No.Process Step / Task
Observed Waste / Issue
ECRS Category (E / C / R / S)
Proposed Action / Idea
Expected BenefitResponsible PersonDue DateStatus / Result
2
1Material loadingExcess walking distance to pick materialsE - EliminateMove material rack closer to workstationReduce walking time by 30%Mr. A2025-10-15Planned
3
2AssemblyTwo operators needed for simple taskC - CombineMerge tasks and use a simple fixtureSave manpower, reduce waiting timeMs. B2025-10-20In Progress
4
3InspectionUnnecessary double check by QCR - RearrangeMove inspection step to after assembly instead of before packagingShorten lead timeMr. C2025-10-25Completed
5
4PackagingToo many manual tape sealing stepsS - SimplifyUse automatic tape dispenserImprove consistency & reduce fatigueMs. D2025-10-30Planned
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100