-2138CEPI-228-21Alterations sizing hvac equipmentExisting BuildingsRequires new HVAC equipment be right-sized.2024 IECC-C DraftYes (5 to 2)12/15/2022approved as
modified
12
https://energy.cdpaccess.com/proposal/281/https://energy.cdpaccess.com/live/proposal/281/html/CEPI-229-2139CEPI-229-21Alterations acceptance testingExisting BuildingsRequires retrocommissioning of HVAC systems when new equipment is installed2024 IECC-C DraftYes (5 to 2)12/15/2022approved as
modified
13
https://energy.cdpaccess.com/proposal/310/https://energy.cdpaccess.com/live/proposal/310/html/CEPI-220-2187CEPI-220-21Pool and Spa referenceExisting BuildingsCorrects pool and permanent spa reference.2024 IECC-C DraftYes (5 to 2)12/15/2022approve
14
347https://energy.cdpaccess.com/live/proposal/347/html/CEPI-226-2188CEPI-226-21Roof replacement editorial 2Existing BuildingsEditorial correction. (change "roof replacements" to "A roof replacement")2024 IECC-C DraftYes (5 to 2)12/15/2022approved as
modified
15
277https://energy.cdpaccess.com/live/proposal/277/html/CEPI-232-2190CEPI-232-21Change of OccupancyExisting BuildingsClarifies requirements for spaces undergoing a change of occupancy2024 IECC-C DraftYes (5 to 2)12/15/2022approved as
modified
16
CECPI-002-21129CECPI-002-21Comm Min. Renewables CapLighting & PowerMandatory on-site renewables for all commercial buildings (0.75W/s.f.) (exceptions allowing off-site allowed)2024 IECC-C DraftYes (5 to 2)11/7/2022approve
17
CECPI-001-21124CECPI-001-21EV combined proposalLighting & Powersets standards for number of EV charging spots required as well as EV ready and EV capable.2024 IECC-C DraftYes (5 to 3)11/7/2022approve
18
New123Existing Building Decarbonization Code, p. 22, C503.3.6 Cooling equipment.Replace air conditioners with heat pumpsMechanicalRequires that air conditioner replacements be heat pumps capable of heating or cooling air, and provides for existing heating equipment to be configured as supplementary equipmentIECAC AmendmentYes (6 to 3)1/10/2023No (8 to 0, 3/15/23)Not applicable (not in IECC-C 2024 draft)
19
New122ASHRAE 189.1 Addenda acElectric-ReadyLighting & PowerRequires adequate panel capacity for electric replacements where gas appliances are installed, and wiring run to locations of those appliancesIECAC AmendmentYes (7 to 0)11/7/2022Yes for R2 Occupancy Only; No for Other Building Types (6 to 2, 3/15/23)
Yes to two language amendments: remove reference to commercial cooking equipment and clarify that R2 occupancy areas of mixed use buildings must comply, while other parts of mixed use buildings need not comply (9 to 0, 4/12/23)
Not applicable (not in IECC-C 2024 draft)
20
132Appendix CCZero Energy AppendixPackages/PointsFormally include the Zero Energy Appendix as part of the stretch code.IECAC AmendmentYes (7 to 0)12/15/2022Yes to add net zero option as a compliance path (8 to 0, 3/1/23)
21
CEPI-193-2120CEPI-193-21Energy and Demand Response CreditsPackages/PointsChange to package of credit options to achieve large share of code energy savings, including renewable and load mgmt requirements, and update tables for additonal energy efficiency credits. For IL, demand response and renewable options must be removed to comply with CEJA energy efficiency target requirements.2024 IECC-C DraftYes (7 to 1)11/7/2022approved as
modified
22
CEPI-099-21125CEPI-099-21Grid Integrated Thermostat ControlsMechanicalIntroduces requirement that all thermostatic controls be provided with grid-integrated controls2024 IECC-C DraftYes (7 to 1)11/7/2022approved as
modified
23
CEPI-125-21126CEPI-125-21Grid Integrated Water HeatingMechanicalRequires electric storage water heaters to be grid integrated using CTA-2045B2024 IECC-C DraftYes (7 to 1)11/7/2022approved as
modified
24
CEPI-176-21127CEPI-176-21Lighting demand responsive controlLighting & PowerAdds demand responsive lighting control requirements 2024 IECC-C DraftYes (7 to 1)11/7/2022approved as
modified
25
184https://energy.cdpaccess.com/live/proposal/184/html/CEPI-142-21128CEPI-142-21Commercial Grid Integrated InvertersLighting & PowerRequires grid integrated solar inverters2024 IECC-C DraftYes (7 to 1)11/7/2022approved as
modified
26
New21Existing Building Decarbonization Code, p. 8-9, SUBSTANTIAL ENERGY ALTERATION.Substantial energy alterationExisting BuildingsCreates a new definition defining "substantial energy alterations" requiring compliance with the same efficiency targets/measures as new buildings under Chapter 5.IECAC AmendmentYes (7 to 2)1/10/2023Not applicable (not in IECC-C 2024 draft)
27
134CEDI-191Heat pump pointsPackages/PointsRequires more non-mechanical energy efficiency credits to be achieved in buildings that do not use heat pumps for space heating and cooling.2024 IECC-C Proposal (Not in Public Comment Draft #1)Yes (8 to 0)11/7/2022
28
New22Existing Building Decarbonization Code, p. 9, SUBSTANTIAL IMPROVEMENT.Substantial improvementExisting BuildingsAdds definition used in IBC and IEBC to IECC.IECAC AmendmentYes (8 to 1)1/10/2023Not applicable (not in IECC-C 2024 draft)
29
133PHIUS+ Commercial Building StandardPHIUS CertificationPerformance PathIn alignment with CEJA's requirement to allow certification as an allowed compliance option, name PHIUS as the accepted certification.IECAC Amendment (To Satisfy CEJA Requirement)Yes to accept PHIUS and listen in public comment for additional recommended certifications (9 to 0)12/1/2022
30
New23Proposed Addendum ch to Standard 90.1-2019, Energy Standard for Buildings Except Low-Rise Residential BuildingsSite EUI or Carbon BPFPerformance PathProvides for alternative performance metrics site energy or carbon in lieu of energy cost.IECAC Amendment (To Satisfy CEJA Requirement)Yes, specifically to require site EUI as the performance metric (7 to 0)12/1/2022Not applicable (not in IECC-C 2024 draft)
31
CEPI-007-21130CEPI-007-21Energy Storage ReadyLighting & PowerAdd "energy storage infrastructure" and "electrical service reserved space". 2024 IECC-C DraftYes, while seeking Illinois fire marshal comment during public comment period (6 to 0)11/28/2022approved as
modified
32
CECPI-003-212CECPI-003-21Consensus Air Leakage RestructuringEnvelopeRestructures Section C402.5 with the intent of improving clarity. Some additional requirements contained in CEPI-57 and CEPI-58 are included.2024 IECC-C Draftapproved as
modified
33
CECPI-007-213CECPI-007-21Indoor Lighting EfficiencyLighting & PowerImproves indoor lighting efficiency.2024 IECC-C Draftapproved as
modified
34
CEPI-065-214CEPI-065-21Operable opening interlockingEnvelopeRemove duplication, improve description of code intent and relocate mechanical controls provision to the appropriate location within the code.2024 IECC-C Draftapproved as
modified
35
CEPI-077-215CEPI-077-21Boiler High Capacity Space Heating GasMechanicalImplementation oriented to ensure that condensing boilers operate as they should (and at their most efficient)2024 IECC-C Draftapproved as
modified
36
CEPI-097-216CEPI-097-21Boiler ControlsMechanicalIntroduces requirements for boiler oxygen controls, combustion air controls, and variable fan motors for larger boilers, thereby improving part-load performance2024 IECC-C Draftapproved as
modified
37
CEPI-102-217CEPI-102-21Humidity ControlsMechanicalIntroduces requirements for controlled HVAC systems to (1) control humidity levels and (2) avoid simulaneous humidification and dehumidification. This avoids wasting energy by over-(de)humidifying.2024 IECC-C Draftapproved as
modified
38
CEPI-107-218CEPI-107-21Direct digital control airflow ratesMechanicalIncreases efficiency of both compliance options for multi-zone VAV systems with DDC: eliminates the blanket allowance to use 20% of the peak airflow rate in option 1 and the 20% floor in Option 2.2024 IECC-C Draftapprove
39
CEPI-108-219CEPI-108-21Ventilation Occupied Standby ControlsMechanicalIntroduces occupied-standby definition and requirements to reduce HVAC loads for multi-zone systems.2024 IECC-C Draftapproved as
modified
40
CEPI-110-2110CEPI-110-21HVAC Demand control ventilationMechanicalClarifies DCV section and removes unnecessary exception for multi-zone systems without DDC. Requirements vary within IL climate zones.2024 IECC-C Draftapproved as
modified
41
CEPI-113-2111CEPI-113-21ERV Nontransient dwelling unitsMechanicalRequires ERV be balanced and increases the exceptions for the ERV requirements for high-rise dwelling units2024 IECC-C Draftapproved as
modified
42
CEPI-119-2112CEPI-119-21Fan Power LimitsMechanicalUpdate fan power limits for HVAC systems based on Title 24-20222024 IECC-C Draftapproved as
modified
43
CEPI-120-2113CEPI-120-21Central Fan Integrated efficacyMechanicalMore efficient fan motors and design for dwelling units that ensures that fans are not used for both heating/cooling and OA together2024 IECC-C Draftapproved as
modified
44
CEPI-130-2114CEPI-130-21Service water heating insulationHot WaterUpdates piping insulation requirements for service water heating systems to align with ASHRAE 90.12024 IECC-C Draftapproved as
modified
45
CEPI-135-2115CEPI-135-21Sleeping unit lighting powerLighting & PowerSimplified requirements by removing LPD option for sleeping areas and dwelling units2024 IECC-C Draftapproved as
modified
46
CEPI-156-2116CEPI-156-21Lighting Dimming controlsLighting & PowerReplaces light reduction controls with dimming controls because with LED technology, this is the standard lighting reduction control design.2024 IECC-C Draftapproved as
modified
47
CEPI-164-2117CEPI-164-21Daylighting ControlsLighting & PowerReduce wattage minimum for daylight responsive controls to account for LEDs2024 IECC-C Draftapproved as
modified
48
CEPI-173-2118CEPI-173-21Lighting Parking Lot Activity SensorsLighting & PowerReduces lighting power allowance for luminaires serving outdoor parking areas.2024 IECC-C Draftapprove
49
CEPI-189-2119CEPI-189-21Lighting exterior updatesLighting & PowerReduces lighting power allowances for building exteriors to account for LED lighting2024 IECC-C Draftapproved as
modified
50
CECPI-004-2124CECPI-004-21Thermal Bridging Consensus proposalEnvelopeEstablishes a practical mitigation method (enhances existing code requirements by measuring what is required) for thermal bridging at interfaces2024 IECC-C Draftapproved as
modified
51
CEPI-076-2125CEPI-076-21HVAC Total System PerformanceMechanicalIntroduces an alternative path for HVAC compliance that allows tradeoffs between efficiency features through a TSPR: alternative C403 compliance path, C406 option, and Stretch Code appendix requirement2024 IECC-C Draftapproved as
modified
52
CEPI-127-2126CEPI-127-21Water Heating Efficiency TableHot WaterUpdates water heating equipment performance tables with new UEF metric/values based on appliance standards program2024 IECC-C Draftapproved as
modified
53
CEPI-128-2127CEPI-128-21Water Heater Efficiency High CapacityHot WaterRequires a 92% efficiency when multiple water heaters are connected to the same system. Exception for renewables is removed.2024 IECC-C Draftapproved as
modified
54
CEPI-138-2128CEPI-138-21Energy Monitoring ExpansionLighting & PowerModifies the requirement for energy monitoring from buildings larger than 25,000 sf to bldgs larger than 10,000 sf 2024 IECC-C Draftapproved as
modified
55
CEPI-140-2129CEPI-140-21EV Energy MonitoringLighting & PowerRequires energy monitoring of electric vehicle charging loads2024 IECC-C Draftapproved as
modified
56
CEPI-185-2130CEPI-185-21Lighting HorticultureLighting & PowerIncreases efficacy requirements for horticultural lighting from 1.6 umol/J to 1.9umol/J2024 IECC-C Draftapprove
57
https://energy.cdpaccess.com/proposal/453/https://energy.cdpaccess.com/live/proposal/453/html/CEPI-203-2131CEPI-203-21Disclosing Energy Use for >50k sqft BuildingsPerformance PathRequires EUI declaration for buildings 50,000 sf & larger after 12 mo of occupancy2024 IECC-C Draftapproved as
modified
58
CEPI-215-2132CEPI-215-21Commissioning ExpansionMechanicalLimits mech system & servide water heater exemption for commissioning to buildings with less than 10,000 sqft and combined heating, cooling, water heating capacity less than 960,000 Btu/h2024 IECC-C Draftapprove
59
https://energy.cdpaccess.com/proposal/547/https://energy.cdpaccess.com/live/proposal/547/html/CEPI-131-2140CEPI-131-21Service water heating pumpHot WaterRequires ECM motors for hot water circulation systems and thermostatic balancing valuves to optimize hot water flow.2024 IECC-C Draftapproved as
modified
60
https://energy.cdpaccess.com/proposal/78/https://energy.cdpaccess.com/live/proposal/78/html/CEPI-152-2141CEPI-152-21Lighting Safety exceptionLighting & PowerClairifies safety exception for lighting controls to enhance safety, reduce loopholes and reduce energy use2024 IECC-C Draftapproved as
modified
61
https://energy.cdpaccess.com/proposal/171/1145/preview/https://energy.cdpaccess.com/live/proposal/171/html/CEPI-29-2142CEPI-29-21Envelope Mechanical PenetrationsEnvelopeA large amount of energy is lost with through-wall mechanical equipment penetrations in building envelopes. This proposal, which has been in effect in New York City since 2016, amends the code to require that these areas of lower thermal value are accounted for when demonstrating compliance.2024 IECC-C Draftapproved as
modified
62
https://energy.cdpaccess.com/proposal/322/https://energy.cdpaccess.com/live/proposal/322/html/CEPI-58-2143CEPI-58-21Air Barrier TestingEnvelopeThis amendment proposes exempting whole building leakage testing for buildings larger than 250,000 ft2 because of the technical and practical issues with testing these large buildings. This amendment also proposes different test thresholds for multifamily structures (Group R and I occupancies) that align with current industry practice in blower door testing for the multifamily market. The original air leakage testing threshold for residential buildings of 0.30 cfm/square foot tested at 50 Pascals was lowered to 0.20 cfm/square foot to align with the requirements in ASHRAE 62.22024 IECC-C Draftapproved as
modified
63
https://energy.cdpaccess.com/proposal/359/https://energy.cdpaccess.com/live/proposal/359/html/CEPI-61-2144CEPI-61-21Air Leakage applicabilityEnvelopeRemoves all exceptions to air leakage requirements2024 IECC-C Draftapproved as
modified
64
https://energy.cdpaccess.com/proposal/520/842/preview/https://energy.cdpaccess.com/live/proposal/520/html/CEPI-68-2145CEPI-68-21Envelope testing dwelling and sleeping unitEnvelopeRequires middle units be tested in multi-dwelling-or-sleeping-unit buildings and requires three rather than two units be tested in the case of failure. Aligns with RESNET guidelines.2024 IECC-C Draftapprove
65
https://energy.cdpaccess.com/proposal/150/https://energy.cdpaccess.com/live/proposal/150/html/CEPI-69-2146CEPI-69-21Air Barrier testing third partyEnvelopeThis proposal seeks to ensure that whole building air leakage and diagnostic test is conducted by an independent & qualified entity that is acceptable to the code official. Additionally, the proposal adds a new reference standard which provides consensus procedures for conducting the diagnostic testing specified in the code.2024 IECC-C Draftapproved as
modified
66
https://energy.cdpaccess.com/proposal/73/https://energy.cdpaccess.com/live/proposal/73/html/CEPI-71-2147CEPI-71-21Air Leakage reductionEnvelopeReduces the maximum air leakage requirement to a level consistent with a variety of other standards and technological improvements.2024 IECC-C Draftapproved as
modified
67
602https://energy.cdpaccess.com/live/proposal/602/html/CECPI-6-2148CECPI-6-21Parking garage ventilation systemsMechanicalIncreases stringency of parking garage ventilation requirements in alignment with ASHRAE 90.1 appendix d and in such a way that SSPC 90.1 has found cost effective.2024 IECC-C Draftapprove
68
111https://energy.cdpaccess.com/live/proposal/111/html/CEPI-100-2149CEPI-100-21HVACR start and stopMechanicalClarifies that HVAC automatic start/stop controls requirement only applies to DDC-controlled systems; Exempts residential occupancies from this requirement2024 IECC-C Draftapproved as
modified
69
565https://energy.cdpaccess.com/live/proposal/565/html/CEPI-103-2150CEPI-103-21Economizer ExceptionMechanicalEliminates requirement to provide Economizer water coils in DX fan coils in non-VRF systems when paired with DOAS.2024 IECC-C Draftapproved as
modified
70
97https://energy.cdpaccess.com/live/proposal/97/html/CEPI-106-2151CEPI-106-21Outdoor Air ReliefMechanicalMakes current requirement more detailed to increase enforceability. Requiring return/relief fans or properly sized barometric relief will prevent overpressurization and thus save energy by allowing 100% economizing and avoiding Economizer shutoff.2024 IECC-C Draftapproved as
modified
71
108https://energy.cdpaccess.com/live/proposal/108/html/CEPI-112-2152CEPI-112-21Energy Recovery, seriesMechanicalGives greater flexibility to application of ERV2024 IECC-C Draftapprove
72
47https://energy.cdpaccess.com/live/proposal/47/html/CEPI-116-2153CEPI-116-21Exhaust Air RecoveryMechanicalNarrows the exceptions to ERV2024 IECC-C Draftapprove
73
107https://energy.cdpaccess.com/live/proposal/107/html/CEPI-118-2154CEPI-118-21Elevator dampersMechanicalElevator shaft vent dampers should be controled by thermostatic control systems to reduce air leakage.2024 IECC-C Draftapprove
74
248https://energy.cdpaccess.com/live/proposal/248/html/CEPI-12-21 Part I55CEPI-12-21 Part IBiomass definitionDefinitionsDelete without substitution "biomass". Add new definition for "biomass waste". Updates the language by further refining biomass energy sources & limits the biomass sources that count as renewable energy resources to those that are specified as waste products.2024 IECC-C Draftapproved as
modified
75
246https://energy.cdpaccess.com/live/proposal/246/html/CEPI-121-2156CEPI-121-21Fan Efficacy TableMechanicalAligns IECC fan efficacy tables with ASHRAE 90.1 and IECC-R fan efficacy tables.2024 IECC-C Draftapproved as
modified
76
161https://energy.cdpaccess.com/live/proposal/161/html/CEPI-123-2157CEPI-123-21Bathroom Intermittent Exhaust ControlMechanicalRequires timers for bathroom exhaust fans2024 IECC-C Draftapproved as
modified
77
197https://energy.cdpaccess.com/live/proposal/197/html/CEPI-124-2158CEPI-124-21Ceiling Fan Energy IndexMechanicalAdds efficiency requirements for large-diameter ceiling fans2024 IECC-C Draftapprove
78
379https://energy.cdpaccess.com/live/proposal/379/html/CEPI-133-2159CEPI-133-21Lighting general scopeLighting & PowerUpdates scope of lighting section of code to better reflect its requirements2024 IECC-C Draftapproved as
modified
79
https://energy.cdpaccess.com/proposal/220/https://energy.cdpaccess.com/live/proposal/220/html/CEPI-134-2160CEPI-134-21Data Center ClarificationLighting & PowerMoves requirements for Data Centers out of scope description in C405.1 and into new section2024 IECC-C Draftapprove
80
391https://energy.cdpaccess.com/live/proposal/391/html/CEPI-137-2161CEPI-137-21Lighting dwelling unitsLighting & PowerClarifies/simplifies code by refering exceptions to lighting for dwelling units to new Section C405.3.1.2024 IECC-C Draftapproved as
modified
81
526https://energy.cdpaccess.com/live/proposal/526/html/CEPI-14-2162CEPI-14-21Dedicated Out Air SystemsDefinitionsAdd new definitions for "dedicated outdoor air system" and "DX-dedicated outdoor air system units". Both DOAS and DX-DOAS terms are used in the IECC (in C403 and C406) but do not have definitions explaining what they are. These definitions are added to provide clarity when talking about DOAS and are coped from common definitions used in ASHRAE 90.1, the WA State Energy Code, and Title 24.2024 IECC-C Draftapproved as
modified
82
https://energy.cdpaccess.com/proposal/76/https://energy.cdpaccess.com/live/proposal/76/html/CEPI-147-2163CEPI-147-21Lighting Control editsLighting & PowerRemoves description of luminaire lighting controls to simplify the code2024 IECC-C Draftapprove
83
241https://energy.cdpaccess.com/live/proposal/241/html/CEPI-148-2164CEPI-148-21Lighting emergency hours reductionLighting & PowerReduces operating hours for emergency egress lighting by tying it to fire alarm system2024 IECC-C Draftapproved as
modified
84
https://energy.cdpaccess.com/proposal/102/https://energy.cdpaccess.com/live/proposal/102/html/CEPI-15-21 Part I65CEPI-15-21 Part IEmittance definitionDefinitionsAdd new definition for "emittance". This definition is needed because the term emittance is used in various sections of the code and in the definition for radiant barrier and reflective insulation2024 IECC-C Draftapprove
85
https://energy.cdpaccess.com/proposal/383/https://energy.cdpaccess.com/live/proposal/383/html/CEPI-150-2166CEPI-150-21Scope of Exterior LightingLighting & PowerClarifies scope of exterior lighting to only include lighting powered through the energy service of a building2024 IECC-C Draftapprove
86
https://energy.cdpaccess.com/proposal/433/https://energy.cdpaccess.com/live/proposal/433/html/CEPI-154-2167CEPI-154-21Remove light reduction controls exceptionLighting & PowerEliminate light reduction control exception for luminaires controlled by daylight responsive controls because LEDs controls for the most part do this already2024 IECC-C Draftapprove
87
569https://energy.cdpaccess.com/live/proposal/569/html/CEPI-16-21 Part I68CEPI-16-21 Part IFenestration definitionDefinitionsRevise the definition of "vertical fenestration". Only doors that are more than one half glazed will be defined as fenestrations in both the IECC and ASHRAE 90.1. Thereby clarifying the application of the IECC by more clearly stating that doors that are more than half glazed are included in the definition of vertical glazing.2024 IECC-C Draftapproved as
modified
88
https://energy.cdpaccess.com/proposal/83/https://energy.cdpaccess.com/live/proposal/83/html/CEPI-161-2169CEPI-161-21Remove Daylight Control ExceptionsLighting & PowerRemoves exception for daylight responsive controls because it is complicated and not necessary2024 IECC-C Draftapprove
89
381https://energy.cdpaccess.com/live/proposal/381/html/CEPI-166-2170CEPI-166-21Secondary Daylight ZonesLighting & PowerClarifies language describing secondary daylight zone2024 IECC-C Draftapprove
90
382https://energy.cdpaccess.com/live/proposal/382/html/CEPI-167-2171CEPI-167-21Daylight Zones and Envelope SectionsLighting & PowerMoves description of the count of daylight zones to another section2024 IECC-C Draftapprove
91
84https://energy.cdpaccess.com/live/proposal/84/html/CEPI-168-2172CEPI-168-21Display lightingLighting & PowerClarifies language by combining three different descriptions of display lighting into one.2024 IECC-C Draftapproved as
modified
92
497https://energy.cdpaccess.com/live/proposal/497/html/CEPI-169-2173CEPI-169-21Lighting guest room controlsLighting & PowerRemoves exception for automatic shut off of lights in hotels for captive card key controls because they do not save as much energy2024 IECC-C Draftapproved as
modified
93
https://energy.cdpaccess.com/proposal/357/https://energy.cdpaccess.com/live/proposal/357/html/CEPI-17-21 Part I74CEPI-17-21 Part IRoof Replacement editorial 1DefinitionsEditoral change to "roof replacement". This proposal revises the definition for roof replacement to reflect the intent and the scope of the roof replacement activity that takes place, which includes removal of all existing materials installed above the roof deck, removing those materials down to the roof deck, and installing a new roof assembly above the roof deck.2024 IECC-C Draftapprove
94
89https://energy.cdpaccess.com/live/proposal/89/html/CEPI-172-2175CEPI-172-21Clarification of outdoor lighting control requirements for non-business buildingsLighting & PowerExpands scope so that buildings that are not businesses must meet off-hour building facade and landscape lighting dimming or reduction requirements.2024 IECC-C Draftapprove
95
90https://energy.cdpaccess.com/live/proposal/90/html/CEPI-177-2176CEPI-177-21Entertainment lighting exception clarificationLighting & PowerThis proposal clarifies the exemption from interior and exterior lighting power requirements for the lighting for dressing room mirrors and for video production and live performance.2024 IECC-C Draftapproved as
modified
96
527https://energy.cdpaccess.com/live/proposal/527/html/CEPI-181-2177CEPI-181-21Lighing unfinished spacesLighting & PowerClarifies that the lighting power allowance and the total connected lighting power within an unfinished space cannot be included in the Space-by-space calculation for finished spaces. Prevents trading of lighting power between finished and unfinished areas.2024 IECC-C Draftapproved as
modified
97
385https://energy.cdpaccess.com/live/proposal/385/html/CEPI-187-2178CEPI-187-21Emergency lighting clarificationLighting & PowerClarifies that exceptions for lighting controls are for emergency lighting, not egress lighting, and leaves out language about business operation.2024 IECC-C Draftapproved as
modified
98
386https://energy.cdpaccess.com/live/proposal/386/html/CEPI-188-2179CEPI-188-21Exterior Lighting Residential ProvisionsLighting & PowerRemoves language in exception for lighting controlled in dwelling units that refers to residential code since those requirements are now in the commercial code.2024 IECC-C Draftapproved as
modified
99
339https://energy.cdpaccess.com/live/proposal/339/html/CEPI-19-21 Part I80CEPI-19-21 Part IInsulation labeling exceptionEnvelopeImproves consistency with labeling and inspection practice for above-deck roof insulation.2024 IECC-C Draftapproved as
modified
100
115https://energy.cdpaccess.com/live/proposal/115/html/CEPI-192-2181CEPI-192-21TransformersLighting & PowerUpdates transformer efficiencies to reflect federal efficiency standards.2024 IECC-C Draftapprove