B | C | D | E | F | G | H | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | AA | AB | AC | AD | AE | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | No | No. Ruas | N a m a R u a s | Jembatan | Lokasi | Latitude / Longitude | Bentang (m) | Lebar (m) | BA Tipe | Jenis Pondasi | Kondisi Jemb. | Kondisi Bagian Jembatan | Tahun Pemba- ngunan | Tahun Inspeksi | Pena- nganan Disa- rankan | ||||||||||||||
2 | Nomor | Nama | Kota Asal | STA/ Km | Panjang | Jlh. | Pondasi | Bang. Bawah | Bang. Atas | Lantai | Perleng kapan | ||||||||||||||||||
3 | |||||||||||||||||||||||||||||
4 | 1 | 145 | SIPANGIMBAR - BTS. PALUTA (TOLANG ) | ||||||||||||||||||||||||||
5 | 2 | 03.145.001.0 | AEK MENEK | SBG | 171+700 | 1.8484917 - 99.3967000 | 3,20 | 1 | 5,20 | PTI | LS | BAIK | 0 | 0 | 0 | 0 | 0 | 2001 | 2016 | - | |||||||||
6 | 3 | 03.145.002.0 | AEK BONDAR 1 | SBG | 173+900 | 1.8573567 - 99.4096833 | 5,50 | 1 | 4,50 | GBI | LS | BAIK | 0 | 0 | 0 | 0 | 0 | 2001 | 2016 | - | |||||||||
7 | 4 | 03.145.003.0 | AEK SIPORING | SBG | 175+900 | 1.8701033 - 99.4106567 | 8,00 | 1 | 4,00 | GTI | LS | RUSAK | 1 | 0 | 2 | 2 | 0 | 2013 | 2016 | - | |||||||||
8 | 5 | 03.145.004.0 | AEK SIDOGOR | SBG | 176+600 | 1.8749517 - 99.4112550 | 8,00 | 1 | 6,00 | GTI | LS | BAIK | 0 | 0 | 0 | 0 | 0 | 2012 | 2016 | - | |||||||||
9 | |||||||||||||||||||||||||||||
10 | |||||||||||||||||||||||||||||
11 | |||||||||||||||||||||||||||||
12 | |||||||||||||||||||||||||||||
13 |