TECHNICAL QUALIFICATION OVERVIEW
3
RFQ RefName of Prospective Bidder
4
5
Technical Criteria Statement
6
4.2.1State which Technical Criterion (4.2.1 (a), (b) or (c)) the Prospective Bidder aims to qualify under:
7
For each power plantPower plant 1:Power plant 2:Add further columns as necessary
8
Name of Anchor Sponsor
9
Name of power plant SPV
10
Brief description of ownership structure of SPV (attach chart if necessary)
11
4.2.2 (b) State whether the power plant is in operation or in development
12
4.2.2 (d) Capacity of power plant ( in MWac for solar photovoltaic and wind power plants)
13
4.2.2 (e) Relevant Percentage
14
4.2.2 (f)Relevant Period (clearly identifying start and end dates)
15
4.2.3 (a)(i) name of power plant
16
(ii) location (municipality, region and Country)
17
(iii) description, including technology and nameplate generating capacity
18
(iv) direct or indirect shareholding held for the relevant period (state percentage and describe shareholding structure)
19
4.2.3 (b)(i) commercial operations date
20
(ii) average availability through the Relevant Period (as stipulated in section 4.2.2 (f) of the RFQ)
21
(iii) description, including technology and nameplate generating capacity
22
4.2.3 (c)(i) financial close date
23
(ii) construction start date
24
(iii) status of construction
25
Availability evidence
26
4.2.3 (d)Type of documentation submitted as evidence of availability. Select one of the following options:

(A) a technical report issued by lenders’ engineer or another reputable and independent engineering firm:

(B) a series of detailed monthly operations and maintenance reports setting out the plant availability for the Relevant Period.
27
Document reference for availability report.
28
Page reference(s) for basis of availability calculations (including confirmation that the calculations are based on review of plant genertion data and cover the Relevant Period in full).
29
Shareholding evidence
30
4.2.3 (d)Confirm extracts from the relevant Anchor Sponsor’s audited financial statements covering the relevant portion of the Relevant Period showing such direct or indirect shareholding have been provided.
31
Period covered by audited financial statements provided
32
Document reference(s) for shareholding evidence
33
Achieving financial close (for power plants in development)
34
4.2.3 (d)A copy of a notice from lenders that all conditions precedent to the initial disbursement of funds have been satisfied or waived
35
Starting construction (for power plants in development)
36
4.2.3 (d)A copy of a full notice to proceed to an EPC Contractor responsible for engineering, procurement, and construction of substantially all of the works that make up the power plant
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100