Estimate of Materials and Cost of Construction
3
4
Date:6/6/2018SummaryAmount
5
Project: BUILDING CONSTRUCTIONSubtotal $ 1,368,240
6
Project Location:
Profit/Overhead
$ 424,154
7
Total $ 1,792,394
8
9
ITEM #REF. SHEETDETAILCSI SECTDESCRIPTIONQTY.WASTAGEQTY WITH
WASTAGE
UNITUNIT LABOR COSTUNIT MATERIAL COSTITEM COSTTRADE COST
10
11
DIV-03CONCRETE $ 1,368,240
12
13
CONCRETE FOOTINGS
14
1S2.1a, S2.1b1/ S2.3Reinf. Concrete footing 182 5% 191 CY $ 570.0 $ 180.0 $ 143,098
15
2S2.1a, S2.1b1A/ S2.3Reinf. Concrete footing 1 5% 1 CY $ 570.0 $ 180.0 $ 552
16
3S2.1a, S2.1b2/ S2.3Reinf. Concrete footing 11 5% 12 CY $ 570.0 $ 180.0 $ 8,905
17
4S2.1a, S2.1b3/ S2.3Reinf. Concrete footing 17 5% 18 CY $ 570.0 $ 180.0 $ 13,169
18
5S2.1a 4/ S2.3Reinf. Concrete footing 30 5% 31 CY $ 570.0 $ 180.0 $ 23,360
19
6S2.1a 5/ S2.3Reinf. Concrete footing 58 5% 61 CY $ 570.0 $ 180.0 $ 45,790
20
7S2.1b7/ S2.3Reinf. Concrete footing 6 5% 7 CY $ 570.0 $ 180.0 $ 4,938
21
8S2.1b8/ S2.3Reinf. Concrete footing
Note: No section detail is provided. Assumed same as for 7/ S2.3
2 5% 2 CY $ 570.0 $ 180.0 $ 1,535
22
9S2.1b9/ S2.3Reinf. Concrete footing 32 5% 34 CY $ 570.0 $ 180.0 $ 25,394
23
10S2.1b10/ S2.3Reinf. Concrete footing 2 5% 2 CY $ 570.0 $ 180.0 $ 1,645
24
11S2.1b11/ S2.3Reinf. Concrete footing 11 5% 12 CY $ 570.0 $ 180.0 $ 8,948
25
12S2.1b12/ S2.3Reinf. Concrete footing 30 5% 32 CY $ 570.0 $ 180.0 $ 23,766
26
13S2.1bReinf. Concrete footing (at bottom left of S2.1b)
Note:
No specific detail is provided. Depth is considered as 3'H
33 5% 34 CY $ 570.0 $ 180.0 $ 25,813
27
28
14S2.1a
S2.1b
Footing
Schedule
(3'x3'x1') Reinforced concrete footing (F3.0) - 16 EA 5 5% 6 CY $ 570.0 $ 180.0 $ 4,200
29
15(3'6"x3'6"x1') Reinforced concrete footing (F3.5) - 12 EA 5 5% 6 CY $ 570.0 $ 180.0 $ 4,288
30
16(4'3"x4'3"x1'2") Reinforced concrete footing (F4.25) - 2 EA 2 5% 2 CY $ 570.0 $ 180.0 $ 1,233
31
17(4'6"x4'6"x1'2") Reinforced concrete footing (F4.5) - 2 EA 2 5% 2 CY $ 570.0 $ 180.0 $ 1,382
32
18(5'x5'x1'4") Reinforced concrete footing (F5.0) - 16 EA 20 5% 21 CY $ 570.0 $ 180.0 $ 15,517
33
19(6'x6'x1'6") Reinforced concrete footing (F6.0) - 18 EA 36 5% 38 CY $ 570.0 $ 180.0 $ 28,350
34
20(6'3"x6'3"x1'6") Reinforced concrete footing (F6.25) - 5 EA 11 5% 11 CY $ 570.0 $ 180.0 $ 8,545
35
21(6'6"x6'6"x1'6") Reinforced concrete footing (F6.5) - 3 EA 7 5% 7 CY $ 570.0 $ 180.0 $ 5,545
36
22(7'x7'x1'8") Reinforced concrete footing (F7.0) - 2 EA 6 5% 6 CY $ 570.0 $ 180.0 $ 4,773
37
23(7'x7'x1'8") Reinforced concrete footing (F7.0A) - 2 EA 6 5% 6 CY $ 570.0 $ 180.0 $ 4,773
38
39
CONCRETE SLABS
40
24S2.1b11/ S2.3(1'2" thk.) Reinf. concrete slab under elevator pit 15 5% 15 CY $ 505.0 $ 165.0 $ 10,243
41
25S2.1bS2.3(5" thk.) Basement reinf. concrete slab on grade 62 5% 65 CY $ 440.0 $ 150.0 $ 38,523
42
26S2.1a, S2.1bS2.3(5" thk.) First floor Reinf. concrete slab on grade 409 5% 430 CY $ 440.0 $ 150.0 $ 253,433
43
27S2.1b(18" thk.) Reinf. Concrete slab on grade (at bottom left of S2.1b) 45 5% 47 CY $ 440.0 $ 150.0 $ 27,588
44
28S3.2a, S3.2bS4.2, A8.22(Approx. 3-1/2" thk.) Ecospan concrete slab on metal deck at second floor 327 5% 344 CY $ 400.0 $ 130.0 $ 182,169
45
29S3.3a, S3.3bS4.2, A8.22(Approx. 3-1/2" thk.) Ecospan concrete slab on metal deck at third floor 283 5% 297 CY $ 400.0 $ 130.0 $ 157,227
46
30S3.4a, S3.4bS4.2, A8.22(Approx. 3-1/2" thk.) Ecospan concrete slab on metal deck at roof 283 5% 297 CY $ 400.0 $ 130.0 $ 157,227
47
48
49
CONCRETE WALLS
50
31S2.1b7/ S2.3(1'2" thk.) Reinf. concrete walls
Note: 12' H wall height is taken in basement
27 5% 28 CY $ 570.0 $ 180.0 $ 21,035
51
32S2.1b9/ S2.3(12" thk.) Reinf. Concrete walls
Note: 12' H wall height is taken in basement
98 5% 103 CY $ 570.0 $ 180.0 $ 77,000
52
33S2.1b10/ S2.3(1'6" thk.) Reinf. Concrete walls
Note: 12' H wall height is taken in basement
105% 10 CY $ 570.0 $ 180.0 $ 7,823
53
34S2.1b11/ S2.3(12" thk.) Reinf. Concrete walls
Note: Elevator wall is taken as 5'H in basement
14 5% 15 CY $ 570.0 $ 180.0 $ 11,185
54
35S2.1b(12" thk.) Reinf. Concrete foundation walls (at bottom left of S2.1b)
Note: No specific detail is provided. Height is considered as 5'H
10 5% 11 CY $ 570.0 $ 180.0 $ 7,948
55
56
CONCRETE PIERS
57
36S2.1a, S2.1bPier Schedule(18"x18") Reinf. concrete pier (P1) - 35 EA
Note:
(3'6"H) Pier is taken from elevations
10 5% 11 CY $ 570.0 $ 180.0 $ 8,039
58
37S2.1a, S2.1bPier Schedule(16"x16") Reinf. CMU pier (P2) - 10 EA
Note:
(5'H) Pier is taken from elevations
4 5% 4 CY $ 570.0 $ 180.0 $ 3,281
59
60
DIV-05METALS $ -
61
62
STEEL REINFORCEMENT
63
64
S2.1a
S2.1b
1/ S2.3Reinf. Concrete footing
65
38#5 Continuous bars (8 EA) 8,160 5% 8,568 LF $ -
66
39#5 bar @ 12" O.C. (5 EA) 13,586 5% 14,266 LF $ -
67
68
S2.1a
S2.1b
1A/ S2.3Reinf. Concrete footing
69
40#5 Continuous bars (8 EA) 31 5% 33 LF $ -
70
41#5 bar @ 12" O.C. (5 EA @ each section) 130 5% 137 LF $ -
71
72
S2.1a
S2.1b
2/ S2.3Reinf. Concrete footing
73
42#5 Continuous bars (8 EA) 546 5% 574 LF $ -
74
43#5 bar @ 12" O.C. (5 EA @ each section) 3,934 5% 4,131 LF $ -
75
76
S2.1a
S2.1b
3/ S2.3Reinf. Concrete footing
77
44#5 Continuous bars (9 EA) 819 5% 860 LF $ -
78
45#5 bar @ 12" O.C. (6 EA @ each section) 1,638 5% 1,720 LF $ -
79
80
S2.1a
S2.1b
4/ S2.3Reinf. Concrete footing
81
46#5 Continuous bars (3 EA) 795 5% 835 LF $ -
82
47#4 bar @ 16" O.C. (6 EA @ each section) 1,177 5% 1,235 LF $ -
83
84
S2.1a
S2.1b
5/ S2.3Reinf. Concrete footing
85
48#5 Continuous bars (10 EA) 5,250 5% 5,513 LF $ -
86
49#4 bar @ 16" O.C.(1 EA @ each section) 3,780 5% 3,969 LF $ -
87
50#5 bar @ 12" O.C. (1 EA @ each section) 4,629 5% 4,860 LF $ -
88
89
S2.1a
S2.1b
7/ S2.3Reinf. Concrete footing
90
51#5 Continuous bars (3 EA) 154 5% 162 LF $ -
91
52#5 bar @ 12" O.C.(1 EA @ each section) 453 5% 475 LF $ -
92
93
S2.1a
S2.1b
8/ S2.3Reinf. Concrete footing -
94
53#5 Continuous bars (3 EA) 48 5% 50 LF $ -
95
54#5 bar @ 12" O.C.(1 EA @ each section) 141 5% 148 LF $ -
96
Note: No specific detail is provided. Considered same as 7/ S2.3
97
98
S2.1a
S2.1b
9/ S2.3Reinf. Concrete footing
99
55#5 Continuous bars (3 EA) 800 5% 840 LF $ -
100
56#5 bar @ 12" O.C.(1 EA @ each section) 2,396 5% 2,516 LF $ -