4 | 1 | Mr. Pavithra | (60 & 70) Jetty Fire Pump House | Corrosion in exhaust silencers of diesel fire pumps, No tags in some valves. | - | Waiting for Heat Resistance paints from ENS | ||||||||||||||||||||
5 | 2 | Mr. Pavithra | (60 & 70) Jetty 01 | Damaged wind sock Corroded valves in MGO and VLSFO pipelines MGO valves with paint coating removed. | Done | |||||||||||||||||||||
6 | 3 | Mr. Pavithra | (60 & 70) Jetty 02 | Corroded valves in MGO & MFO pipelines valves with paint coating removed. | - | New valve- Done. Old valve- LPG. | ||||||||||||||||||||
7 | 4 | Mr. Poojitha | (20) 20 Pump House | 4.1) P-2101B oil level is low. 4.2) Some valve tags are missing. 4.3) Uploaded inspection checklists missing 'Approved By' signature. | Done | |||||||||||||||||||||
8 | 5 | Mr. Poojitha | (20) 20 Gantry | 5.1) Name tags are missing in some equipment. 5.2) Unnecessary items were seen on the platform. 5.3 ) Corrosion is seen in platform ladder in some devices at gantry. | Done | |||||||||||||||||||||
9 | 6 | Mr. Poojitha | (20) 20 Control Room | 6.1) 2 mice are missing. 6.2) Emergency light is not working. 6.3) Emergency items cabinet missing items. | - | 6.1) Need to purchase 6.2) ENS need to supply 6.3) - | ||||||||||||||||||||
10 | 7 | Mr. Dimuth | (20) CCR | Hoenywell panel triggering issue was not yet rectified | Done | |||||||||||||||||||||
11 | 8 | Mr. Poojitha | (20) CCR | 8.1) No marker pen stand and a/c remote holder. 8.2) Fungi is seen in soffit. 8.3) Cement filled sunk boxes near CCTV big screens are not finished well. | Done | |||||||||||||||||||||
12 | 9 | Mr. Poojitha | (20) 20 Tanks | 9.1) Wheels of hand valves of the tanks are corroded. 9.2) Name tags are missing especially in Nitrogen pipeline. 9.3) Tank dewatering valve tags are missing. 9.4) 'Approved By' signature is missing in uploaded inspection checklists. 9.5) Corroded flexible hoses. | 9.2&9.3) Done according to the P&ID 9.1) Need paint 9.5) Plan B | |||||||||||||||||||||
13 | 10 | Mr. Poojitha | (20) 20 Admin Building | 20 admin building is at a glance seen not properly organized. | ENS | |||||||||||||||||||||
14 | 11 | Mr. Geeth | ENS Admin Area | One of urinator push buttons is not working properly at 1st floor washroom | Done | |||||||||||||||||||||
15 | 12 | Mr. Prabath | (40 & 50) TF Substation Room | Few window locks have been broken | Done | |||||||||||||||||||||
16 | 13 | Mr. Randika | (40 & 50) TF Fire Pump House | A breakdown of an electric pump was reported during the period of evaluation and it was rectified. | Done | |||||||||||||||||||||
17 | 14 | Mr. Randika | (40 & 50) Warehouse | 14.1) A/C was not working during the time of evaluation. 14.2) PICs of some of the Five fixed signboards infront of the rooms needs to be changed. | 14.1) Done 14.4) Waiting for 5Fix board from ENS | |||||||||||||||||||||
18 | 15 | Mr. Randika | (40 & 50) Maintenance Workshop | 15.1) Hil T machine is not repaired yet. 15.2) Suggest to maintain good house keeping inside the tool room of workshop. | Done | |||||||||||||||||||||
19 | 16 | Mr. Randika | (40 & 50) Water Treatment Plant | An air blower is out of order. | No spare parts | |||||||||||||||||||||
20 | 2024 - September | |||||||||||||||||||||||||
21 | # | Evaluator | Facility | Remark | Required Time Period | Remarks | ||||||||||||||||||||
22 | 17 | Mr. Jihan | (60 & 70) Jetty Fire Pump House | Fire pump 1 out of order Need to clean cob webs | Done | |||||||||||||||||||||
23 | 18 | Mr. Pavithra | (60 & 70) Jetty Fire Pump House | Corroded exhaust silencers of fire pumps | Need Heat Resistance paint, ENS Supply. | |||||||||||||||||||||
24 | 19 | Mr. Jihan | (60 & 70) Jetty Control Room | Unnecessary material found on the rack | Done | |||||||||||||||||||||
25 | 20 | Mr. Pavithra | (60 & 70) Jetty Control Room | Fault fire alarm issue - Battery replacement | Done | |||||||||||||||||||||
26 | 21 | Mr. Jihan | (60 & 70) Jetty Substation Room | Old exhaust openings to be properly sealed Need to do some derusting | Done | |||||||||||||||||||||
27 | 22 | Mr. Pavithra | (60 & 70) Jetty Substation Room | Completed inspection checklist has not been handed over to the ENS Division as per the deadline. | Done | On 07/10/2024 | ||||||||||||||||||||
28 | 23 | Mr. Jihan | (60 & 70) Jetty Generator Room | Need derusting Steel tape to be place in a proper place | Done | Steel tape in CCR | ||||||||||||||||||||
29 | 24 | Mr. Jihan | (60 & 70) Jetty 01 | Manifold, Mounting bolts to be derust | Done | |||||||||||||||||||||
30 | 25 | Mr. Pavithra | (60 & 70) Jetty 01 | Corroded MGO, MFO pipeline valves | Done | |||||||||||||||||||||
31 | 26 | Mr. Jihan | (60 & 70) Jetty 02 | Mounting bolts to be derust need cleaning | Done | |||||||||||||||||||||
32 | 27 | Mr. Pavithra | (60 & 70) Jetty 02 | Corroded MGO & MFO pilpeline valves | Done | |||||||||||||||||||||
33 | 28 | Mr. Jihan | (60 & 70) Jetty 01 Tool Room | Tool room not locked, need cleaning | Done | Keys in CCR | ||||||||||||||||||||
34 | 29 | Mr. Pavithra | (60 & 70) Jetty 01 Tool Room | FFMS Sign board has been dismantled. Need to fix. | Done | |||||||||||||||||||||
35 | 30 | Mr. Wang | (60 & 70) High Mast Lighting | Some cable cabinet were corrosion | Done | |||||||||||||||||||||
36 | 31 | Mr. Wang | (30) 30 Tanks | Birds nest were observed on the tanks. | Done | Keep removing | ||||||||||||||||||||
37 | 32 | Mr. Poojitha | (20) 20 Pump House | Log sheets at document box is not long filled. Fixed gas detector hasn't been working. (Now rectified) Vent valve name tags not seen. | - | Some valves name tags were not in the P&ID.Available tags already done. | ||||||||||||||||||||
38 | 33 | Mr. Dimuth | (20) 20 Gantry | Corroded step ladder and light hanging chains | Done | |||||||||||||||||||||
39 | 34 | Mr. Poojitha | (20) 20 Gantry | No name tags for the strainer and flow meter of the pipeline. Lights on/off switch has no name tag and on/off switch position tag. | Done | Can not mark On/Off of Rotory switch | ||||||||||||||||||||
40 | 35 | Mr. Dimuth | (20) 20 Control Room | UPS problem | - | Waiting for New UPS, ENS supply. | ||||||||||||||||||||
41 | 36 | Mr. Poojitha | (20) 20 Control Room | Bird nest at washroom. Broken wall at washroom. | Done | |||||||||||||||||||||
42 | 37 | Mr. Kamal | (20) 20 Tanks | Corrosion was found on outer layer of flexible hoses connected to the tanks. | Done | |||||||||||||||||||||
43 | 38 | Mr. Poojitha | (20) 20 Tanks | No name plates for some valves. ex: dewatering lines. Valve handles corroded | Done | Some instrument does not indicating on given P&ID | ||||||||||||||||||||
44 | 39 | Mr. Geeth | (40 & 50) Fresh Water System | Grass has grown around system. | Done | |||||||||||||||||||||
45 | 40 | Mr. Geeth | Outside Pipeline Area | Grass has grown between the pipelines. | Done | |||||||||||||||||||||
46 | 41 | Mr. Geeth | (60 & 70) Jetty 02 Tool Room | Some material has not been kept in the designated location. Need to fix jetty 01 five fixed board. | Done | 5Fix board need to supply by ENS | ||||||||||||||||||||
47 | 42 | Mr. Xu | (30) 30 Pump House | Cable pipe under 1# pump's filter and filter's exhaust hose corrosion. The reflective sticker around the fire extinguisher was damaged. | Done | Paint & sticker need to sypplu by ENS | ||||||||||||||||||||
48 | 43 | Mr. Prabath | (30) 30 Pump House | There are dust and debris in the pump house | Done | Done during 5Fix | ||||||||||||||||||||
49 | 44 | Mr. Xu | (30) 30 Control Room | The washroom exhaust fan had a bird's nest. Fibre cables are not properly set up in electrical cabinets. | Done | |||||||||||||||||||||
50 | 45 | Mr. Xu | (40 & 50) TF Substation Room | several lamp tubes can't light. | Done | |||||||||||||||||||||
51 | 46 | Mr. Xu | (40 & 50) TF Generator Room | The safety exit light on the side door is missing. The generator SOP should be updated with the addition of the new air compressor. | Done | Exit light need to supply be ENS | ||||||||||||||||||||
52 | 47 | Mr. Xu | (40 & 50) Nitrogen Generation Skid | There Should be a cabinet for ear protection and other equipment. After the phone installation, some of the parts were not properly installed. Pressure gauges are not marked in red for limits. | Done | |||||||||||||||||||||
53 | 48 | Mr. Prabath | (40 & 50) Nitrogen Generation Skid | Neither FFM sign board nor person assigned for the facility | - | ENS will attend | ||||||||||||||||||||
54 | 49 | Mr. Randika | (40 & 50) TF Fire Pump House | Fire pump house floor needs to be cleaned. Grass is grown heavily around the pump house. | - Done | Grass removal completed. Fire PH inside cleaning by ERU. | ||||||||||||||||||||
55 | 50 | Mr. Randika | (40 & 50) Warehouse | Five fixed sticker displayed at the front door needs to be replaced with an updated one. | Done | Sticker need to supply by ENS | ||||||||||||||||||||
56 | 51 | Mr. Randika | (40 & 50) Water Treatment Plant | Air blower is not replaced yet. Cobwebs and dust found in chemical dosing room. | Done | Waiting for spares for Air blower | ||||||||||||||||||||
57 | 2024 - October | |||||||||||||||||||||||||
58 | # | Evaluator | Facility | Remark | Required Time Period | Remarks | ||||||||||||||||||||
59 | 52 | Mr. Jihan | (60 & 70) Jetty Fire Pump House | FP 01 is under repair for a long time. Need house keeping | Done | |||||||||||||||||||||
60 | 53 | Mr. Pavithra | (60 & 70) Jetty Fire Pump House | Cobwebs & dust on valve surfaces of fire pipeline inside FPH Poor housekeeping near Foam supply unit Some dismantled parts have been kept near PAGA box inside FPH Name tags are not clear and rusted in FD 01 (Fire control panel) FFMS sign board is not properly aligned Fire diesel water pump 01 breakdown. | Done | |||||||||||||||||||||
61 | 54 | Mr. Pavithra | (60 & 70) Jetty Control Room | Wall damage inside Jetty CCR Displays of the remote release control systems are not clear. | Done | Display need to replace | ||||||||||||||||||||
62 | 55 | Mr. Pavithra | (60 & 70) Jetty Substation Room | Checklist has not been uploaded through the QR code. | Done | |||||||||||||||||||||
63 | 56 | Mr. Jihan | (60 & 70) Jetty Generator Room | Need derusting | Done | |||||||||||||||||||||
64 | 57 | Mr. Pavithra | (60 & 70) Jetty Generator Room | Some dismantled parts have been kept on floor inside the Generator room. | Done | |||||||||||||||||||||
65 | 58 | Mr. Jihan | (60 & 70) Jetty 01 | Loading arm nameboards damaged, Need derustng | ENS Supply | |||||||||||||||||||||
66 | 59 | Mr. Pavithra | (60 & 70) Jetty 01 | Paint removed (MGO 8") & corroded valves in the process pipelines. | Done | |||||||||||||||||||||
67 | 60 | Mr. Jihan | (60 & 70) Jetty 02 | Manifolds Need derusting | Done | |||||||||||||||||||||
68 | 61 | Mr. Pavithra | (60 & 70) Jetty 02 | Insulation cover damage: MFO 20" pipeline Pipeline sticker damages: MFO,MGO Fire pipeline section near fire hose boxes need painting Fresh water pipeline end area has been corroded No valve tags: MGO 12" pipeline Ship-shore earthing connection panel lock has been damaged - Need to fix Ex proof switch inside Ship-shore earthing connection box is loose - Need to fix properly. | Done | |||||||||||||||||||||
69 | 62 | Mr. Jihan | (60 & 70) Jetty 01 Tool Room | Need house keeping | Done | |||||||||||||||||||||
70 | 63 | Mr. Pavithra | (60 & 70) Jetty 01 Tool Room | Each compartment in the storage rack should be labelled separately Housekeeping / 5S inside the Tool room should be improved Some plants grown inside top of the water drain line. | Done | |||||||||||||||||||||
71 | 64 | Mr. Wang | (60 & 70) High Mast Lighting | High master tower nearby SR cable need to be clected. | Done | |||||||||||||||||||||
72 | 65 | Mr. Wang | (30) 30 Tanks | Some equipments are corrosion. | Done | |||||||||||||||||||||
73 | 66 | Mr. Kamal | (20) 20 Pump House | The facility was maintained to an acceptable level | ||||||||||||||||||||||
74 | 67 | Mr. Dimuth | (20) 20 Pump House | Vents were not tagged | Done | |||||||||||||||||||||
75 | 68 | Mr. Poojitha | (20) 20 Pump House | Log sheets at document box is not long filled and document box is not clean. Vent valves name tags not seen. Floor cleanliness is average. | Done | |||||||||||||||||||||
76 | 69 | Mr. Kamal | (20) 20 Gantry | The facility was maintained to an acceptable level | ||||||||||||||||||||||
77 | 70 | Mr. Dimuth | (20) 20 Gantry | Previously identified issues were not addressed | ||||||||||||||||||||||
78 | 71 | Mr. Poojitha | (20) 20 Gantry | No name tags for the strainer and flow meter of the pipeline. Lights on/off switch has no name tag and on/off switch position tag. Corrosion: Gantry ladder, support chains of lights, static discharge pole hose clip. Drain of the L-2101 inlet strainer has no end cap. | Done | |||||||||||||||||||||
79 | 72 | Mr. Kamal | (20) 20 Control Room | The facility was maintained to an acceptable level | ||||||||||||||||||||||
80 | 73 | Mr. Dimuth | (20) 20 Control Room | Wall beeding was broken in few places | ?? | |||||||||||||||||||||
81 | 74 | Mr. Poojitha | (20) 20 Control Room | Damaged UPS is not replaced yet for more than 1 month. 1 wall outlet was found without frame. Tile skirting has fallen down from few places. 1 raised floor tile is missing. Washroom squatting pan is dirty and not cleaned. 1 electrical cabinet has no tag, desktops, keyboards, mice are not tagged. | Waiting for UPS from ENS | |||||||||||||||||||||
82 | 75 | Mr. Kamal | (20) CCR | The facility was maintained to an acceptable level | ||||||||||||||||||||||
83 | 76 | Mr. Poojitha | (20) CCR | Most of the issues identified in September are rectified except the fabrication of a marker holder for the white board. | Done | |||||||||||||||||||||
84 | 77 | Mr. Kamal | (20) 20 Tanks | The facility was maintained to an acceptable level | ||||||||||||||||||||||
85 | 78 | Mr. Dimuth | (20) 20 Tanks | Fire water and foam line support brackets & N2 supply line in T2103 were corroded | Done | |||||||||||||||||||||
86 | 79 | Mr. Poojitha | (20) 20 Tanks | No name plates for some valves. ex: dewatering lines. Flexibles hoses of the product lines are also corroded. Maximum allowable pressure of a PG at T-2102 is not seen. | Done | |||||||||||||||||||||
87 | 80 | Mr. Kamal | (20) 20 Admin Building | The facility was maintained to an acceptable level | ||||||||||||||||||||||
88 | 81 | Mr. Dimuth | (20) 20 Admin Building | Down floor wash room commed issue was not yet resolved | Done | |||||||||||||||||||||
89 | 82 | Mr. Poojitha | (20) 20 Admin Building | The wall of the staircase from ground floor to 1st floor is not clean. Outside staircase wall is damaged due to raining and bad weather. | Done | |||||||||||||||||||||
90 | 83 | Mr. Geeth | (40 & 50) Fresh Water System | One of valves is heavily corroded | Done | |||||||||||||||||||||
91 | 84 | Mr. Geeth | (40 & 50) IOMA Rest Room | AC outdoors has corroded | Done | |||||||||||||||||||||
92 | 85 | Mr. Geeth | ENS Admin Area | The monkey ladder has corroded in 1st floor | Done | |||||||||||||||||||||
93 | 86 | Mr. Danushka | (30) 30 Pump House | Need to improve housekeeping | Done | |||||||||||||||||||||
94 | 87 | Mr. Randika | (40 & 50) TF Fire Pump House | N/A | ||||||||||||||||||||||
95 | 88 | Mr. Randika | (40 & 50) Warehouse | PIC of the 5 fixed signboard displayed at the front needs to be replaced. | Done | |||||||||||||||||||||
96 | 89 | Mr. Randika | (40 & 50) Maintenance Workshop | Keys of the key hanging board needs to be tagged. One of the welding machine is out of order. | Done | |||||||||||||||||||||
97 | 90 | Mr. Randika | (40 & 50) Water Treatment Plant | Air blower is out of order. | Done | |||||||||||||||||||||
98 | 2024 - November | |||||||||||||||||||||||||
99 | # | Evaluator | Facility | Remark | Required Time Period | Remarks | ||||||||||||||||||||
100 | 91 | Mr. Cheng | (60 & 70) Jetty Fire Pump House | Some parts are rusted | ||||||||||||||||||||||