| A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | AA | AB | AC | AD | AE | AF | AG | AH | AI | AJ | AK | AL | AM | AN | AO | AP | AQ | AR | AS | AT | AU | AV | AW | AX | AY | AZ | BA | BB | BC | BD | BE | BF | BG | BH | BI | BJ | BK | BL | BM | BN | BO | BP | BQ | BR | BS | BT | BU | BV | BW | BX | BY | BZ | CA | CB | CC | CD | CE | CF | CG | CH | CI | CJ | CK | CL | CM | CN | CO | CP | CQ | CR | CS | CT | CU | CV | ||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | @dropdown | PROJECT MANAGEMENT TASK | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2 | PROJECT TITLE | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
3 | Plan and Manage the Launch of Balancee's New Mobile App | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4 | PROJECT MANAGER | COMPANY NAME | DATE | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
5 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6 | Ukpebor Stella | BALANCEE | 01/07/23 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
7 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
8 | PHASE ONE | PHASE TWO | PHASE THREE | PHASE FOUR | PHASE FIVE | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
9 | TASK | PROJECT | TASK | START | DUE | DURATION | Resource | Project | PCT OF TASK | Week 1 (07/08-13/08) | WEEK 2 (14/08-20/08) | WEEK 3 (21/08-27/08) | WEEK 4 (28/08-3/09) | WEEK 5 (4/09-/10/09) | WEEK 6 (11/09-17/09) | WEEK 6 (18/09-24/09) | WEEK 8 (25/09-01/10) | WEEK 9 (02/10-08/10) | WEEK 10(09/10-15/10) | WEEK 11 (16/10-22/10) | WEEK 12 (23/10-28/10) | WEEK 13 (30/10-05/11) | WEEK 14 (06/11-12 /11) | WEEK 15 (13/11-19/11) | WEEK 12 (20/11-26/11) | WEEK 16 (27/11-03/12) | WEEK 17 (04 /12-10/12) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10 | ID | PHASE | DATE | DATE | IN DAYS | Alottment | Dependecies | COMPLETE | M | T | W | R | F | M | T | W | R | F | M | T | W | R | F | M | T | W | R | F | M | T | W | R | F | M | T | W | R | F | M | T | W | R | F | M | T | W | R | F | M | T | W | R | F | M | T | W | R | F | M | T | W | R | F | M | T | W | R | F | M | T | W | R | F | M | T | W | R | F | M | T | W | R | F | M | T | W | R | F | |||||||||||||
11 | 1 | Project Initiation | Project Initiation and Planning | 28-07-2023 | 07-08-2023 | 4 | 3 Project Manager 2 Product Manager | 100% | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12 | 1.1 | Team Building | 08-09-2023 | 12-08-2023 | 4 | 3 Project Manager , 2 Product Manager | None | 100% | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13 | 1.2 | Market Reseach | 13-08-2023 | 15-09-2023 | 33 | 50 Market Researchers | None | 100% | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
14 | 1.3 | Market Reseach Analysis and Review | 16-09-2023 | 31-09-2023 | 15 | 2 Data Analyst 2 Developers | Analysis Feedack | 100% | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
15 | 2 | App Development | Finalise app features | 01-10-2021 | 05-10-2023 | 5 | 2 developers, 1 product manager | Requirements finalized | 100% | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
16 | 2.1 | Begin coding | 06-10-2022 | 25-10-2023 | 20 | 3 Developers | Feature finalization | 100% | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
17 | 2.2 | Mid-development testing | 26-10-2023 | 04-11-2023 | 10 | 1 QA engineer, 2 developers | Design Complete | 100% | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
18 | 2.3 | Final bug testing | 05-11-2023 | 09-11-2023 | 5 | 2 QA engineers | Coding completed | 100% | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
19 | 3 | App Design | Create wireframes | 10-11-2023 | 15-11-2023 | 5 | 1 designer | None | 100% | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
20 | 3.1 | Design app screens and UI elements | 16-11-2023 | 26-11-2023 | 10 | 2 designers | Wireframes completed | 100% | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
21 | 3.2 | UX testing with users | 27-11-2023 | 03-12-2023 | 7 | 1 designer,1 QA engineer, 5 testers | Screens designed | 100% | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
22 | 3.2.1 | Finalize UI/UX design | 04-12-2023 | 09-12-2023 | 5 | 2 designers | UX testing completed | 100% | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
23 | 4 | Pre-launch Marketing | Create marketing strategy | 10-12-2023 | 15-12-2023 | 5 | 1 marketing manager, 1 strategist | Requirements understood | 100% | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
24 | 4.1 | Create teaser campaigns (social media) | 16-12-2023 | 25-12-2023 | 10 | 1 designer, 1 social media manager | Strategy finalized | 100% | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
25 | 4.2 | Develop promotional content (videos/posts) | 26-12-2023 | 05-01-2024 | 10 | 1 video editor, 1 copywriter | Teasers approved | 100% | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
26 | 4.3 | Launch pre-launch marketing campaign | 02-01-2024 | 06-01-2024 | 5 | 1 social media manager, 1 PR specialist | Teasers created | 100% | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
27 | 5.0 | App Testing | Internal alpha testing | 11-01-2023 | 16-01-2024 | 5 | 2 QA engineers, 2 developers | App coding completed | 100% | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
28 | 5.1 | Beta testing with external users | 17-01-2024 | 27-01-2024 | 10 | 2 QA engineers, 50 external beta testers | Alpha testing completed | 100% | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
29 | 5.2 | Collect user feedback | 28-01-2024 | 31-01-2024 | 3 | 1 QA engineer, 1 support team member | Beta test complete | 100% | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
30 | 6.0 | Launch Preparation | Submit app for app store approval | 01-02-2024 | 14-02-2024 | 14 | 1 app store submission expert | Beta testing completed | 100% | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
31 | 6.1 | Ensure all marketing materials are ready | 15-02-2024 | 17-02-2024 | 2 | 1 marketing manager | Campaign completed | 100% | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
32 | 6.2 | Final customer support training | 18-02-2024 | 21-02-2024 | 3 | 1 trainer, 3 customer support agents | Completed training | 100% | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
33 | 7.0 | Official Launch | Launch app on app stores | 22-03-2024 | 23-02-2024 | 1 | 1 app submission expert, 1 developer | Store approval | 100% | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
34 | 7.1 | Kickoff launch campaign | 24-02-2024 | 25-02-2024 | 1 | 1 marketing manager, 1 social media mgr | App live | 100% | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
35 | 7.2 | Monitor feedback and app performance | 26-02-2024 | Ongoing | Ongoing | 1 QA engineer, 1 customer support agent | Post-launch | 100% | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
36 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
37 | PROJECT RISK ASSESSMENT | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
38 | S/n | Risk | Impact | Likelihood | Mitigative Measures | Responsible Team | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
39 | 1 | App bugs during final testing | High: Could delay the launch or lead to a poor user experience | Medium | - Conduct regular testing during development phases - Ensure mid-development and final testing are comprehensive - Allocate additional resources for QA before the launch | Development Team, QA Team | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
40 | 2 | Delays in app development | High: Could push back the entire timeline | Medium | - Set clear milestones and conduct daily stand-ups to track progress - Build buffer time into the development phase - Use Agile methodology to adapt to unforeseen issues quickly | Project Manager, Development Team | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
41 | 3 | App store approval delays | Medium: Could delay the official launch | High | - Submit the app for approval well before the launch date (2 weeks prior) - Research app store approval guidelines to avoid rejections | Development Team | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
42 | 4 | Insufficient marketing engagement | Medium: Could result in a weak launch and low user downloads | Medium | - Launch a robust pre-launch campaign to build anticipation - Engage with influencers and online communities - Monitor engagement and adjust campaign based on metrics | Marketing Team | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
43 | 5 | Poor customer support readiness | Medium: Could lead to user frustration and negative feedback | Low | - Train customer support team ahead of time with detailed FAQs - Perform mock training sessions and prepare for possible inquiries | Customer Support Team | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
44 | 6 | Security vulnerabilities | High: Could compromise user data and damage brand reputation | Low | - Conduct security assessments during development - Ensure encryption and secure coding practices - Perform a penetration test before launch | Development Team, Security Specialist | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
45 | 7 | Low post-launch user engagement | Medium: May result in low app retention and poor reviews | Medium | - Roll out engaging post-launch content (e.g., tutorials, new features) - Track user behavior analytics and send personalized notifications to re-engage users | Marketing Team, Product Team | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
46 | 8 | Server overload or downtime at launch | High: Could cause app crashes and negative user experience | Low | - Use scalable cloud infrastructure to handle peak traffic - Stress-test servers before launch | Development Team, I | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
47 | LAUNCH STRATEGY | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
48 | S/n | Action | Description Perform final quality checks to ensure the app is bug-free. Conduct a meeting to ensure all teams are aligned and ready for launch. Confirm app store approval status, ensure all updates are applied. Kick off the official launch campaign, including social media, email marketing. Release the app on the Apple and Google Play stores. Use analytics to track downloads, crashes, and performance metrics post-launch. Promote the app on social media platforms and respond to user feedback. Ensure customer support team is prepared to handle user inquiries or issues. Collect user reviews, feedback, and address any critical issues immediately. Provide in-app user tutorials and educational resources to guide new users. Roll out app updates for any bugs discovered after the launch. | Responsible Team | Start Date | End Date | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
49 | 1 | Final Testing and Bug Fixes | Perform final quality checks to ensure the app is bug-free. | Development & QA Teams | Dec 1, 2023 | Dec 5, 2023 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
50 | 2 | Pre-launch Meeting | Conduct a meeting to ensure all teams are aligned and ready for launch. | Project Manager & All Teams | Dec 6, 2023 | Dec 6, 2023 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
51 | 3 | App Store Submission Follow-up | Confirm app store approval status, ensure all updates are applied. | Marketing Team | Dec 7, 2023 | Dec 9, 2023 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
52 | Marketing Launch Campaign | Kick off the official launch campaign, including social media, email marketing. | Marketing Team | Dec 7, 2023 | Dec 12, 2023 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
53 | 4 | App Store Launch | Release the app on the Apple and Google Play stores. | Development Team | Dec 12, 2023 | Dec 12, 2023 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
54 | 5 | Monitor Initial Downloads & Performance | Use analytics to track downloads, crashes, and performance metrics post-launch. | Development & QA Teams | Dec 12, 2023 | Ongoing | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
55 | 6 | Social Media Push and Engagement | Promote the app on social media platforms and respond to user feedback. | Marketing Team | Dec 12, 2023 | Ongoing | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
56 | Customer Support Readiness | Ensure customer support team is prepared to handle user inquiries or issues. | Customer Support Team | Dec 9, 2023 | Ongoing | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
57 | 7 | Post-launch Feedback Gathering | Collect user reviews, feedback, and address any critical issues immediately. | QA & Customer Support Teams | Dec 13, 2023 | Ongoing | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
58 | 8 | User Onboarding Support | Provide in-app user tutorials and educational resources to guide new users. | Product & Marketing Teams | Dec 13, 2023 | Ongoing | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
59 | 9 | Post-launch Updates & Bug Fixes | Roll out app updates for any bugs discovered after the launch. | Development Team | Dec 15, 2023 | Ongoing | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
60 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
61 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
62 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
63 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
64 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
65 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
66 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
67 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
68 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
69 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
70 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
71 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
72 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
73 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
74 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
75 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
76 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
77 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
78 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
79 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
80 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
81 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
82 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
83 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
84 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
85 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
86 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
87 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
88 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
89 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
90 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
91 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
92 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
93 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
94 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
95 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
96 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
97 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
98 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||