3 | Ref. No.: GPL F HS 02 | Date: | 10/20/2020 | |||||||||||||||||||||||
4 | Rev.No.: 00 | Page no. | 01 of 01 | GPL/HIRA/16 | ||||||||||||||||||||||
5 | Hazard Identification & Risk Assessment Format | |||||||||||||||||||||||||
6 | Activity: Erection Of Batching Plant | |||||||||||||||||||||||||
7 | Sr. No. | Activity | Hazard | Issues (Internal/External) | Risk ( Probable Outcome) | Existing Control | Legal Yes/No | Risk Assessment existing Control Measures | Significant (S) / Non-Significant (NS) | Additional Control Measure | Risk Assessment additional Control Measures | Ref. Of WI/ SOP :- | Opportunities & Action | Remark | ||||||||||||
8 | Probability(P) | Severity(S) | Risk Level (H/M/L) : | Probability(P) | Severity(S) | Risk Level (H/M/L) : | ||||||||||||||||||||
9 | 1 | ERECTION OF BATCHING PLANT | Unauthorised Operator | Internal | Serious Injury | Only authorised person allow for operation and working in Erection activity | YES | P2 | S3 | M | S | Tool Box talk Should Be Conducted Before Start The Work/Activity. Provide Hard Barrication Surrounding Area & Restric Person Inside The barrication. | P2 | S3 | M | Nil | ||||||||||
10 | Follow the permit to work system | |||||||||||||||||||||||||
11 | ||||||||||||||||||||||||||
12 | Hit by load | Internal | Serious Injury/Fatality | Provide tagline for balancing job. | P4 | S3 | H | Experienced rigger will only be permitted. | P3 | S3 | M | Nil | ||||||||||||||
13 | Working without mandatory PPE's | Internal | Serious Injury | Provide Adequate PPE'S to workmen. Like Safety Shoe, Reflective Jacket,Safety Helmet,Eye Goggle, Anticut Hand Gloves,Nose Mask etc. | P3 | S2 | M | Tool Box talk Should Be Conducted Before Start The Work/Activity & Educate Them The Importance Of PPE'S. | P2 | S2 | Nil | |||||||||||||||
14 | Overhead Electrical lines | Internal | Serious Injury | One full time security provide to watch the same thing | P4 | S4 | H | Ensure Activity Should Be Carried In Day Light Only. Work Permit Should Be Taken Before Starting The Work/Activity. | P2 | S4 | M | Nil | ||||||||||||||
15 | ||||||||||||||||||||||||||
16 | Tools tackles without mandatory documents | Internal | Serious Injury | All Mandetory Documents Has Been Check Like PUC, License, Insurance etc. | P3 | S3 | H | Check Tools & Tackel Are In Good Working Condotion | P1 | S3 | L | Nil | ||||||||||||||
17 | Lifting without load calculation | Internal | Serious Injury | Check SWL Before Starting The Activity. | P3 | S3 | H | Tool Box talk Should Be Conductet Before Start The Work/Activity. The Activity Is In Under Close & Continues Supervission. | P2 | S3 | L | Nil | ||||||||||||||
18 | Obstruction in Swing Area | Internal | Serious Injury | 1) Area Barricate & Only authorised person allow for Opration. 2) Providing Clerence Space Inbetn. Crane & Object. | P3 | S3 | H | Activity Should taken in Under Close & Continuous Supervission | P2 | S3 | M | Nil | ||||||||||||||
19 | Installation Of crane by unskilled person | Internal | Serious Injury | Ensure Crane installation should carried out under contineous supervision and by experienced, trained manpower. | P3 | S4 | H | Only Experience Riger Are Allow to Performing Work. | P1 | S4 | L | Nil | ||||||||||||||
20 | Obstuction In Lifting area | Internal | Topple of crane | Before taking a permit area incharge should check all these things | P3 | S4 | H | Tool Box talk Should Be Conductet Before Start The Work/Activity. The Activity Is In Under Close & Continues Supervission. | P1 | S4 | L | Nil | ||||||||||||||
21 | Improper soil compaction | Internal | Toople of crane | Before Starting Activity compaction should be done | P3 | S3 | H | Physically Check The Area By Component Person | P1 | S3 | L | Nil | ||||||||||||||
22 | Bad Condition of Wooden Block Use | Internal | Toople of crane | Proper Inspection done before Installation | P2 | S2 | M | Physically Check The Blocks By Component Person | P2 | S2 | L | Nil | ||||||||||||||
23 | Bad Condition Of Tool & Tackles | Internal | Material fall Down | Proper Inspection done before Starting of Work Activity. | P3 | S4 | H | Physically Check The Condition Of Tools & Tackels By Component Person | P2 | S4 | M | Nil | ||||||||||||||
24 | Failuer of Limit Switch | Internal | Material fall Down/ Unbalanced | Proper Inspection done before Starting of Work Activity. | P2 | S3 | M | Physically Check The Condition Of Tools & Tackels By Component Person | P2 | S3 | L | Nil | ||||||||||||||
25 | ||||||||||||||||||||||||||
26 | ||||||||||||||||||||||||||
27 | RISK Calculation / Evaluatio | |||||||||||||||||||||||||
28 | Probability (P) | P/S | S1 | S2 | S3 | S4 | ||||||||||||||||||||
29 | P1: Improbable | P1 | L | L | M | M | ||||||||||||||||||||
30 | P2 : Remote | P2 | L | M | M | H | ||||||||||||||||||||
31 | P3 : Possible | P3 | M | M | H | H | ||||||||||||||||||||
32 | P4 : Probable | P4 | M | H | H | H | ||||||||||||||||||||
33 | ||||||||||||||||||||||||||
34 | Severity (s) | A : Hazards must be avoided (or the level of risk reduced significantly and reliable by controls) | ||||||||||||||||||||||||
35 | S1 : Negligible | B : Hazards should be avoided (or the level of risk reduced significantly and reliable by controls) | ||||||||||||||||||||||||
36 | S2 : Minor | C : Risk to be controlled as far as reasonably practicable | ||||||||||||||||||||||||
37 | S3 : Sever | D : Risk is controlled as far as reasonably practicable . | ||||||||||||||||||||||||
38 | S4 : Extreme | -- : Acceptable risk | ||||||||||||||||||||||||
39 | LEGAL : If activity come under legal implecation (significant) than additional control measures is to be taken and has to be reviewed periodically. | |||||||||||||||||||||||||
40 | S : Significant | |||||||||||||||||||||||||
41 | NS : Non - Significant. | |||||||||||||||||||||||||
42 | ||||||||||||||||||||||||||
43 | ||||||||||||||||||||||||||
44 | ||||||||||||||||||||||||||
45 | ||||||||||||||||||||||||||
46 | ||||||||||||||||||||||||||
47 | ||||||||||||||||||||||||||
48 | ||||||||||||||||||||||||||
49 | ||||||||||||||||||||||||||
50 | ||||||||||||||||||||||||||
51 | ||||||||||||||||||||||||||
52 | ||||||||||||||||||||||||||
53 | ||||||||||||||||||||||||||
54 | ||||||||||||||||||||||||||
55 | ||||||||||||||||||||||||||
56 | ||||||||||||||||||||||||||
57 | ||||||||||||||||||||||||||
58 | ||||||||||||||||||||||||||
59 | ||||||||||||||||||||||||||
60 | ||||||||||||||||||||||||||
61 | ||||||||||||||||||||||||||
62 | ||||||||||||||||||||||||||
63 | ||||||||||||||||||||||||||
64 | ||||||||||||||||||||||||||
65 | ||||||||||||||||||||||||||
66 | ||||||||||||||||||||||||||
67 | ||||||||||||||||||||||||||
68 | ||||||||||||||||||||||||||
69 | ||||||||||||||||||||||||||
70 | ||||||||||||||||||||||||||
71 | ||||||||||||||||||||||||||
72 | ||||||||||||||||||||||||||
73 | ||||||||||||||||||||||||||
74 | ||||||||||||||||||||||||||
75 | ||||||||||||||||||||||||||
76 | ||||||||||||||||||||||||||
77 | ||||||||||||||||||||||||||
78 | ||||||||||||||||||||||||||
79 | ||||||||||||||||||||||||||
80 | ||||||||||||||||||||||||||
81 | ||||||||||||||||||||||||||
82 | ||||||||||||||||||||||||||
83 | ||||||||||||||||||||||||||
84 | ||||||||||||||||||||||||||
85 | ||||||||||||||||||||||||||
86 | ||||||||||||||||||||||||||
87 | ||||||||||||||||||||||||||
88 | ||||||||||||||||||||||||||
89 | ||||||||||||||||||||||||||
90 | ||||||||||||||||||||||||||
91 | ||||||||||||||||||||||||||
92 | ||||||||||||||||||||||||||
93 | ||||||||||||||||||||||||||
94 | ||||||||||||||||||||||||||
95 | ||||||||||||||||||||||||||
96 | ||||||||||||||||||||||||||
97 | ||||||||||||||||||||||||||
98 | ||||||||||||||||||||||||||
99 | ||||||||||||||||||||||||||
100 | ||||||||||||||||||||||||||