1 | Project: Construction of Centralized Cooling System (CCS) for HDB in Tengah Park and Garden District | |||||||||||||||||||||||||
2 | Main Contractor: Bosh Engineering Pte Ltd | |||||||||||||||||||||||||
3 | Services: Electrical Works | |||||||||||||||||||||||||
4 | Package: Tengah Park C1, Garden C3 and Garden C7 | |||||||||||||||||||||||||
5 | Sub-Contract Ref. No.: | |||||||||||||||||||||||||
6 | Sub-Contractor's Work Scope Table | |||||||||||||||||||||||||
7 | ||||||||||||||||||||||||||
8 | DESCRIPTION | SUPPLY | INSTALLATION | TESTING & COMMISSIONING | ||||||||||||||||||||||
9 | 1 | Equipment and Material Handling | ||||||||||||||||||||||||
10 | 1.1 | Crane for Hoisting of CCS Plant Equipment (Chiller, Cooling Tower, Pumps, Water Tanks, Skids) to Roof Level | MAIN CON | SUBCON | N/A | |||||||||||||||||||||
11 | 1.2 | Hoisting of Pipe, Support Materials to Building Roof Top | SUBCON | SUBCON | N/A | |||||||||||||||||||||
12 | 1.3 | Lifting team including rigger, signalman, lifting supervisor and other necessary manpower for hoisting activity | SUBCON | SUBCON | N/A | |||||||||||||||||||||
13 | 1.4 | Space for temporary storage space at site only | MAIN CON | SUBCON | N/A | |||||||||||||||||||||
14 | 1.5 | DFMA workshop and prefebrication workshop space | SUBCON | SUBCON | N/A | |||||||||||||||||||||
15 | 1.6 | Temporary storage hoarding sheet, scaffolding pipes, fire extinguisher, etc. | SUBCON | SUBCON | N/A | |||||||||||||||||||||
16 | 1.7 | Unloading from truck/trailer, transporter and etc at job site and / or temporary storage area | SUBCON | SUBCON | N/A | |||||||||||||||||||||
17 | 1.8 | Transportation (Job site to erection point and temporary storage area to job site) | SUBCON | SUBCON | N/A | |||||||||||||||||||||
18 | 1.9 | Receiving and transportation of materials and equipment (Job site to erection point and temporary storage area to job site) | SUBCON | SUBCON | N/A | |||||||||||||||||||||
19 | 1.10 | Scaffolding, boom lifts, scissors lift, ladders, tools and machineries necessary of installation works (Complying to MOM and/or site rules and regulations) | SUBCON | SUBCON | N/A | |||||||||||||||||||||
20 | 1.11 | Calibrated testing instruments required for T&C for installed works on site | SUBCON | SUBCON | N/A | |||||||||||||||||||||
21 | 2 | Manpower | ||||||||||||||||||||||||
22 | 2.1 | Manpower for Material receiving, unpacking, storing, loading/unloading, transportation, installation, testing, commissioning, defect clearing, etc. | SUBCON | SUBCON | N/A | |||||||||||||||||||||
23 | 2.2 | Designated Site Supervisor (BCSS certified) to carry out site supervision and co-ordination on site, DFMA workshop and prefebrication workshop | SUBCON | SUBCON | N/A | |||||||||||||||||||||
24 | 2.4 | Site Supervisor to attend daily/ weekly/ monthly site meetings as required by Site Engineer | SUBCON | SUBCON | N/A | |||||||||||||||||||||
25 | 2.5 | Site Supervisor (BCSS certified) to play the role of Site Safety Supervisor to conduct and attend safety meetings and tool box meetings as required by Site Engineer | SUBCON | SUBCON | N/A | |||||||||||||||||||||
26 | 2.6 | Attend and undertake inspection as requested | SUBCON | SUBCON | N/A | |||||||||||||||||||||
27 | 2.7 | Verification and mark-up of as-built DWG. to required standards | SUBCON | SUBCON | N/A | |||||||||||||||||||||
28 | 3 | Electrical Works | ||||||||||||||||||||||||
29 | 3.1 | Distribution Boards, MCC, VSD for CCS Equipment | MAIN CON | SUBCON | SUBCON | |||||||||||||||||||||
30 | 3.2 | Hot-Dip Galvanised Support Frame, Brackets for Distribution Boards, MCC for CCS Equipment | SUBCON | SUBCON | SUBCON | |||||||||||||||||||||
31 | 3.3 | SCADA System | MAIN CON | SUBCON | SUBCON | |||||||||||||||||||||
32 | 3.4 | LCP, Junction Box (Communication Panel) for SCADA | MAIN CON | SUBCON | SUBCON | |||||||||||||||||||||
33 | 3.5 | Switch socket outlets, isolators and junction boxes | MAIN CON | SUBCON | SUBCON | |||||||||||||||||||||
34 | 3.6 | Paints, marking templates, legend plates, rubber mat etc. | SUBCON | SUBCON | SUBCON | |||||||||||||||||||||
35 | 3.7 | Fire stop for openings c/w QP certification | SUBCON | SUBCON | SUBCON | |||||||||||||||||||||
36 | 3.8 | Licensed Electrical Worker (LEW) for Power Turn-on (1 time only) | MAIN CON | SUBCON | SUBCON | |||||||||||||||||||||
37 | 3.9 | All other installations per drawings provided | SUBCON | SUBCON | SUBCON | |||||||||||||||||||||
38 | 3.10 | All other necessary tests before and during Testing and Commissioning | SUBCON | SUBCON | SUBCON | |||||||||||||||||||||
39 | 4 | Cabling Works | ||||||||||||||||||||||||
40 | 4.1 | All power sub-main cables | MAIN CON | SUBCON | SUBCON | |||||||||||||||||||||
41 | 4.2 | All control cables | MAIN CON | SUBCON | SUBCON | |||||||||||||||||||||
42 | 4.3 | Cable gland & lug, shroud, terminal, cable tie, sleeves, labeling, and all necessary accessories for installation and termination | SUBCON | SUBCON | SUBCON | |||||||||||||||||||||
43 | 4.4 | Termination of cables | SUBCON | SUBCON | SUBCON | |||||||||||||||||||||
44 | 4.5 | Cable positioning inside tray and cable securing using cable tie | SUBCON | SUBCON | N/A | |||||||||||||||||||||
45 | 4.6 | Removal of cable drums | SUBCON | SUBCON | N/A | |||||||||||||||||||||
46 | 5 | Earthing & Lightning | ||||||||||||||||||||||||
47 | 5.1 | Earthing & lightning material (earth bar, earth pit, down conductor, copper tape, cable, etc.) | MAIN CON | SUBCON | SUBCON | |||||||||||||||||||||
48 | 5.2 | Cable gland & lug, shroud, terminal, cable tie, sleeves, labeling, and all necessary accessories for installation and termination | SUBCON | SUBCON | SUBCON | |||||||||||||||||||||
49 | 5.3 | Termination of cables | SUBCON | SUBCON | SUBCON | |||||||||||||||||||||
50 | 5.4 | Material for bonding of CCS equipment to HDB lightning protection system | MAIN CON | SUBCON | SUBCON | |||||||||||||||||||||
51 | 5.5 | All necessary accessories for installation work | SUBCON | SUBCON | SUBCON | |||||||||||||||||||||
52 | 6 | Cable Support System | ||||||||||||||||||||||||
53 | 6.1 | Cable tray, ladder, trunking (as per given quantity. if need more, subcon need to buy) | MAIN CON | SUBCON | SUBCON | |||||||||||||||||||||
54 | 6.2 | Steel class 4 conduit, flexible conduit, conduit boxes and accessories (as per given quantity. if need more, subcon need to buy) | SUBCON | SUBCON | SUBCON | |||||||||||||||||||||
55 | 6.3 | Channels, unistrut, brackets, threaded rod, fasteners and all necessary accessories for installation | SUBCON | SUBCON | SUBCON | |||||||||||||||||||||
56 | 6.4 | Cable support positioning and installation using necessary accessories | SUBCON | SUBCON | SUBCON | |||||||||||||||||||||
57 | 6.5 | Anchor bolts (as per given quantity. if need more, subcon need to buy) | SUBCON | SUBCON | SUBCON | |||||||||||||||||||||
58 | 6.6 | Anchor bolts pull out test | SUBCON | SUBCON | SUBCON | |||||||||||||||||||||
59 | 6.7 | Anchor bolts torque test | SUBCON | SUBCON | SUBCON | |||||||||||||||||||||
60 | ||||||||||||||||||||||||||
61 | Notes: | |||||||||||||||||||||||||
62 | 1 | To review and ensure the cable containment sizes shown in the given drawings are adequate and to include any upsizing if required. | ||||||||||||||||||||||||
63 | 2 | To include installation of wall and floor mounted shock isolators c/w mounting accessories. | ||||||||||||||||||||||||
64 | 3 | Bracket sizes shown in the given drawings are subjected to QP’s calculation and approval. Sizes may subject to changes. | ||||||||||||||||||||||||
65 | 4 | Installation details in given drawings are for reference only, details may subject to changes after SP acceptance. | ||||||||||||||||||||||||
66 | 5 | To provide your own calibrated testing instruments, e.g. Multi-meter, Insulation tester, etc. | ||||||||||||||||||||||||
67 | 6 | To conduct all necessary tests by your own manpower, e.g. continuity test, Insulation test, initial run equipments, T&C, etc. | ||||||||||||||||||||||||
68 | ||||||||||||||||||||||||||
69 | ||||||||||||||||||||||||||
70 | ||||||||||||||||||||||||||
71 | ||||||||||||||||||||||||||
72 | ||||||||||||||||||||||||||
73 | ||||||||||||||||||||||||||
74 | ||||||||||||||||||||||||||
75 | ||||||||||||||||||||||||||
76 | ||||||||||||||||||||||||||
77 | ||||||||||||||||||||||||||
78 | ||||||||||||||||||||||||||
79 | ||||||||||||||||||||||||||
80 | ||||||||||||||||||||||||||
81 | ||||||||||||||||||||||||||
82 | ||||||||||||||||||||||||||
83 | ||||||||||||||||||||||||||
84 | ||||||||||||||||||||||||||
85 | ||||||||||||||||||||||||||
86 | ||||||||||||||||||||||||||
87 | ||||||||||||||||||||||||||
88 | ||||||||||||||||||||||||||
89 | ||||||||||||||||||||||||||
90 | ||||||||||||||||||||||||||
91 | ||||||||||||||||||||||||||
92 | ||||||||||||||||||||||||||
93 | ||||||||||||||||||||||||||
94 | ||||||||||||||||||||||||||
95 | ||||||||||||||||||||||||||
96 | ||||||||||||||||||||||||||
97 | ||||||||||||||||||||||||||
98 | ||||||||||||||||||||||||||
99 | ||||||||||||||||||||||||||
100 | ||||||||||||||||||||||||||