Project NameProject Ref #Assessment Date
4
Assessed ByNext AssessmentProject Start Date
5
Task/Activity/JobMobilizationTools/Equipment
6
7
8
S/#Task (in a logical sequence)Risk Identified & who might be affectedProbabilitySeverityRisk ScoreRisk RatingControls MeasuresResidual Risk
9
Existing ControlsRecommended Controls
10
1Leveling and compacting for site office area.Slip, trip, fall, working near the moving vehicles. Workers and other people can be harmed.339
Medium
1- Work area should be clear of obstructions. 2- Any spillage should be cleaned, and tidy. 3- All areas should be well illuminated. 4- Hidden hazards should be removed hidden under the soil. 5- Training shall be conducted on regular intervals. 6- STARRT card will be conducted before job starts.1. Free Task briefing shall be conducted and information will be delivered to all the involved people.3x1 = 3
11
2Portable Cabins TransporationVehicle accident due to blockage of access/exit point, workers can be hit, and equipment can be damaged.3412High1- Ensure the passage is open, and clear of all obstructions. 2- The one-way entry/exit method is adopted for vehicles entry and exist. 3- Pedestrians and vehicle passage is segregated. 4- Speed control signs are placed. 5- Workers are trained and monitored.Maximum 20km/h speed when driving onsite. Use of banksman when reversing the vehicle.2 x 2 = 4
12
3Lifting activity of the cabins, heavy loads and unloading.Fall of load, crane collapse, hit by lifting load can damage the equipment and harm worker.4416HighLifting equipment inspected & certification available. 2- Lift calculation should be available. 3- Trained operator should be available. 4- Place the vehicle on the firm and stable ground. 5- Tag Lines should be used. 6- Outriggers should be deployed before lifting. 7- The area should be barricaded. No standing under the lifted load.Ensure the workforce is competent, lift plan is prepared, emergency response plan is available onsite.2 x 2 = 4
13
4Electrical Appliances InstallationElectric Shock can result into injuries, skin burn, fatality as well as fire can ignited. Electrician and other workers can be harmed.3412High1- Use of 110V at worksite. 2- Ensure the GFCI and Circuit Brakers are used for protection. 3- Workers are trained and comptent technicians are being used for job. STAART shall be given to the workforce, and a competent electrical engineer will provide the guidance and monitor the job activity.2 x 2 = 4
14
5Fence InstallationManual handling, slip, trip, fall, can lead to injuries, and workers can be harmed.339
Medium
1- Ensure the workers are trained to perform the manual handling. 2- Workers are provided with the relevant PPEs.Ensure the workforce is given the details of the work, workers are given Red Man and Green Man training.2 x 2 = 4
15
16
Risk RatingSeveritProbabilitySeverity
17
123451UnlikelyFirst Aid
18
Probability (P)1123452RareRecordable/ Restricted Workday
19
22468103PossiblePermanent Disability/ LTI
20
336912154Likely Single Fatality
21
4481216205Very LikelyMultiple Fatalities
22
5510152025
23
24
25
26
27
28
29
Prepared ByApproved By
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101