DRYWALL SCOPE OF WORK
2
3
SCOPE CONTROL
4
Scope NumberDRY2601-DRY-A1-001-R00Revision0Scope StatusDraft
Approval Status
Not Submitted
5
6
Effective Date08/06/2026
7
8
9
10
11
12
PROJECT, CONTRACTOR, AND GOVERNING DOCUMENTS
13
ProjectExample Drywall Project
DRY-2601
Drywall Contractor
Example Drywall Contractor
LIC-EXAMPLE
14
15
16
17
Customer / General Contractor
Example Customer
Example General Contractor
Contract / Subcontract
C-2601 / SC-092900
18
19
Project Address
100 Example Interior Way
20
21
22
Governing Documents
Architectural A1.00-A9.50; RCP A6.00-A6.20; Wall Types A8.10; Spec 09 29 00
23
24
25
26
27
LIMITS OF WORK AND SCOPE SUMMARY
28
Limits of WorkInterior metal framing, gypsum board, insulation, finishing, access panels, protection, cleanup, and closeout for Level 1 East Wing.
29
30
31
32
33
34
ItemCategoryAssembly
Wall / Ceiling Type
DescriptionLocationResponsibilityIncludedExcludedQtyUnitStatus
35
36
37
38
39
40
41
42
43
RESPONSIBILITIES AND COORDINATION
44
Layout, Coordination, and Existing Conditions
Layout, control lines, field verification, coordination drawings, and existing-condition review are assigned in the detailed registers.
45
46
47
48
Framing, Backing, Board, Shaftwall, and Ceilings
Track studs, track, backing, gypsum board, shaftwall, ceilings, soffits, bulkheads, rated assemblies, and specialty conditions.
49
50
51
52
Insulation, Finishing, Access, and Temporary Conditions
Track insulation, acoustical treatments, finishing levels, texture, access requirements, lifts, temporary heat, lighting, power, and storage.
53
54
55
56
57
INSPECTIONS, CLOSEOUT, AND SCHEDULE
58
Testing, Inspections, Corrective Actions, and Acceptance
Track framing, above-ceiling, close-in, rated-assembly, finish, corrective-action, reinspection, and final-acceptance requirements.
59
60
61
62
Protection, Cleanup, Punch List, and Closeout
Track protection, cleanup, waste, punch list, record documents, warranties, attic stock, and final closeout.
63
64
65
66
Schedule and Milestones
Track mobilization, stocking, framing, board hanging, finishing, inspections, substantial completion, and final completion.
67
68
69
70
71
72
EXCLUSIONS, ALLOWANCES, AND UNIT PRICES
73
General and Trade-specific Exclusions
List general and trade-specific exclusions without hard-coding obligations not stated in the contract documents.
74
75
76
77
Allowances, Alternates, Unit Prices, and Work by Others
Track allowances, alternates, unit prices, owner-furnished items, contractor-furnished items, and work by others.
78
79
80
81
Scope Clarifications and Change Orders
Record clarifications, responses, change-order references, approval history, and distribution.
82
83
84
APPROVAL
85
86
Prepared ByReviewed ByApproved ByApproval Date
87
88
89
Drywall Contractor Acknowledgment
General Contractor Acknowledgment
Owner Acknowledgment
Distribution Date