SLAB DESIGN :-
Temp
2
3
(ONE WAY) Simply supported / Cantilever (Type S/C)
in ft.c
4
Short Span (Clear)
3.501.07m
5
Long Span (Clear)
4012.19m
6
Live Load on the Slab (LL)
2.50KN / sqm
7
Comp.stess of concrete M - 15 (fck)
15.00N / sqm
8
Tensile stress of steel (fy)
415.00N / sqm
9
Unit wt of concrete
25.00KN / cum
10
Unit wt of floor finish 50 mm
24.00KN / sqm
11
Clear concrete cover
15.00mm
12
Bearing of slab
150.00mm
13
Overall depth
35.56mm
14
Provide Overall depth
D125.00mm
15
Dia of bars for short direction
8.00mm
16
Dia of bars for long direction
8.00mm
17
Effective Depth
d106.00mm
18
Loading on the slab
19
Dead Load of the slab (DL)
3.13KN / sqm
20
Floor Finish1.20KN / sqm
21
Other Load0.20KN / sqm
22
Live Load on the slab
2.50KN / sqm
23
Total Load on the slab (TL)
7.03KN / sqm
24
Design Load = (Total Load x Load Factor i.e. 1.5)
10.54KN / sqm
25
Effective Span
lx1.17m
26
ly12.30m
27
Ratioly/lx10.486> 2
28
Effective Span =
1 + 0.15 =1.22m
29
30
Calculated BM at mid span of slab as follows;
31
For simply supported :-
32
Mu = (w x l2)/8 =
10.54 x 1.22 x 1.22 / 8 =
1.95KN-m/m
33
For Cantilever :-
34
Mu = (w x l2)/2 =
10.54 x 1.22 x 1.22 / 2 =
7.80KN-m/m
35
36
Effective depth of slab will now be fixed up on consideration of
37
of flexural strength as well as control of deflection.
38
Flexural strength consideration
39
Maximum BM =7.80KN-m/m
40
BM =
0.36 x fck x 0.48 (1-0.42 x 0.48) x 1000 d2 =
BM x 106N-mm/m
41
or
0.36 x 15 x 0.48 (1-0.42 x 0.48) x 1000 d2 =
7800923.052
42
ord =61mm
43
Adopt effective depth (d) =
96mm
44
Tension R/F for the positive BM along the short span is
45
BM =7.80
46
Ast =
BM / 0.87 x fy (1-0.42 x 0.48) x d
47
=1950231
/ 0.87 x 415 (1-0.42 x 0.48) x 96
48
=70.5mm2/m
8 mm dia 713 mm c/c
49
Control of deflection
50
Actual Span / effective depth ratio
=1217/96
51
=12.68
52
pt = 100 Ast/bd =
100 x 70.5 / 1000 x 61 =
0.07
53
From Modification curve, Modification factor =
2
54
Basic value of span / effective depth ratio =
7
55
Therefore permitted value of span / effective depth ratio =
7 x 2
56
=14
57
Actual S/d is <Permitted S/d
58
Hence effective depth "d" should be
OK
59
Try an effective depth "d" =
106mm
60
Tension R/F for short span +BM is given by =
61
0.87 x fy x Ast (d - fy x Ast / (fck x 1000))
=7.8 x 1000000
62
0.87 x 415 x 216.02 (106 - 415 x 216.02 / (15 x 1000))
=7800923.052
63
7801231OK7800923.052
64
Ast =216.02
65
Actual Span / effective depth ratio
=1217/106
66
=11.48
67
pt = 100 Ast/bd =
100 x 216.02 / 1000 x 106 =
0.204
68
From Modification curve, Modification factor =
1.6
69
Basic value of span / effective depth ratio =
7
70
Therefore permitted value of span / effective depth ratio =
7 x 1.6
71
=11.20
72
Actual S/d is >Permitted S/d
73
Hence effective depth "d" should be
increase
74
Adopt Overall thickness (D) =
125.00mm
75
Minimum R/F in slab =
0.12% of area of slab
76
=
0.12 x D x 1000 / 100
77
=150mm2/m
8 mm dia 335 mm c/c
78
79
Hence provide Main R/F Ast =
216.02mm2/m
80
i.e.8mm dia
8 mm dia 233 mm c/c
81
Maximum Spacing (3d or 450mm) =
318mm
82
83
Hence provide Distribution R/F Ast =
150mm2/m
84
i.e.8mm dia
8 mm dia 335 mm c/c
85
Maximum Spacing (5d or 450mm) =
450mm