| A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | ||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | Sr. No. | Name of Work / Description | Tender Notice Date | Tender Opening Date | Estimated Cost (In Lacs) | Work Order No. | Work Order Date | Time Period for Work Completion | Name Of Agency | Name of Concerned Officer | Present Work Status | Date Of Status Updation | Resolution No. Of Comparative Statement | Photos | ||||||||||||
2 | 1 | Supply of 92 no. Safai Sweak Through outsource for MC Patiala | 18/19.09.2024 | 180.51 | 1261/ 27.01.25 | 27-01-2025 | 12 months | S.S. Service Providers | 18-08-2025 | In anticipation 27.01.2025 | ||||||||||||||||
3 | 2 | Construction of pulic toilet near sanaur old mandi and tiwana chowk in Patiala | 20/21.01.2025 | 36.6 | 1262/ 25.02.25 | 25-02-2025 | 06 months | Sanjay Mehta | 18-08-2025 | In anticipation 11.02.2025 | ||||||||||||||||
4 | 3 | Renovation and construction of public toilet at tafazalpura tanki park in Patiala-2 | 20/21.01.2025 | 13.58 | 1263/ 25.02.25 | 25-02-2025 | 04 months | Parminder Singh | 18-08-2025 | In anticipation 11.02.2025 | ||||||||||||||||
5 | 4 | Construction of public toilet at factory area and gobing bagh backman factory in Patiala-2 | 20/21.01.2025 | 36.09 | 1264/ 25.02.25 | 25-05-2025 | 06 months | Sanjay Mehta | 18-08-2025 | In anticipation 11.02.2025 | ||||||||||||||||
6 | 5 | MSTC Ltd (Metal scrap trade corporation limited) regd.office 22SC acharia Jagdish chandra boss road kolkata- 700020 | 1265-1267/ 02.02.25 | 02-02-2025 | 18-08-2025 | |||||||||||||||||||||
7 | 6 | Supply of Wire/Cable and other mateiral of street light for MC Patiala | 20/21.03.2025 | 22.88 GST 27.00 | 1268/ 06.05.25 | 06-05-2025 | 02 months | RR Enterprises | 18-08-2025 | 23 23.04.2025 | ||||||||||||||||
8 | 7 | Supply of Bend/Clamp and other material of streetlight for MC Patiala | 30/31.01.2025 | 15.5 | 1269/06.05.25 | 06-05-2025 | 02 months | RR Enterprises | 18-08-2025 | 11 23.04.2025 | ||||||||||||||||
9 | 8 | Reconstruction of damage boundary wall of roase garden | 30/31.01.2025 | 33.12 | 1270/06.05.25 | 06-05-2025 | 04 months | Inder kumar | 18-08-2025 | 51 23.04.2025 | ||||||||||||||||
10 | 9 | Supply and Installation of garden bench (H.Shaped) | 4/5.12.2024 | 10.3 | 1271/07.05.25 | 07-05-2025 | 03 months | M/s Kamboj tile Industry | 18-08-2025 | 09 23.04.2025 | ||||||||||||||||
11 | 10 | Installation of (straight bore tubewell at Chotta aria majra | 13.36 | 1272 07.05.2025 | 07-05-2025 | RR Enterprises | 18-08-2025 | |||||||||||||||||||
12 | 11 | Construction of recharge wells (Khambaati model) of dia 15 at various location of PTA 2 area | 32.1 | 1273 28.05.2025 | 28-05-2025 | The MG Co Op L&C Society Limited | 18-08-2025 | |||||||||||||||||||
13 | 12 | Supply of manhole cover frame of different sizes for Municipal Corporation Patiala | 14.62 | 1274 04.06.2025 | 04-06-2025 | Inder kumar | 18-08-2025 | |||||||||||||||||||
14 | 13 | RESTORATION OF ROADS EXCAVATED BY L&T FOR PIPELINE BADUNGER (JOGINDER NAGAR) | 15/16.05.2025 | 49.79 | 1275 09.06.2025 | 09-06-2025 | 6 months | B.S. Builders | 18-08-2025 | 85 29.05.25 | ||||||||||||||||
15 | 14 | RESTORATION OF ROADS EXCAVATED BY L&T FOR PIPELINE WORK IN GREEN PARK COLONY PARTS, INDRA PURI COLONY, NEW MEHAR SINGH COLONY | 15/16.05.2025 | 49.75 | 1276 09.06.2025 | 09-06-2025 | 6 months | York Builders Pvt. Ltd. | 18-08-2025 | 86 29.05.25 | ||||||||||||||||
16 | 15 | RESTORATION OF ROADS EXCAVATED BY L&T FOR PIPELINE WORK IN TRIPURI AREA RIGHT SIDE FROM GOLGAPPA CHOWNK TO WATER TANK ROAD, DISPENSRY AND POLICE STATION ROAD | 15/16.05.2025 | 49.38 | 1277 09.06.2025 | 09-06-2025 | 6 months | York Builders Pvt. Ltd. | 18-08-2025 | 87 29.05.25 | ||||||||||||||||
17 | 16 | RESTORATION OF ROADS EXCAVATED BY L&T FOR PIPELINE WORK IN MANJIT NAGAR, SIDHU COLONY, RANJIT VIHAR | 15/16.05.2025 | 46.61 | 1278 09.06.2025 | 09-06-2025 | 6 months | York Builders Pvt. Ltd. | 18-08-2025 | 88 29.05.25 | ||||||||||||||||
18 | 17 | RESTORATION OF ROADS EXCAVATED BY L&T FOR PIPELINE WORK NEW MOTI BAGH SAHIB COLONY | 15/16.05.2025 | 46 | 1279 09.06.2025 | 09-06-2025 | 6 months | B.S. Builders | 18-08-2025 | 89 29.05.25 | ||||||||||||||||
19 | 18 | RESTORATION OF ROADS EXCAVATED BY L&T FOR PIPELINE WORK BADUNGAR MAIN ROAD | 15/16.05.2025 | 45.8 | 1280 09.06.2025 | 09-06-2025 | 6 months | B.S. Builders | 18-08-2025 | 90 29.05.25 | ||||||||||||||||
20 | 19 | RESTORATION OF ROADS EXCAVATED BY L&T FOR PIPELINE WORK ABLOWAL | 15/16.05.2025 | 44.82 | 1281 09.06.2025 | 09-06-2025 | 6 months | York Builders Pvt. Ltd. | 18-08-2025 | 91 29.05.25 | ||||||||||||||||
21 | 20 | RESTORATION OF ROADS EXCAVATED BY L&T FOR PIPELINE WORK SHEESH MEHAL ENCLAVE | 15/16.05.2025 | 43.54 | 1282 09.06.2025 | 09-06-2025 | 6 months | B.S. Builders | 18-08-2025 | 92 29.05.25 | ||||||||||||||||
22 | 21 | RESTORATION OF ROADS EXCAVATED BY L&T FOR PIPELINE WORK AJIT NAGAR NEAR BACHAN DHABHA | 15/16.05.2025 | 41.73 | 1283 09.06.2025 | 09-06-2025 | 6 months | B.S. Builders | 18-08-2025 | 93 29.05.25 | ||||||||||||||||
23 | 22 | RESTORATION OF ROADS EXCAVATED BY L&T FOR PIPELINE WORK IN DEEP NAGAR, EKTA VIHAR | 15/16.05.2025 | 39.52 | 1284 09.06.2025 | 09-06-2025 | 4 months | York Builders Pvt. Ltd. | 18-08-2025 | 94 29.05.25 | ||||||||||||||||
24 | 23 | RESTORATION OF ROADS EXCAVATED BY L&T FOR PIPELINE WORK IN HIRA BAGH & ADJOINING AREA | 15/16.05.2025 | 38.22 | 1285 09.06.2025 | 09-06-2025 | 4 months | York Builders Pvt. Ltd. | 18-08-2025 | 95 29.05.25 | ||||||||||||||||
25 | 24 | RESTORATION OF ROADS EXCAVATED BY L&T FOR PIPELINE WORK MOTI BAGH SAHIB COLONY | 15/16.05.2025 | 33.61 | 1286 09.06.2025 | 09-06-2025 | 6 months | B.S. Builders | 18-08-2025 | 96 29.05.25 | ||||||||||||||||
26 | 25 | RESTORATION OF ROADS EXCAVATED BY L&T FOR PIPELINE WORK IN YADWINDRA COLONY AND AZAD NAGAR PARTS | 15/16.05.2025 | 30.6 | 1287 09.06.2025 | 09-06-2025 | 4 months | York Builders Pvt. Ltd. | 18-08-2025 | 97 29.05.25 | ||||||||||||||||
27 | 26 | RESTORATION OF ROADS EXCAVATED BY L&T FOR PIPELINE WORK IN TRIPURI INCL. MAAN GYM ROAD GOLGAPPA ROAD (FROM GOLGAPPA CHOWNK TO KHURANA SHOP | 15/16.05.2025 | 27.74 | 1288 09.06.2025 | 09-06-2025 | 4 months | York Builders Pvt. Ltd. | 18-08-2025 | 98 29.05.25 | ||||||||||||||||
28 | 27 | RESTORATION OF ROADS EXCAVATED BY L&T FOR PIPELINE WORK FRIENDS COLONY | 15/16.05.2025 | 26.91 | 1289 09.06.2025 | 09-06-2025 | 4 months | York Builders Pvt. Ltd. | 18-08-2025 | 99 29.05.25 | ||||||||||||||||
29 | 28 | RESTORATION OF ROADS EXCAVATED BY L&T FOR PIPELINE WORK IN HARINDER NAGAR | 15/16.05.2025 | 24.18 | 1290 09.06.2025 | 09-06-2025 | 4 months | York Builders Pvt. Ltd. | 18-08-2025 | 100 29.05.25 | ||||||||||||||||
30 | 29 | RESTORATION OF ROADS EXCAVATED BY L&T FOR PIPELINE WORK IN DASHMESH NAGAR | 15/16.05.2025 | 17.94 | 1291 09.06.2025 | 09-06-2025 | 4 months | York Builders Pvt. Ltd. | 18-08-2025 | 101 29.05.25 | ||||||||||||||||
31 | 30 | RESTORATION OF ROADS EXCAVATED BY L&T FOR PIPELINE WORK BHARPUR GARDAN | 15/16.05.2025 | 14.89 | 1292 09.06.2025 | 09-06-2025 | 4 months | York Builders Pvt. Ltd. | 18-08-2025 | 102 29.05.25 | ||||||||||||||||
32 | 31 | RESTORATION OF ROADS EXCAVATED BY L&T FOR PIPELINE WORK MODI COLLEGE MAIN ROAD | 15/16.05.2025 | 11.47 | 1293 09.06.2025 | 09-06-2025 | 4 months | York Builders Pvt. Ltd. | 18-08-2025 | 103 29.05.25 | ||||||||||||||||
33 | 32 | RESTORATION OF ROADS EXCAVATED BY L&T FOR PIPELINE WORK SHAHEED BHAGAT SINGH CHONK INNER ROAD | 15/16.05.2025 | 11.18 | 1294 09.06.2025 | 09-06-2025 | 4 months | York Builders Pvt. Ltd. | 18-08-2025 | 104 29.05.25 | ||||||||||||||||
34 | 33 | RESTORATION OF ROADS EXCAVATED BY L&T FOR PIPELINE WORK IN TRIPURI AREA LEFT SIDE FROM GOLGAPPA CHOWNK TO WATER TANK ROAD | 15/16.05.2025 | 5.58 | 1295 09.06.2025 | 09-06-2025 | 2 months | York Builders Pvt. Ltd. | 18-08-2025 | 105 29.05.25 | ||||||||||||||||
35 | 34 | RESTORATION OF ROADS EXCAVATED BY L&T FOR PIPELINE WORK SULLAR | 15/16.05.2025 | 25.65 | 1296 09.06.2025 | 09-06-2025 | 4 months | B.S. Builders | 18-08-2025 | 106 29.05.25 | ||||||||||||||||
36 | 35 | Supply, Installation, Operation and Maintenance of Public Electric Vehicle Charging Stations on a Build, Operate, Transfer (BOT) model 2.50 per kWh | 1297-1299 10.06.2025 | 10-06-2025 | 10 years | Zivah International Private Limited. 3C/21, second floor, new rohtak road Karol Bagh Delhi | 18-08-2025 | |||||||||||||||||||
37 | 36 | RESTORATION OF ROADS EXCAVATED BY L&T FOR PIPELINE WORK IN GHUMAN NAGAR A, AZAD NAGAR | 15/16.05.2025 | 65.51 | 1300 23.06.2025 | 23-06-2025 | 6 months | york builders pvt ltd | 18-08-2025 | |||||||||||||||||
38 | 37 | RESTORATION OF ROADS EXCAVATED BY L&T FOR PIPELINE WORK IN JAGDISH COLONY, SHAHEED UDHAM SINGH NAGAR, KAMAL COLONY | 15/16.05.2025 | 63.46 | 1301 23.06.2025 | 23-06-2025 | 6 months | york builders pvt ltd | 18-08-2025 | |||||||||||||||||
39 | 38 | RESTORATION OF ROADS EXCAVATED BY L&T FOR PIPELINE WORK IN RATTAN NAGAR, RATTAN NAGAR EXT. | 15/16.05.2025 | 98.8 | 1302 23.06.2025 | 23-06-2025 | 6 months | york builders pvt ltd | 18-08-2025 | |||||||||||||||||
40 | 39 | RESTORATION OF ROADS EXCAVATED BY L&T FOR PIPELINE WORK IN GREEN PARK COLONY, SHELLER ROAD | 15/16.05.2025 | 56.97 | 1303 23.06.2025 | 23-06-2025 | 6 months | B.S. Builders | 18-08-2025 | |||||||||||||||||
41 | 40 | RESTORATION OF ROADS EXCAVATED BY L&T FOR PIPELINE WORK IN ADARSH COLONY AND PREM NAGAR | 15/16.05.2025 | 89.41 | 1304 23.06.2025 | 23-06-2025 | 6 months | B.S. Builders | 18-08-2025 | |||||||||||||||||
42 | 41 | RESTORATION OF ROADS EXCAVATED BY L&T FOR PIPELINE WORK IN ABLOWAL ROAD (THAPAR SIDE) | 15/16.05.2025 | 84.84 | 1305 23.06.2025 | 23-06-2025 | 6 months | york builders pvt ltd | 18-08-2025 | |||||||||||||||||
43 | 42 | RESTORATION OF ROADS EXCAVATED BY L&T FOR PIPELINE WORK IN HT LINE ROAD NEAR ADARSH COLONY & BRANCH (NEAR LAMBA DAIRY) | 15/16.05.2025 | 74.84 | 1306 23.06.2025 | 23-06-2025 | 6 months | B.S. Builders | 18-08-2025 | |||||||||||||||||
44 | 43 | RESTORATION OF ROADS EXCAVATED BY L&T FOR PIPELINE WORK PARTAP NAGAR | 15/16.05.2025 | 95.75 | 1307 23.06.2025 | 23-06-2025 | 6 months | B.S. Builders | 18-08-2025 | |||||||||||||||||
45 | 44 | RESTORATION OF ROADS EXCAVATED BY L&T FOR PIPELINE WORK KARTAR COLONY | 15/16.05.2025 | 98.43 | 1308 23.06.2025 | 23-06-2025 | 6 months | york builders pvt ltd | 18-08-2025 | |||||||||||||||||
46 | 45 | RESTORATION OF ROADS EXCAVATED BY L&T FOR PIPELINE WORK KRISHNA COLONY | 15/16.05.2025 | 80.57 | 1309 23.06.2025 | 23-06-2025 | 6 months | york builders pvt ltd | 18-08-2025 | |||||||||||||||||
47 | 46 | RESTORATION OF ROADS EXCAVATED BY L&T FOR PIPELINE WORK MAJITHIA ENCLAVE | 15/16.05.2025 | 69.69 | 1310 23.06.2.025 | 23-06-2025 | 6 months | B.S. Builders | 18-08-2025 | |||||||||||||||||
48 | 47 | RESTORATION OF ROADS EXCAVATED BY L&T FOR PIPELINE WORK IN (ROSE GARDEN, CHOTA ARAI MAJRA, JAGDISH COLONY, TEJ BAGH COLONY, ROSE COLONY, GOPAL COLONY & ADJOINING AREA) | 15/16.05.2025 | 98.34 | 1311 23.06.2.025 | 23-06-2025 | 6 months | york builders pvt ltd | 18-08-2025 | |||||||||||||||||
49 | 48 | RESTORATION OF ROADS EXCAVATED BY L&T FOR PIPELINE WORK ALIPUR, JHILL TO ALIPUR CHOWNK | 15/16.05.2025 | 95.72 | 1312 26.06.2025 | 26-06-2025 | 6 months | york builders pvt ltd | 18-08-2025 | |||||||||||||||||
50 | 49 | RESTORATION OF ROADS EXCAVATED BY L&T FOR PIPELINE WORK SANAURI ADDA ROAD | 15/16.05.2025 | 57.2 | 1313 26.06.2025 | 26-06-2025 | 6 months | B.S. Builders | 18-08-2025 | |||||||||||||||||
51 | 50 | RESTORATION OF ROADS EXCAVATED BY L&T FOR PIPELINE WORK RANJIT VIHAR, EKTA NAGAR & AMAN NAGAR | 15/16.05.2025 | 99.55 | 1314 26.06.2025 | 26-06-2025 | 6 months | york builders pvt ltd | 18-08-2025 | |||||||||||||||||
52 | 51 | Supply of LED streetlight drivers, LED chips, SPD and other related material for MC Patiala for the period of 6 months | 26/27.05.2025 | 42.92 | 1315 30.06.2025 | 30-06-2025 | 6 months | Manoj Kumar Gupta | 18-08-2025 | In anticipation 26.06.2025 | ||||||||||||||||
53 | 52 | Estimate for clearance of weed, jala, booty etc in between RD 13440-6290 from the bed of Patiala badi nadi before the flood season of year 2025-26 | 27/30.06.2025 | 15.16 | 1316 02.07.2025 | 02-07-2025 | 15 days | SANJAY MEHTA | 18-08-2025 | 154 01.07.2025 | ||||||||||||||||
54 | 53 | Disinfection of tubewell with sodium hyphcloride for Patiala | 02/03.07.2025 | 48 | 1317 09.07.2025 | 09-07-2025 | 4.5 months | RAJDEEP ENTERPRISES | 18-08-2025 | In anticipation 09.07.2025 | ||||||||||||||||
55 | 54 | EV charger 15KW MC Patiala | 20.06.2025 | 3.34 | 1318 10.07.2025 | 10-07-2025 | 25 days | Thunderplus Solutions Pvt Ltd | 18-08-2025 | 164 01.07.2025 | ||||||||||||||||
56 | 55 | EV charger 15KW Fire Brigade Patiala | 20.06.2025 | 3.34 | 1319 10.07.2025 | 10-07-2025 | 25 days | Thunderplus Solutions Pvt Ltd | 18-08-2025 | 165 01.07.2025 | ||||||||||||||||
57 | 56 | RESTORATION OF ROADS EXCAVATED BY LT FOR PIPELINE WORK ST. NO. 7 AMAN NAGAR AND FOCAL POINT AREA | 15/16.05.2025 | 96.49 | 1320 10.07.2025 | 10-07-2025 | 6 months | York builders Pvt. Ltd | 18-08-2025 | 150 01.07.2025 | ||||||||||||||||
58 | 57 | S/E and upgradation of streetlight poles, cables and other related works of Focal Point Patiala, Focal Point to Bhagat Singh Colony, tiwana chownk to Seona Road and on Jail Road | 09/10.06.2025 | 46.42 | 1321 10.07.2025 | 10-07-2025 | 3 months | Raman Electricals | 18-08-2025 | 153 01.07.2025 | ||||||||||||||||
59 | 58 | Providing maintenance, repair of damaged equipment and operation of various junctions within the Municipal Limits for a period of 2 years | 05/06.06.2025 | 28.75 | 1322 10.07.2025 | 10-07-2025 | 2 years | Protele Engineers | 18-08-2025 | 156 01.07.2025 | ||||||||||||||||
60 | 59 | Construction of Boundary wall at Jujhar Nagar Park | 05/06.06.2025 | 16.6 | 1323 10.07.2025 | 10-07-2025 | 4 months | SANJAY MEHTA | 18-08-2025 | 161 01.07.2025 | ||||||||||||||||
61 | 60 | Estimate for supply of material for civil store, MC Patiala | 26/27.05.2025 | 9.95 | 1324 10.07.2025 | 10-07-2025 | 6 months | NYC ENTERPRISES | 18-08-2025 | 151 01.07.2025 | ||||||||||||||||
62 | 61 | Boundary wall and additional work at Fire Brigade Office Patiala | 26/27.05.2025 | 16.24 | 1325 10.07.2025 | 10-07-2025 | 2 months | THE M G CO OP L AND SOCIETY LIMITED | 18-08-2025 | 152 01.07.2025 | ||||||||||||||||
63 | 62 | Installation of straight bore 200 MM ID at various location of Patiala – I | 05/06.06.2025 | 40.08 | 1326 10.07.2025 | 10-07-2025 | 2 months | R.R. ENTERPRISES | 18-08-2025 | 144 01.07.2025 | ||||||||||||||||
64 | 63 | Installation of straight bore 200 MM ID at various location of Patiala – II | 05/06.06.2025 | 40.08 | 1327 10.07.2025 | 10-07-2025 | 2 months | R.R. ENTERPRISES | 18-08-2025 | 145 01.07.2025 | ||||||||||||||||
65 | 64 | Supply of Sky Lift Working height 11 mtr Truck mounted | 09.05.2025 | 28.88 | 1328 10.07.2025 | 10-07-2025 | 60 days | Action Tech | 18-08-2025 | 146 01.07.2025 | ||||||||||||||||
66 | 65 | Procurement of 02 nos Portable Refuse Compactor for Solid Waste Management MC Patiala | 24.06.2025 | 42 | 1329 18.07.2025 | 18-07-2025 | 93 days | TPS Infrastructure Limited | 18-08-2025 | 188 17.07.2025 | ||||||||||||||||
67 | 66 | Procurement of Tipper Having apacity 10.50 CUM for Patiala II | 25.06.2025 | 43.15 | 1330 21.07.2025 | 21-07-2025 | 45 days | A one hydro mechanical engineering | 18-08-2025 | 187 17.07.2025 | ||||||||||||||||
68 | 67 | Procurement of Tipper Having apacity 10.50 CUM for Patiala I | 25.06.2025 | 43.15 | 1331 21.07.2025 | 21-07-2025 | 45 days | A one hydro mechanical engineering | 18-08-2025 | 186 17.07.2025 | ||||||||||||||||
69 | 68 | Procurement of 05 nos tractors for solid waste management MC Patiala GEM | 11.07.2025 | 43.35 | 1332 21.07.2025 | 21-07-2025 | 30 days | Sharan Enterprises | 18-08-2025 | In anticipation 21.07.2025 | ||||||||||||||||
70 | ||||||||||||||||||||||||||
71 | ||||||||||||||||||||||||||
72 | ||||||||||||||||||||||||||
73 | ||||||||||||||||||||||||||
74 | ||||||||||||||||||||||||||
75 | ||||||||||||||||||||||||||
76 | ||||||||||||||||||||||||||
77 | ||||||||||||||||||||||||||
78 | ||||||||||||||||||||||||||
79 | ||||||||||||||||||||||||||
80 | ||||||||||||||||||||||||||
81 | ||||||||||||||||||||||||||
82 | ||||||||||||||||||||||||||
83 | ||||||||||||||||||||||||||
84 | ||||||||||||||||||||||||||
85 | ||||||||||||||||||||||||||
86 | ||||||||||||||||||||||||||
87 | ||||||||||||||||||||||||||
88 | ||||||||||||||||||||||||||
89 | ||||||||||||||||||||||||||
90 | ||||||||||||||||||||||||||
91 | ||||||||||||||||||||||||||
92 | ||||||||||||||||||||||||||
93 | ||||||||||||||||||||||||||
94 | ||||||||||||||||||||||||||
95 | ||||||||||||||||||||||||||
96 | ||||||||||||||||||||||||||
97 | ||||||||||||||||||||||||||
98 | ||||||||||||||||||||||||||
99 | ||||||||||||||||||||||||||
100 |