1 | SUBCONTRACTOR BID PROPOSAL | |||||||||||||||||||||||||
2 | ||||||||||||||||||||||||||
3 | Contractor Company Information | LOGO AREA Insert company logo here before printing | ||||||||||||||||||||||||
4 | Company Name | Example: Apex Specialty Contractors LLC | ||||||||||||||||||||||||
5 | Address | 123 Trade Park Drive, Denver, CO 80204 | ||||||||||||||||||||||||
6 | Phone | (303) 555-0188 | estimating@example.com | |||||||||||||||||||||||
7 | Website | www.examplecontractor.com | License # | LIC-123456 | ||||||||||||||||||||||
8 | ||||||||||||||||||||||||||
9 | Proposal Control | |||||||||||||||||||||||||
10 | Proposal # | BP-2026-014 | Revision # | 0 | Proposal Date | 7/26/2026 | Validity Days | 30 | Status | Draft | ||||||||||||||||
11 | Estimator | Jordan Lee | Valid Through | 8/25/2026 | Work Schedule | Standard Hours | Bond Required | Yes | Tax Rate | 8.25% | ||||||||||||||||
12 | ||||||||||||||||||||||||||
13 | Customer / Project Information | |||||||||||||||||||||||||
14 | Customer / GC | Example Builders Group | Bid Contact | Maria Sanchez | Contact Phone | (303) 555-0123 | Contact Email | msanchez@examplegc.com | ||||||||||||||||||
15 | Project Name | North Ridge Office Renovation | Project # | NR-2607 | Project Address | 4200 Market Street, Denver, CO | Bid Package | 09 29 00 Gypsum Board | ||||||||||||||||||
16 | Requested Start | 9/8/2026 | Anticipated Completion | 46312 | Retainage Assumption | 10% | Payment Terms | Net 30 after approved invoice | ||||||||||||||||||
17 | ||||||||||||||||||||||||||
18 | Bid Documents Reviewed | |||||||||||||||||||||||||
19 | Type | Reference / Sheet / Section | Revision Date | Notes | Type | Reference / Sheet / Section | Revision Date | Notes | ||||||||||||||||||
20 | Drawing | A2.10, A2.11, A5.01 | 7/12/2026 | Interior partitions and details | Specification | 09 29 00 Gypsum Board | 46215 | Level 4 finish typical | ||||||||||||||||||
21 | Addendum | Addendum 02 | 7/20/2026 | Door schedule revisions acknowledged | Scope Sheet | Bid Package 09A | 46218 | Trade responsibilities reviewed | ||||||||||||||||||
22 | RFI | RFI-014 | 7/22/2026 | Shaft wall clarification included | Site Walk | Pre-bid walk | 46221 | Access and staging observed | ||||||||||||||||||
23 | ||||||||||||||||||||||||||
24 | Scope of Work Narrative | |||||||||||||||||||||||||
25 | Provide labor, material, equipment, supervision, and mobilization for interior metal framing, gypsum board, shaft wall assemblies, finish levels, and related work per the documents listed above. Example data is included for a realistic specialty-contractor bid and should be removed or replaced before use. | |||||||||||||||||||||||||
26 | ||||||||||||||||||||||||||
27 | ||||||||||||||||||||||||||
28 | ||||||||||||||||||||||||||
29 | Inclusions | |||||||||||||||||||||||||
30 | Metal stud framing; gypsum board installation; shaft wall assemblies; corner bead and accessories; Level 4 finish in office areas; jobsite cleanup for own work; standard-hours labor; one mobilization; coordination with adjacent trades. | |||||||||||||||||||||||||
31 | ||||||||||||||||||||||||||
32 | ||||||||||||||||||||||||||
33 | ||||||||||||||||||||||||||
34 | Exclusions | |||||||||||||||||||||||||
35 | Demolition; cutting and patching outside listed scope; hoisting; scaffolding by others unless noted; temporary utilities; permits; engineering; testing; premium-time work; storage charges; work outside listed drawings; painting; final building cleanup; work by others. | |||||||||||||||||||||||||
36 | ||||||||||||||||||||||||||
37 | ||||||||||||||||||||||||||
38 | ||||||||||||||||||||||||||
39 | Clarifications and Assumptions | |||||||||||||||||||||||||
40 | Pricing assumes clear site access, normal sequencing, available laydown area, standard hours, released-for-construction documents, and work performed in one continuous phase unless noted otherwise. Verify prevailing-wage, certified-payroll, bonding, insurance, tax, and licensing requirements when applicable. | |||||||||||||||||||||||||
41 | ||||||||||||||||||||||||||
42 | ||||||||||||||||||||||||||
43 | ||||||||||||||||||||||||||
44 | Schedule and Phasing Assumptions | |||||||||||||||||||||||||
45 | Work is priced for standard daytime hours with phased turnover by floor as coordinated with the construction manager. Additional remobilization, acceleration, resequencing, weather delays, or standby time may require a written change order. | |||||||||||||||||||||||||
46 | ||||||||||||||||||||||||||
47 | ||||||||||||||||||||||||||
48 | ||||||||||||||||||||||||||
49 | Proposal Price Summary | |||||||||||||||||||||||||
50 | Base Bid Subtotal | $120,350.00 | Selected Alternates | $1,340.00 | Allowance Total | $5,000.00 | Unit-Price Items (Not in Base Total) | $1,525.00 | Taxable Subtotal | $38,860.00 | ||||||||||||||||
51 | Tax | $3,205.95 | Bond Cost | $1,266.90 | Other Adjustments | $0.00 | Total Proposed Price | $131,162.85 | Written Total Amount | |||||||||||||||||
52 | Reconciliation Check | OK | Blank Written Total? | ENTER WRITTEN TOTAL | Proposal Expired? | CURRENT | Bond Rate | $0.01 | Bondable Subtotal | $126,690.00 | ||||||||||||||||
53 | ||||||||||||||||||||||||||
54 | ||||||||||||||||||||||||||
55 | Proposal Validity | |||||||||||||||||||||||||
56 | This proposal is valid through the date shown above. After that date, pricing, labor availability, material pricing, and schedule commitments are subject to review and written revision. | |||||||||||||||||||||||||
57 | ||||||||||||||||||||||||||
58 | ||||||||||||||||||||||||||
59 | Change-Order Requirements | |||||||||||||||||||||||||
60 | Changes to scope, schedule, access, phasing, premium time, quantities, or conditions not included in this proposal must be approved in writing before additional work proceeds. | |||||||||||||||||||||||||
61 | ||||||||||||||||||||||||||
62 | ||||||||||||||||||||||||||
63 | Signature and Acceptance | |||||||||||||||||||||||||
64 | Prepared By Name | Jordan Lee | Title | Estimator | Signature | Date | 7/26/2026 | |||||||||||||||||||
65 | Accepted By Name | Company | Title | Signature | Date | |||||||||||||||||||||
66 | ||||||||||||||||||||||||||
67 | ||||||||||||||||||||||||||
68 | INTERNAL NOTES — NOT FOR CUSTOMER-FACING PRINTING | |||||||||||||||||||||||||
69 | Internal estimate notes, margin comments, risk notes, vendor quotes, and calculation support can be entered here. This area is intentionally outside the recommended customer-facing print area. | |||||||||||||||||||||||||
70 | ||||||||||||||||||||||||||
71 | ||||||||||||||||||||||||||
72 | ||||||||||||||||||||||||||
73 | ||||||||||||||||||||||||||
74 | Free Construction Resource provided by SimplySub | https://simplysub.com | |||||||||||||||||||||||||
75 | ||||||||||||||||||||||||||
76 | ||||||||||||||||||||||||||
77 | ||||||||||||||||||||||||||
78 | ||||||||||||||||||||||||||
79 | ||||||||||||||||||||||||||
80 | ||||||||||||||||||||||||||
81 | ||||||||||||||||||||||||||
82 | ||||||||||||||||||||||||||
83 | ||||||||||||||||||||||||||
84 | ||||||||||||||||||||||||||
85 | ||||||||||||||||||||||||||
86 | ||||||||||||||||||||||||||
87 | ||||||||||||||||||||||||||
88 | ||||||||||||||||||||||||||
89 | ||||||||||||||||||||||||||
90 | ||||||||||||||||||||||||||
91 | ||||||||||||||||||||||||||
92 | ||||||||||||||||||||||||||
93 | ||||||||||||||||||||||||||
94 | ||||||||||||||||||||||||||
95 | ||||||||||||||||||||||||||
96 | ||||||||||||||||||||||||||
97 | ||||||||||||||||||||||||||
98 | ||||||||||||||||||||||||||
99 | ||||||||||||||||||||||||||
100 | ||||||||||||||||||||||||||