TERRA_2017_Durum_wheat_campaign_schedule.xlsx
 Share
The version of the browser you are using is no longer supported. Please upgrade to a supported browser.Dismiss

 
View only
 
 
ABCDEFGHIJKLMNOPQRSTUVWXYZAA
1
Trait classDecJanFebMarApr
2
ActivityKey peoplePriorityPlots111825181522295121926512192629162330Comments
3
Field scans
4
3-D camera, full fieldLI, GSM, MN1AllxxxEntire field. For emergence, field soil variability, final plot.
5
3-D camera, swath over plotsLISM, MN1AllxxxxxxxxxxxSwath. Target 3X weekly. Suggest Sun-Mon, Tues-Wed, Thurs-Fri
6
Stereo-VIS + FLIR, 2 X weekly all plots
LI, RUESM, MN1AllxxxxxxxxxxxSwath. Target 2X weekly. Suggest Mon, Thurs
7
VNIRLI, RUESM, MN1AllxxxxxxxxxxSwath. Time close to UAV flights if possible
8
SWIRGSM, MN1AllxxxxxSwath. For changes in crop composition, water content
9
3-D camera diurnalLISM, JW17 linesxxxxxRequires forecast for 24 h of low wind conditions. No other scans that day. Nighttime are highest priority so could be 16:00 to 08:00. To provide a 30 s animation at 30 images per second would require 900 images, which is about an image every 1.6 minutes. Suggest at least four fixed
10
PS2RUESM1Unifxxx??????SM to coordinate with additional experts
11
12
UAV and tractor
13
Phoenix Drone ServiceLIRW, AF1AllxxxxxxxxxxxxFirst flight, Tues 10 Jan
14
Tractor w IRT, crop scan, height
LI, RUEPAS, JH2AllxxxxxxFirst tractor run, week of 16 Jan
15
Other UAVsLI, RUERW, AF1All??????????Should contact providers to assess interest
16
17
Manual or other
18
Emergence rateMN2
14 lines
xxxUsual marked x 2 reps?
19
Final emergenceLIMN, JW1AllxExact date depends on growth and field access
20
Leaf number (Zadoks/Haun)LIMN, JW1
10 lines
xxxxxxxx
21
TilleringLIMN, JW2
10 lines
xxxxx
22
JointingLI, RUEMN, JW2AllxxxxxxUntil jointing is complete in all lines
23
Heading/anthesisLI, RUEMN, JW1Allxxxxxx
24
Canopy coverLIJW2AllxxxWith A-frame
25
Canopy heightLI
MO, JW, MN
2xx
26
Light interceptionLIMO, MN2
10 lines
xxxxx
27
Light interception w cartLIPAS, JH2Allxxxxxxxxxx
28
Epicuticular waxes via wet labLIMN, JD, AT2AllCheck protocol prior to main sample. Leaf disks or segments or whole leaves?
29
SPADRUEMO, JW3Allxx
30
Leaf width/lengthLIMO, JW2xx
31
Leaf thicknessRUEJWW, MN2xxHand-held micrometer
32
Biomass subsamples over time
LI, GMO, MN1UnifxxxxxxLeaf area, fresh/dry weights from uniformity plots.
33
Biomass harvest w CarterGPAS, JH1Allx
34
Fresh weight of sub-samplesGRW1Allx
35
Dry weight of sub-samplesGMN1Allx
36
Final plant stand, plot lengthGJWW, MN1Allx
37
Post-harvest analysis for composition
GJWW, MN3AllxxxNeed to discuss grinding, etc.
38
39
Agronomy
40
Prepare fieldPAS, MO1Allx
41
Soil samplingPAS, MO1Based on Pedro's sampling strategy
42
FertilizersMO1AllxIncorporated 15 Dec.
43
Field planRW, JW1Allx
44
Calibrate planterJH, MN1Allx
45
Seed packaging1Allx
46
Install drip1Allx15/16 Dec. ?
47
Planting1AllxDecember 20 (seed depth ~3.2 cm)
48
Irrigation for emergencePAS, MN
49
Irrigation for salinity controlPAS, MO
50
Main drip irrigationPAS,
51
Generate field map from planter
JH, JW1Allx
52
In-season weed controlMO1AllxxxxxxxxxxxChemical and manual
53
In-season pest and disease control
MN1Allxxxxxxxxx
54
Clear field1AllxSatkes, any flags, etc.
55
Remove drip tape before sorghum
1Allx
56
Confirm genotypesRWAll
57
58
Tours, visitors, etc.
59
UK-US PhenomicsRW, JWx19-Jan
60
Tucson PHENOME meetingx(to be confirmed) Sunday 12 Feb at night suggested. David LeBauer to confirm
61
ALARC-MAC science field day
RW, PAS, JW
x18-Feb
62
UA-ALARC field phenomics WS13-16 Mar
63
Roberto TuberosaMN, RWx11/12 Jan (pending
64
Tino for trainingxx7.-9.2.2016  and  14-17.2. 2016 around the meeting in Tucson
65
Bob Strandx
66
Toddx
67
Danforth programmer (Cesar)When Tino is at Maricopa (see above)
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
Loading...
 
 
 
Field schedule
Logical framework