Risk Assessment/Management Form
2
Ref:
3
Section / Dept: civil Name of Contractor:- Activity: Risk Assessment for Manual ExcavationLocation/Area:-
4
Sl No.Basic Job StepsPotential HazardConsequenceCurrent control measureRisk ratingProbabilityInitial RiskAdditional control measureRisk ratingProbabilityResidual risk
5
PEARPEAR
6
1Manual ExcavationFall in excavated pitSerious Injury/FatalityBarricading of the area 200124
7
Allow only authorised person inside the barricading
8
Damaged to underground pipelineInjury and loss of productionExcavation only done through permit to work012124
10
Underground cablesSerious Injury/FatalityFollw the permit to work system101122
13
Collaps of building and adjoining structureGet Injury/FatalityExcavation shall be done with proper sloping and it should be properly shored102124
37
38
Additional Control Measure
39
1Slip of Man/ Materials during ascending and descending in the excavated pit ------- Proper access to be provided for ascending and descending
40
2Material or any equipement should not be stacked at the edge of excavated pit
41
3Excavated materials should not be stacked at the edge of excavated pit
42
45
Prepared ByApproved ByReviwed By
46
ContractorContractor
47
DateDateDate
48
49
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130