ABCDEFGHIJKLMNOPQRSTUVWXYZAAABACADAEAFAGAHAIAJAKALAMANAOAPAQARASATAUAVAWAXAYAZBABBBCBDBEBFBGBHBIBJBKBLBMBNBOBP
1
ONE WAY SPANNING SLAB DESIGN TO BS8110Job No.
Sheet of
Rev.
2
3
Job Title:-
CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH STESEN MINYAK
4
PETRONAS DI ATAS LOT 4, PEKAN BUKIT KEMUNING.
5
Subject:-
ROOF SLAB
6
7
Client:-
Designed by
Date :-
8
PETRONAS DAGANGAN BERHAD
ABY10-Jan-26
9
Checked by
Date:-
10
11
REF.CALCULATIONSOUTPUT
12
13
DATA
14
Span Lx =3600mm,Fcu =25N/m²
15
Den.of concrete=
24N/m²Fy =460N/m²0
16
Thk. Of Slab=
250mm
Cover =
40mm
17
Depth,d =197.5mm
Dia. bar =
25mm^2
18
19
LOADING
20
Finishes=
10kN/m²
21
Live load=
20kN/m²
22
23
24
DEAD LOAD
LIVE LOAD
Table 3.19 Bending moment and shear force coefficients for flat slabs of three or more equal spans
25
26
SLAB 6kN/m²20kN/m²
Outer Support
Near centre of
First interior
Centre of interior
Interior Support
27
FINISHING ETC.
10kN/m²MOMENT-0.040 -0.020 0.083 -0.063 0.071 -0.055
28
SHEAR0.450 0.400 0.600 0.500
29
Gk =16kN/m²Qk=20kN/m²
TOTAL COLUMN MOMENTS
0.040 0.022 0.022
30
31
DEAD LOAD FACTOR
1.4
32
IMPOSED LOAD FACTOR =
1.6
33
F =195.84 kN
34
35
Middle ofMiddle of
36
end spanint. spanSimply
37
& fist inter.
& Inter. support
supported
38
support
39
MOMENT(kNm)
60.63 44.42 88.13
40
SHEAR(kN)117.50 97.92 97.92
41
M60.63 44.42 88.13
42
K0.06 0.05 0.09
43
la0.93 0.95 0.89
44
z182.75 186.94 175.14
45
As req.829 594 1257
46
No.of bar req.
1.69 1.21 2.56
47
Diameter Bar
20 20 12
48
No. of bar prov.
7710
49
As prov.2199 2199 1131
50
Spacing bar
125125200
51
Steel ratio p %
0.88 0.88 0.45
52
Vc0.72 0.72 0.58
53
V/bd0.59 0.50 0.50
54
Shear Check
O.KO.KO.K
55
M/bd^21.55 1.14 2.26
56
fs tension108.38 77.62 319.63
57
Mod.factor (tension)
1.80 2.00 0.97
58
L/d allowble
46.84 52.00 19.30
59
L/d actual18.23 18.23 18.23
60
DeflectionDef.O.KDef.O.KDef.O.K
61
Spacing bar
T20@125c/c
T20@125c/c
T12@200c/c
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100