1 | Welcome to NCDEQ's Stormwater Nitrogen and Phosphorus (SNAP) Tool | |||||||||||||||||||||||||
2 | ||||||||||||||||||||||||||
3 | How to Use SNAP v4.2.0 | |||||||||||||||||||||||||
4 | ||||||||||||||||||||||||||
5 | How are you using SNAP? | |||||||||||||||||||||||||
6 | Helpful Links and Resources: | |||||||||||||||||||||||||
7 | ||||||||||||||||||||||||||
8 | New Development - Regulatory Compliance: | No New Development / Non-Regulatory: | Precipitation Station Map | |||||||||||||||||||||||
9 | Falls Lake Stormwater Rules | CCAP Project | SNAP Users' Manual | |||||||||||||||||||||||
10 | Jordan Lake Stormwater Rules | Grant Programs: | 319(h) | Land & Water Fund | NCSU BAE Stormwater Resources | |||||||||||||||||||||
11 | Neuse Stormwater Rule | 205j | Water Resources Development | Bioretention HyPerTool | ||||||||||||||||||||||
12 | Tar-Pamlico Stormwater Rule | Stormwater Retrofit | PermPave HyPerMod | |||||||||||||||||||||||
13 | Other State or Local Stormwater Nutrient Requirements | SCM-Based Nutrient Bank | Rainwater Harvester | |||||||||||||||||||||||
14 | Who is your stormwater regulator? (check map) | Landcover Conversion | DEMLR Stormwater Manual | |||||||||||||||||||||||
15 | Research Project | SCM Design Specs & Guidelines | ||||||||||||||||||||||||
16 | Etc. | NPS Planning webpage | ||||||||||||||||||||||||
17 | Review Project With Regulator: | All Nutrient Management Strategies | ||||||||||||||||||||||||
18 | Identify Existing Built-Upon Area(s) on Site | Nutrient Reduction Practices and Crediting | ||||||||||||||||||||||||
19 | Review project info against regulation applicability: | Gather Info & Enter Data: | 2023 NC SCM Credit Document | |||||||||||||||||||||||
20 | • Landuse type, part of Commmon Plan of Development? | Pre-Project Land Covers (sqft) | Background documentation on SCMs | |||||||||||||||||||||||
21 | • Is Net Change in Built-Upon Area (BUA) > Zero? | Post-Project Land Covers (sqft) | ||||||||||||||||||||||||
22 | • Nitrogen and Phosphorus Export Rate Targets? | Find Your Precipitation Station | SNAP broken / not working??? | |||||||||||||||||||||||
23 | • Onsite Stormwater Treatment Requirements/Targets? | Go To --> Land Cover Characteristics Sheet | Many Excel functions like cut & paste or drag & drop can damage internal spreadsheet setup and functioning | |||||||||||||||||||||||
24 | • Disturbance thresholds? | Stormwater Control Measure (SCM) Type | ||||||||||||||||||||||||
25 | • Project Density & thresholds? | Hydrologic Soil Group at Site | If you encounter strange spreadsheet behavior we recommend you download SNAP a second time | |||||||||||||||||||||||
26 | • Other project information related to applicability? | Area draining to SCM, including SCM footprint | ||||||||||||||||||||||||
27 | Is nutrient calculation required? | Go To --> SCM Characteristics Sheet | ||||||||||||||||||||||||
28 | Is onsite stormwater treatment required? How much? | |||||||||||||||||||||||||
29 | Does project receive runoff from offsite or Existing BUA? | |||||||||||||||||||||||||
30 | • See Users Manual for Help with more complex scenarios | Find Your Nutrient Reduction: | ||||||||||||||||||||||||
31 | Go To --> Nutrient Export Summary Sheet | |||||||||||||||||||||||||
32 | Look up results - Project Area Post-Project after Treatment: | |||||||||||||||||||||||||
33 | Gather Info & Enter Data: | • Total Nitrogen Change (lb/yr) | ||||||||||||||||||||||||
34 | Project Information Needed for Recordkeeping | • Total Phosphorus Change (lb/yr) | ||||||||||||||||||||||||
35 | • Go To --> Project Info Sheet | DONE! | ||||||||||||||||||||||||
36 | Pre-Project Land Covers (sqft) | |||||||||||||||||||||||||
37 | Post-Project Land Covers (sqft) | |||||||||||||||||||||||||
38 | Find Your Precipitation Station | |||||||||||||||||||||||||
39 | • Go To --> Land Cover Characteristics Sheet | Check Post-Project Condition Against Targets: | ||||||||||||||||||||||||
40 | Stormwater Control Measure (SCM) Type(s) | Review Results with Regulator: | ||||||||||||||||||||||||
41 | Hydrologic Soil Group at Site | Is onsite treatment/nutrient reduction met? | ||||||||||||||||||||||||
42 | Area draining to SCM(s), including SCM footprint(s) | Is Runoff Volume Match an option? | ||||||||||||||||||||||||
43 | • Go To --> SCM Characteristics Sheet | Is there Offsite run-on or Existing BUA? | ||||||||||||||||||||||||
44 | Multiple SCM arrangements possible: | --> Check Users Manual for complex site nutrient accounting | ||||||||||||||||||||||||
45 | • Max 6 catchments, series or parallel | Is there a nutrient export balance after treatment? | ||||||||||||||||||||||||
46 | • 3 SCMs in series per catchment | • Go To --> Nutrient Export Summary Sheet | ||||||||||||||||||||||||
47 | • See Users Manual for Help | Look up: | ||||||||||||||||||||||||
48 | A: TN and TP export targets scaled to to Project Area (lb/yr) | |||||||||||||||||||||||||
49 | B: Project Area Post-Project after Treatment: TN and TP Load (lb/yr) | |||||||||||||||||||||||||
50 | Meeting Requirements | If B > A = remaining nutrient treatment balance | ||||||||||||||||||||||||
51 | DONE! | |||||||||||||||||||||||||
52 | Email Workbook to Regulator | |||||||||||||||||||||||||
53 | ||||||||||||||||||||||||||
54 | ||||||||||||||||||||||||||
55 | Not Fully Meeting Requirements | |||||||||||||||||||||||||
56 | ||||||||||||||||||||||||||
57 | ||||||||||||||||||||||||||
58 | Use Runoff Volume Match | Not meeting onsite treatment | Meeting onsite treatment but still have a balance | |||||||||||||||||||||||
59 | See Regulator for instructions | Use a Regional SCM, consult with Regulator | Remaining balance can be met with Nutrient Offsets: | |||||||||||||||||||||||
60 | Mark "yes" Project uses LID/Runoff Volume Match | Go To --> Project Info Sheet | Consult with Regulator and Nutrient Offset Program | |||||||||||||||||||||||
61 | Go To --> Project Info Sheet | OR: Adjust Post-Project Landcovers | • Go To --> Nutrient Offset Sheet | |||||||||||||||||||||||
62 | Adjust Landcover details as needed | Go To --> Land Cover Characteristics Sheet | DONE! - Email Workbook to Regulator | |||||||||||||||||||||||
63 | Go To --> Land Cover Characteristics Sheet | OR: Scope out best SCMs for objectives | OR: Adjust Landcovers/SCMs until meeting targets onsite | |||||||||||||||||||||||
64 | Adjust SCM details as needed | (see Users Manual for help) | Go To --> Land Cover Characteristics Sheet | |||||||||||||||||||||||
65 | Go To --> SCM Characteristics Sheet | Go To --> SCM Characteristics Sheet | Go To --> SCM Characteristics Sheet | |||||||||||||||||||||||
66 | DONE! - Email Workbook to Regulator | Go back to Check Post-Project Against Targets | Go back to Check Post-Project Against Targets | |||||||||||||||||||||||
67 | ||||||||||||||||||||||||||
68 | ||||||||||||||||||||||||||
69 | ||||||||||||||||||||||||||
70 | ||||||||||||||||||||||||||
71 | ||||||||||||||||||||||||||
72 | ||||||||||||||||||||||||||
73 | ||||||||||||||||||||||||||
74 | ||||||||||||||||||||||||||
75 | ||||||||||||||||||||||||||
76 | ||||||||||||||||||||||||||
77 | ||||||||||||||||||||||||||
78 | ||||||||||||||||||||||||||
79 | ||||||||||||||||||||||||||
80 | ||||||||||||||||||||||||||
81 | ||||||||||||||||||||||||||
82 | ||||||||||||||||||||||||||
83 | ||||||||||||||||||||||||||
84 | ||||||||||||||||||||||||||
85 | ||||||||||||||||||||||||||
86 | ||||||||||||||||||||||||||
87 | ||||||||||||||||||||||||||
88 | ||||||||||||||||||||||||||
89 | ||||||||||||||||||||||||||
90 | ||||||||||||||||||||||||||
91 | ||||||||||||||||||||||||||
92 | ||||||||||||||||||||||||||
93 | ||||||||||||||||||||||||||
94 | ||||||||||||||||||||||||||
95 | ||||||||||||||||||||||||||
96 | ||||||||||||||||||||||||||
97 | ||||||||||||||||||||||||||
98 | ||||||||||||||||||||||||||
99 | ||||||||||||||||||||||||||
100 | ||||||||||||||||||||||||||