Checklist for BOM Finalization
2
3
Project Name:
4
DC KW:
5
AC KW:
6
7
#TopicQuestionYes/ NoRemarks
8
1Solar PanelsWhich Solar Panels have you finalized? Brand and Wattage
9
Is it possible that these panels make and/or wattage will be changed mid project?
10
2Solar InverterIs the AC capacity of the plant finalized?
11
If multiple building rooftops are to be installed, is building wise AC capacity finalized?
12
3DC CablesHow much 4 sqmm and 6 sqmm cables is estimated?
13
Are Y connectors to be used? If Yes, How many qty?
14
If Y connectors are used, have you used DC cable of appropriate size?
15
4Structurefor fabrication structure, what is estimate of pipes?
16
for Aluminium rails, what is the length of the rail required? What is the qty of end clamp and mid clamps?
17
5ACDBwill MCB or isolator box be required for solar inverter? This is required when main ACDB and inverter are far apart.
18
Are the MCB/MCCB ratings appropriately chosen?
19
Is the ACDB equiped with CT and meter compartment? If not, have you added new meter box as separate BOM item?
20
6Earthing PitsFinalize which earthing rods to be used and qty.
21
Finalize which earthing strip/cable to be used for structure earthing and inverter earthing
22
Finalize which LA to be used.
23
Finalize LA cable to be used.
24
7AC CablesFinalize AC cable sizes and length
25
If AC cable size is finalized, ask ACDB manufacture to make appropriate hole in the panel.
26
8Lugs & GlandsDecide on lug size and material (Aluminium, copper or bi-metallic) and qty.
27
9ConduitsAre the conduit size appropriately used? Are the elbow and tee of same size as conduit size?
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100