ABCDEFGHIJKLMNOPQRSTUVWXYZ
1
2
3
Ref. No.: GPL F HS 02Date: 10/20/2020
4
Rev.No.: 00Page no.01 of 01GPL/HIRA/30
5
Hazard Identification & Risk Assessment Format
6
Activity: Aluminium Formwork System.
7
Sr. No.ActivityHazardIssues (Internal/External)Risk ( Probable Outcome) Existing Control Legal Yes/NoRisk Assessment existing Control MeasuresSignificant (S) /
Non-Significant (NS)
Additional Control MeasureRisk Assessment additional Control MeasuresRef. Of WI/ SOP :- Opportunities & ActionRemark
8
Probability(P)Severity(S)Risk Level (H/M/L) : Probability(P)Severity(S)Risk Level (H/M/L) :
9
1Legal Compliance.Failure to comply the legal requirementsInternal Legal Beach.Lifting equipment and all lifting appliances must be inspected by competent person and certificates to be recorded. YP3S2MSPrior to use Physical & Documentary verification to be done and recorded. P1S2LNil
10
Unauthorized Operator and signal man for tower crane Internal Hit injury / Fall of material 1. Only authorized operator should be deploy for any lofting equipment operation. 2. Operator must have valid license. 3. During lifting load marching flag man must be ensure along with Equipment. 4. Tag line must be ensure for every lifting load.YP2S3MSP1S3MNil
11
2Manual handling of Mivan components. sharp edged components.Internal Cut Injury1. Sufficient number of skilled workmen allotted to the job.
2. Safety helmet, safety shoes, Cut resistance hand gloves and shoulder pad to be ensure for material handling. 3. Access and egress must be kept clear for safe and free movement.
NP3S3 HNSConduct Job specific and Ergonomic hazard safety training.


P1S3MNil
12
3Shorting of Mivan Component.Sharp Edge.Internal Cut Injury2. Safety helmet, safety shoes, Cut resistance hand gloves and shoulder pad to be ensure for material handling. 3. Access and egress must be kept clear for safe and free movement. 3. All shorted material kept and stacked in safe manner .
NP3S2MNSJob specific Training must be conduct with all engaged worker.P1S2LNil
13
4Poor Housekeeping.Slip , Trip and Fire .Internal Physical injury and fire Hazard,1. Mivan Plat and any other component must be kept in right way. 2. access and egress must be kept clear from unwanted obstruction. 3. After shorting flammable material like:- wooden pallet, plastic and plastic strap must kept in designated place. 4. Flammable material must be disposed on daily basis from work location.NP3S2MNSTraining to be conduct with engaged team and PTW system must be followed.P1S2LNil
14
5Shifting of Mivan component to Work area Manually.Slippery and obstructed access.Internal Trips, Fall & Hit Injury.1. Access to be kept clear from any obstruction. 3. all material to be stacked in right manner. 3. Cut resistance Hand Gloves , Safety Helmet , Safety Shoes and and shoulder pad must be ensure during manual material transportation.NP2S3MNSBefore start the activity area should be survey and TBT conduct with engaged worker.P1S3MNil
15
6Installation of internal Vertical member/Plate.Fall of vertical panel.Internal Physical injury and property damage.1. All vertical panels are firmly secured as per Alu formwork system to prevent the fall of vertical panel.NP3S3HNSAll boards has to be secured with the additional tag line/ support lineP1S3MNil
16
7Installation of Horizontal Member.Fall of Material.Internal Physical injury and property damage.1. Work sequence must followed during horizontal member installation. 2. Aluminium formwork guideline must be followed on every step of work. 3. Standard Table to be used for Horizontal panel installation.NP3S2MNSTraining must be conduct with engaged staff and Worker for work sequence and procedure of Aluminium Formwork system.P1S2LNil
17
8Installation of external Vertical Member/ Plate.Fall of Material and Person.Internal Multiple injury.1. Safe Working platform must be ensure around the building periphery.2.Samall bucket must be used for Stub pin and wedges.NP3S3HNSPTW system must be followed for external work.P1S3MNil
18
9Handling of reinforcement bars. Handling of sharp edged Rebar's.Internal Cut Injury1. Sufficient number of skilled workmen allotted to the job.
2. Safety helmet, safety shoes, Cut resistance hand gloves and shoulder pad to be ensure for material loading and unloading.
3. Barricade the work area.
NP3S3 HNS1. Conduct Job specific and Ergonomic hazard safety training.
2. Daily TBT to be conducted with concern team.

P1S3MNil
19
Improper stacking. &
Nip/pinch point
Internal Trip, Fall & physical Injury 1. Rebar's shall be stacked size wise with signage posted.
2. Packing shall be given for easy handling.
3. Rack to be used for material stacking.
NP2S3MNS1. Material management to be followed at site. 2. Strict /closed supervision monitored for material management.P1S3MNil
20
Presence of Poisonous Snake /scorpion & other insects etc..Internal Bite /Fatal1. Insecticide treatment to be carried out on regular basis specially steel yard, material stacking yard and store area. 2. Site should be tie-up with pest control agency and snake catcher. And display contact number on site.
3. Remove grass/bushes around site work location.
NP2S4HNSTraining conduct with labour and staff for awareness about poisonous snake and scorpion.P1S4MNil
21
10Bar Bending & Bar cutting operation by Machine. Unauthorized operation.Internal Injury to operator & Work crew1. Only authorized person to operate the cutting M/c.
2. Power shall be disconnected when not in use.
3. Conduct training on safe operation.
YP4S3HSAuthorise operator's photographs to be display near the machine.P1S3MNil
22
Unguarded rotary & cutting wedge.Internal Entanglement & Amputation1. All rotating parts & cutting wedge provided with suitable guards to avoid entanglement.
2. Workmen with loose attire not to be involved.
3. Display inspection tag on machine.
YP2S3MSPeriodic inspection of machine to be done by P & M dept. and record to be maintained.P1S3MNil
23
Unsafe Electrical installation.Internal Electrocution.1. Electrical connection to be route through 30mA ELCB.
2. Cables of sufficient capacity with double insulation & Industrial plug tops & sockets to be used.
3. Provision of double Body earthing to be ensure. 4. As per standard earth pit to be made and resistance inspection to done and display near the earth pit. 5. only IP -55 electrical DB to be used at site.

YP3S3HSElectrical inspection to be carried out on regular basis and record to be maintained.
Display contact detail of Electrician. Emergency switch to be placed.
P1S3MNil
24
Sharp edged materials after cutting operation.Internal Cut injury.1. Daily housekeeping practice is adopted.
2. Separate scrap yard is demarked to dump cut & scrap bars
YP2S2MNSDisposal of RO for waste to be followed on regular basis. (re use the same)P1S2LNil
25
Improper stacking of fabricated rebar.Internal Trips, Fall & Hit Injury.1. Reinforcements shall be stacked diameter wise with identity.
2. Separators shall be used to stack one above others.
NP2S2MNSMaterial stacking yard to be identified for fabricated material.P1S2LNil
26
Excessive Noise resulting.Internal Hearing impairment
1. Preventive maintenance schedule and maintenance to be followed and recorded as per mannual.
2. Ear plug to be used if required.
YP2S2MSPreventive maintenance schedule and maintenance to be recorded.P1S2LNil
27
11Concreting by Concrete Mixer/ Concrete PumpUnauthorized OperationInternal Injury to the operator & work crewOnly authorized operator operates the mixer machine. YP3S3HSDaily monitoring to be carried out for safe operation. P1S3MNil
28
Unguarded Rotary partsInternal Entanglement & Amputation1. All the rotating parts (of Mixer machine) are covered / guarded.
2. Workmen with loose attire not engaged.
YP1S3MS1. Regular inspection to be done and recorded. 2. Vehicle inspection to be done through Vehicle inspection checklist.P1S3MNil
29
Loading Hopper Movement Internal Hit InjuryBarricading around the concrete mixer to be available.NP1S3MNSPreinspection of work location to be done.P1S3MNil
30
Slippery Surface / Projecting MaterialsInternal Slips & Trips / Hit InjuryLoading crews are entrusted to clean the approach every day.

YP3S2MSSOP to be prepared and monitored .P1S2LNil
31
Contact with chemicalsInternal
Alkali burn & Eye Injury
1. Use of Rubber Hand gloves, gumboots & Goggles / Face shield during concreting work.
2. Washing of hands before eating & drinking and at the end of work. 3. Training on first aid for MSDS to be given to concern in charge.
NP2S2MNSTraining to be conduct with all engaged worker and staff in respect of MSDS.P1S2LNil
32
Flying particles and splashes of aggregate material, slurry water, and concrete.Internal Hit to body Part.1)Ensure PPE's like Safety goggles, gloves ,Nose masks Safety helmets and gumboots. 2. Don't stay or stand front of concrete discharge point. 3. Close supervision to be followed.YP3S3HSHazard and their control measures to be brief through TBT. P1S3MNil
33
Haphazard Routing of vibrator cable.Internal
Slips & Trips
Vibrator cable routed away from the access & approach.YP3S2MSCable Management to be followed at site.P1S2LNil
34
12 External and internal working platform.Unprotected Edge.Internal Fall of person and Material.1. Mid rail and Top rail must be ensure on cantilever working platform. 2. Railing pipe must be tied with swivel clamp.YP4S3HSBefore use of external and internal working platform must be jointly inspect and recoded. 2. PTW system must be follow before use of cantilever working platform. 3. Strict supervision must be followed for cantilever working platform. as per all the material, how for that safety net are provided.P2S3MNil
35
Unprotected Dead end.Internal Fall of person and Material.1. Every dead end must be protected by Double railing. 2. Railing pipe must be tied with swivel clamp.NP2S3MNSP1S3MNil
36
Unsecure and Suspended walkway plank.Internal Fall of person and Material.1. All walkway jali must be tied with bending wire on six place. 2. More than 50mm gap should not be create on working platform. 3. Any walkway jali not extend from bracket more than 100 mm. 4. Any loose material don't kept on working platform. 5. Double walkway jali must be used on external working platform. 6. Only DSR Tie rod used for working platform bracket . 7. Two level working platform must be ensure around the building periphery. 8. Continuity must be maintained in external working platform.NP4S3HNSP1S3MNil
37
Unprotected corner portion.Internal Fall of person and Material.1. Every corner portion must have corner bracket/ Corner Bracing for bottom support of suspended walkway jali.YP4S4HSP1S4MNil
38
Loose Material on working platform.Internal Fall of person and Material.1. Any Loose material don’t kept and left on working platform.YP3S3HSP1S3MNil
39
Gap between internal working platform.Internal Fall of person and Material.1. Working platform must be 100% covered in any shaft. 2. Flat bracket should be used in shaft for working platform. 3.Two level working platform must be ensure in every shaft.YP3S2MSP1S2MNil
40
Overloading on External and internal working platform.Internal Fall of person and Material.1.Don't overload the working platform. 2. More than tree plat don't kept on working platform in one location.YP3S3HSDaily inspection through checklist must be done and recorded.P1S3MNil
41
13shuttering & Deshuttering of Mivan Panel and T- Plate.Substandard /unsafe procedure adopting.Internal Hit injury and property damage.1. Refer to Aluminium Formwork system for Deshutter the panel. 2. Directly don't through on ground and panel. 3. After deshutter all panel to be stacked in right manner. 4. Access and egress to be kept clear at all time. NP3S2MNSAluminium Formwork system procedure training to be conduct with engaged Team. 2. Permit to work system to be followed for the same.P1S2LNil
42
Unsafe material stacking on cantilever working platform.Internal Slip, Trip and fall of material.1. Any loose and small object don't kept on working platform. 2. More than three full length panel don't kept on working platform in one location. 3. Any T- plat don't store and kept on external working platform.NP4S3HNSTraining to be conduct with concern team and daily inspection to be done and record to be maintained.P1S3MNil
43
use of Substandard Table for removing / fixing the T- plat and Solders.Internal Slip, Trip and fall of material.1. Only approved and standard table use for T -plat and solders removing. 2. personal fall protection system should be ensure for every worker which will engage in T- plat & solder removing work.NP3S2MNSStrict supervision and PTW system must be followed for the respective activity.P1S2LNil
44
14Mivan Plat Transportation for Next Floor.Heavy plate passing through duct and opening.Internal Fall of person and Material.1. As per Mivan formwork system heavy and full length plate to shift through nearest staircase.NP3S2MNSprior to start the work Make a approved plan for Mivan plate transportation to next level.P1S2LNil
45
Plate passing out side the building periphery.Internal Fall of material.1. Small plate to be passed through identified and designated openings. 2. Don't shift / pass any mivan plate out side of building.NP4S4HNSP1S4MNil
46
Mivan Plate passed in void area.Internal Fall of person & Material.1. Opening must be fully closed with welded steel mesh where people standing for plate passing. 2. Area to be kept clear from any obstruction.NP3S2MNSP1S2LNil
47
15Working at Height on Scaffold.Unsafe working platform.Internal Fall of person and fall of material.1. Ensure surface to be levelled and compacted for scaffold erection. 2. Base jack must be used for every vertical member. 3. 1 : 3 ratio to be maintained for all scaffold. 4. Scaffold to be in plumb. 5. Ensure Mid rail and top rail on every scaffold. 6. Working level should be fully covered with walk way jali. 7. Before use of scaffold inspection through checklist to be carried out and recorded. 8. Scaffold Tag to be displayed on scaffold. 9. PTW system to be followed for height work. 10. Double lanyard Full body Safety Harness to be ensure for height work.YP4S3HS Before use of scaffold joint inspection through checklist with Execution and safety team to be carried out and record to be maintained.

Scheme/plan of work platform with all detail needs to be get approved from concern prior to use on site.

Deploy dedicated scaffold erection & inspection team on site.
P1S3MNil
48
Unsupported Scaffold.Internal Tilt and topple 1. 1:4 ratio to be maintained during and after erection of scaffold. 2. As required support to be given to scaffold. 3. If required diagonal and cross bracing to be ensure to scaffold.YP3S2MSInspection through scaffold checklist to be carried out and record to be maintained.P1S2LNil
49
Overloaded Scaffold.Internal Tilt ,Topple and collapse of scaffold.Scaffold to be made as per work required. Light ,Medium and Heavy duty.YP3S2MSLoad calculation to be done before use of scaffold.P1S2LNil
50
Absence of access/Ladder for ascending and descending on scaffold. Internal Slip ,trip and fall.1. Ladder must be ensure for every scaffold. 2. one meter ladder to be increase from landing point. 3.Ladder to be secured with scaffold. 4. 1:4 ratio to be maintained after ladder landing.YP3S2MSInspection through scaffold checklist to be carried out and record to be maintained.P1S2LNil
51
16Applying Shuttering oil on mivan Plate.FireInternal Fire Hazard1. Shutting oil to be kept in closed drum. 2. Don’t used gamelan & open buckets for applying the shutting on Mivan panel. 3. portable fire extinguisher provide to working area. 4. MSDS to brief with all engage workers & staff. 5. Flammable material to be segregate on working floor and it should be demarked. 7. Smoking is strictly prohibited. NP3S3HNSUnwanted shutting oil don’t store on work site after completion of work rest oil to be store in designated place. Uses of adequate PPEP1S3MNil
52
17Electrical Installation.Unsafe Electrical installation.Internal Electrocution.1. Electrical connection to be route through 30mA ELCB.
2. Cables of sufficient capacity with double insulation & Industrial plug tops & sockets to be used.
3. Provision of double Body earthing to be ensure. 4. As per standard earth pit to be made and resistance inspection to done and display near the earth pit. 5. only IP -55 electrical DB to be used at site.

YP3S3HSElectrical inspection to be carried out on regular basis and record to be maintained.
Display contact detail of Electrician. Follow WI of GPL.
P1S3MNil
53
18Night work Lack of Illumination.Internal Fall ,Trip & Slip.1. As required Sufficient illumination to be ensure at working area. 2. Emergency Vehicle should be available full time on site during the work. 3. concern staff should be full time available at work site.
4. Follow work permit system.
YP3S2MSIllumination level to be checked through Lux Meter as per legal guide line.P1S2LNil
54
19During Rainy season.Slip ,Trip and fall during rainy season.Internal Slip ,Trip and fall1. Rain protection shed should be made working location.
2. Rain coat to be provide to all deployed worker and staff.
NP2S2MNSincase of heavy rain work to be stopped.
Access & Egress to be kept clear at all time.
P1S2LNil
55
20 HousekeepingPoor Housekeeping Internal Slip, trip & fall
Physical Injury.
1) After completion of concreting and deshuttering work area to be cleaned and all materials to be stacked properly. 2. Construction debris to be removed on daily basis from building.YP3S2MSHousekeeping checklist to be followed for housekeeping inspection.P1S2LNil
56
21Provision of fall protection/prevention measuresUnprotected edge , open cut out & utility shaft and absence of netting management system.Internal Fall of person and fall of material.1.All open edge must be barricaded with toe guard provision. 2.All duct ,opening and utility shaft must be horizontal protected with MS steel mesh. 3.Horizontal safety catch net must be ensure below the working level. 4. Horizontal safety net to be installed on ground level for pedestrian movement. 5. Vertical fall protection to be provide to building. 6. One point entry with canopy system (Fall protected ) to be made in every building.YP3S3HSPrior planning,material procurement and close communication Approved scheme design to be follow.P1S3MNil
57
22Shuttering & Deshuttering of Mivan Panel and T- Plate.Flying nails,Bodily injury caused due to flying nailsInternal Eye injury,eye damage,eye blindnesswhile hammering safety goggles shall be used.Hammering to be done on the edge of nails instead of head YP3S3HSTraining shall be given to all workmen ,engineers or supervisors on nailing & denailing safety.P1S3MNil
58
23External bracket removal workfall of person,fall of materialInternal Physical injury,bodily injury,fatalSame size wing nut & tie rod shall be used.Color coding shall be used to identify size of tie rod & wing nuts.lifeline rope shall be provided.sharp edges & protruding dwell be protected or cautioned.YP3S3HSTraining shall be given to all workmen ,engineers or supervisors.Continuous supervision to be given for height work activities P1S3MNil
59
RISK Calculation / Evaluatio
60
Probability (P)P/SS1S2S3S4
61
P1: ImprobableP1LLMM
62
P2 : RemoteP2LMMH
63
P3 : PossibleP3MMHH
64
P4 : ProbableP4MHHH
65
66
Severity (s)A : Hazards must be avoided (or the level of risk reduced significantly and reliable by controls)
67
S1 : NegligibleB : Hazards should be avoided (or the level of risk reduced significantly and reliable by controls)
68
S2 : MinorC : Risk to be controlled as far as reasonably practicable
69
S3 : SeverD : Risk is controlled as far as reasonably practicable .
70
S4 : Extreme -- : Acceptable risk
71
LEGAL : If activity come under legal implecation (significant) than additional control measures is to be taken and has to be reviewed periodically.
72
S : Significant
73
NS : Non - Significant.
74
75
76
77
78
PREPARED BY KEC PROJECT MANAGER PMC SAFETY MANAGER
79
80
PMC PROJECT MANAGER GPL SAFETY MANAGER GPL PROJECT MANAGER
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100