Construction TaskBudgeted CostActual CostNotes
5
1Land Purchase (Include Closing Costs) $ -
6
2Closing Costs on Construction Loan (Contractor Provides Const Loan) $ -
7
3
Surveys: Initial, Septic/Well/House, Points for Footers/Walls, Foundation Location
$ 2,000.00
8
4Soil Analysis & Perc Holes (Include Equipment Costs) $ -
9
5Septic Engineering $ -
10
6Building Plans & Engineering $ 5,000.00
11
7SSWCA Road Impact Fee $ -
12
8County or HOA Road Impact Fee $ -
13
9Health Dept Fees $ -
14
10Building Inspection Fees $ 3,000.00 **
15
11Recording Fees at Courthouse $ -
16
12Water Test $ 300.00
17
13REC or SVEC Initial Fee $ -
18
14Power Line: M & L $ 5,000.00 **
19
15Water Tap Fee (SSWCA) $ -
20
16Water Line Installation (Community/Public Water) (M & L) $ 2,000.00 well line run from house to well pump, tie in both ends
21
17Well (Includes well pump, piping, accessories and labor to install) $ 3,000.00 Material and labor for well pump and install only - 860ft
22
18Septic Field: M & L $ - Done
23
19Top Soil Needed for Septic (# of Truck Loads) $ -
24
20Move In Fees (Large Equipment) $ -
25
21Lot Clearing, Burning Brush, Const Entrance $ -
26
22Sawman (Labor) $ -
27
23Build Driveway/Road: Culverts, Base Stone, Finish Stone $ -
28
24Dig Basement, Footers & Frost Footers $ - Footer dig - included in concrete amount
29
25Backfill Foundation & Porches (Specify Machine & Rate/Hr) $ -
30
26E&S: Seed/Straw/Hydroseed & Install Silt Fence as Needed
31
27Additional Fill Dirt (Specify why it is needed) $ -
32
28
Foundation: Footers + Walls + Retaining Walls & Porch/Deck Footings (M & L)
33
29Gravel for Basement, Garage & Draintile (M) $ -
34
30Draintile/Fabric Installation (M & L) + Equipment $ -
35
31Waterproofing Foundation (M&L) $ -
36
32
Plumbing Groundworks, Radon, Condensation Drain, Croc, Sump Pump (M & L)
$ -
37
33
Basement Slab/Garage Slab/Front Porch & Sidewalk to Garage Door (M & L)
$ 43,600.00 slab - $33,800 - Front and back porches $9800
38
34Shell (M and L) $ 84,250.00 Shell and interior framing - Material and labor
39
35Floor System (M) $ -
40
36Truss Package (M) $ -
41
37Deck Package (M) $ -
42
38Framing Labor & Crane Service $ -
43
39Windows (M) $ 5,200.00 8 Anderson 100 - 3x5s
44
40Exterior Doors (M) $ 4,000.00 budget for 2 doubles and 1 single
45
41Termite Pretreatment $ 400.00
46
42Roofing (M & L) $ - Included in shell
47
43Rough In Plumbing + Gas Line (M & L) $ 10,000.00 All plumbing start to finish - no fixtures, tubs, toilets
48
44
Rough In Plumbing Fixtures: Tubs/Diverters/Shower Surrounds/Shower Bases
$ 3,200.00 3 toilets - 2 bath tubs
49
45Rough In HVAC (M & L) $ 15,000.00 All hvac start to finish
50
46Rough In Electrical (M & L) $ 16,000.00 All electrical start to finish
51
47Gas Fireplace Rough In (M & L) $ -
52
48Gas Tank & Connections (Setting to Lease, Options to Buy/Bury) $ -
53
49Mantle/Fireplace Veneer (M&L) $ -
54
50Insulation Package (M & L) $ 9,000.00 1.5 inch of spray foam - 6 inch of r19 fiberglass
55
51Drywall (M) $ 8,000.00
56
52Drywall (L) $ 5,000.00
57
53Interior Trim Package + Closet Trim (M) $ 700.00 HO to do
58
54Interior Doors (M) $ 4,000.00 cloest double doors - bathroom and bedroom entry doors
59
55Interior Trim & Doors (L) $ 850.00 Install ext doors - HO to do interior
60
56Interior Stairs, Railings & Banisters (M) $ -
61
57Interior Painting, Stain/Poly Stairs & Prime Garage (M & L) $ 5,000.00 including paint
62
58Exterior Painting, Doors, Trim (M & L) $ -
63
59Exterior Siding Package & Accessories (M) $ -
64
60Exterior Siding & Trim Installation (L) $ -
65
61Porch Columns, Exterior PVC Trim & Plugs (M) $ -
66
62Garage Door + Motor (M & L) $ -
67
63Masonry Materials: Stone/Brick, Sand, Mortar, Etc (M) $ -
68
64Masonry (L) $ -
69
65Gutters & Downspouts (M & L) $ 2,500.00 gutters - install and material
70
66Light Fixtures, Ceiling Fans & Bulbs (M) $ 2,500.00 6 inch cut in lights - main --- 5 fans
71
67Kitchen Cabinets & Cabinet Trim (M) $ 5,000.00 HO to install
72
68Kitchen Countertops (M & L) $ 2,500.00 HO to install
73
69Bathroom Vanities (M) $ 2,500.00
74
70Bathroom Vanity Tops (M) $ -
75
71Cabinet Hardware (M) $ 400.00 HO to install
76
72Vanity Hardware (M) $ 200.00 HO to install
77
73Bathroom Hardware & Mirrors (TP Holder, Towel Racks, Towel Rings, Etc) $ 1,000.00 HO to install
78
74Exterior Door Knobs and Deadbolts (M) - Specify $ 600.00 HO to install
79
75Interior Door Knobs & Door Stops (M) - Specify $ 700.00 HO to install
80
76Tile Backsplash (M & L) $ -
81
77Floor Tile (M & L) $ -
82
78Shower Tile (All Materials & Labor) $ -
83
79Shower Door/Glass Surround (M & L) $ -
84
80LVT or Hardwood Flooring (M) - Avg $5.5 per sqft $ 1,400.00 Sealed slab - sealer material only
85
81LVT/Hardwood (L) - Avg of $2.75 per sqft $ 2,000.00 Clean and seal slab - Labor
86
82Carpet (M & L) $ -
87
83Appliances: Range/Oven/Cooktop, Hood Vent, Fridge, DW, Microwave, Garbage Disposal, Washer/Dryer, Etc (M) $ 5,000.00 Budgeted cost
88
84Labor to Install Appliances (Specify) Ho
89
85
Plumbing Fixtures: Faucets, Shower Trims & Shower Heads, Toilets & Utility Sinks
$ 2,500.00 all faucets - kitchen sink - all bathroom fixtures
90
86Plumbing Final Labor (M & L) $ 4,000.00
91
87HVAC Final (M & L) Usually is 25% of Total Invoice $ 2,500.00
92
88Electrical Final (M & L) Usually 25% of Total Invoice $ 2,000.00
93
89Final Grade of Property/Raking Yard (L) $ -
94
90Seed/Straw/Fertilizer/Erosion Mats (M & L) $ -
95
91Bury Downspouts (M & L) $ -
96
92Hydroseeding (M & L) AVG Cost Per Acre: $2800.00 $ -
97
93Gravel for Finish Driveway & Parking Area (M) $ -
98
94Misc Equipment Rentals $ -
99
95Misc Punchout Material (Interior & Exterior) $ -
100
96Pressure Wash House, Decks/Porches, Etc (M & L) $ -