A | B | C | D | E | F | G | |
---|---|---|---|---|---|---|---|
1 | ID | Bldg Code | Bldg Number | Name | Changes | Explanation of Changes | Date of Building List Update |
2 | 444 | RES1 | 142 | RESIDENCE ONE (RES1) (TEMP NAMING) | New building added. | New residence hall building added under construction status. | 4/5/2024 |
3 | 443 | MAIN | 239 | OLD MAIN (MAIN) | 3505 increase in GSF, 469 decrease in ASF | Previously unidentified shaft and tower spaces added to correct true GSF of facility, including addition of 1BM, 04, 05, 06, 07 floors to cover the towers of facility. | 4/5/2024 |
4 | 442 | REC | 384 | STUDENT RECREATION CENTER (REC) | 749 increase in GSF, 464 increase in ASF | Racquetball conversion project and corrections to GSF on floor 01 | 4/5/2024 |
5 | 441 | STNE | 608E | STEARNS TOWERS EAST (STNE) | 1472 increase in ASF | Lounge/study area on floor 01 correctly updated to Assignable space. | 4/5/2024 |
6 | 440 | 721EMRY | 808 | GUARDIAN STORAGE LONGMONT (721EMRY) | Building ASF and GSF added at 820 SF | Data for leased space added in system. | 4/5/2024 |
7 | 439 | FS6 | 136B | FACULTY STAFF COURT 6 (FS6) | Building status changed from ACTIVE to DEMOLISHED | Building removed to make way for new residence hall | 12/21/2023 |
8 | 438 | CAS1 | 256A | CAS SHED (CAS1) | Building status changed from ACTIVE to DEMOLISHED | Building removed to make way for conference center hotel and garage | 12/21/2023 |
9 | 437 | FS3 | 136D | FACULTY STAFF COURT 3 (FS3) | Building status changed from ACTIVE to DEMOLISHED | Building removed to make way for new residence hall | 12/21/2023 |
10 | 436 | FS5 | 136A | FACULTY STAFF COURT 5 (FS5) | Building status changed from ACTIVE to DEMOLISHED | Building removed to make way for new residence hall | 12/21/2023 |
11 | 435 | FS7 | 136C | FACULTY STAFF COURT 7 (FS7) | Building status changed from ACTIVE to DEMOLISHED | Building removed to make way for new residence hall | 12/21/2023 |
12 | 434 | LTRN | 033C | LATRINE (LTRN) | Building status changed from ACTIVE to INACTIVE | Building has not been in use for quite some time in remote campus area | 12/21/2023 |
13 | 433 | PFDC | 257 | PAGE FOUNDATION CENTER (PFDC) | Functional Status changed from OTHER to GENERAL FUND, Recharge perecent changed from 100 to 0 | Changed to a Facilities Management General Fund building for FY24 | 12/21/2023 |
14 | 432 | PPCB | 546 | POTTS/PRENTUP CONCESSIONS BUILDING (PPCB) | GSF set at 3966, ASF set to 1691 | Building drawings added while under construction status | 12/21/2023 |
15 | 431 | TB87 | 134 | FAMILY HOUSING EXPANSION (134) (TB87) | Building status changed from ACTIVE to DEMOLISHED | Building removed to make way for new residence hall | 12/21/2023 |
16 | 430 | 3100ARP | 807 | PARK PLACE (3100ARP) | 3853 increase in GSF, 3567 increase in ASF | CU Leasing additional space in building | 10/10/2023 |
17 | 429 | AERO | 587 | AEROSPACE ENGINEERING SCIENCES (AERO) | Recharge % changed from 0 to 100 | 10/10/2023 | |
18 | 428 | ATHN | 131 | ATHENS NORTH COURT (ATHN) | 854 increase in GSF | Floor 04 added for previously unidentified mechanical space and walkway | 10/10/2023 |
19 | 427 | BIOT | 530 | JENNIE SMOLY CARUTHERS BIOTECHNOLOGY BUILDING (BIOT) | 275 decrease in GSF, 448 decrease in ASF | Floor plan fixes to not include area well on southside of B wing on 1B in GSF, and Mech space correctly identified on 1B | 10/10/2023 |
20 | 426 | C4C | 302 | CENTER FOR COMMUNITY (C4C) | 405 increase in GSF | GSF line on 04 corrected | 10/10/2023 |
21 | 425 | CASE | 209 | CENTER FOR ACADEMIC SUCCESS AND ENGAGEMENT (CASE) | Recharge % changed from 100 to 0 | 10/10/2023 | |
22 | 424 | CHEY | 326 | CHEYENNE ARAPAHO HALL (CHEY) | 1666 increase in GSF | GSF expanded to correctly include exterior covered space on the north side of the building | 10/10/2023 |
23 | 423 | GASR | 494 | GAS REGULATOR BUILDING (GASR) | Functional Status changed from GENERAL FUND to AUXILIARY | Correction in data | 10/10/2023 |
24 | 422 | AERO | 587 | AEROSPACE ENGINEERING SCIENCES (AERO) | Recharge % changed from 0 to 100. | AERO is not a FM general fund building, but a general fund building from the campus funding standpoint and will have a “customer” speedtype for all O&M services. | 7/5/2023 |
25 | 421 | C4C | 302 | CENTER FOR COMMUNITY (C4C) | 56 decrease in GSF, 1262 decrease in ASF | Drawing updates from a renovation and space type updates. | 7/5/2023 |
26 | 420 | CASE | 209 | CENTER FOR ACADEMIC SUCCESS AND ENGAGEMENT (CASE) | Functional status changed from AUXILIARY to GENERAL FUND, Recharge % changed from 100 to 0. | CASE became a General Fund Building effective 7/1/2023 | 7/5/2023 |
27 | 419 | EDEP | 427 | EAST DISTRICT ENERGY PLANT (EDEP) | 879 increase in GSF, 436 increase in ASF | Drawing updates from a renovation. | 7/5/2023 |
28 | 418 | MBE | 405 | OFELIA MIRAMONTES AND LEONARD BACA EDUCATION BUILDING (MBE) | Building name and code changed (previously was FLEMING BUILDING (FLMG)), 1108 increase in GSF, 1240 decrease in ASF | Initial drawing updates from renovation in building and Regents approved renaming | 7/5/2023 |
29 | 417 | WVRC | 607 | WILLIAMS VILLAGE RECREATION CENTER (WVRC) | 509 increase in ASF | Restroom audit on campus classified some restrooms in building as not public restrooms but as athletic or physical education service | 3/20/2023 |
30 | 416 | WARD | 324 | WARDENBURG STUDENT HEALTH CENTER (WARD) | 380 increase in ASF | Restroom audit on campus classified some restrooms in building as not public restrooms but as treatment/examination clinic service | 3/20/2023 |
31 | 415 | TB87 | 134 | FAMILY HOUSING EXPANSION (134) (TB87) | 46 increase in ASF | Restroom audit on campus classified some restrooms in building as not public restrooms but as residential ones | 3/20/2023 |
32 | 414 | TB78 | 278 | TEMPORARY BUILDING 78 (TB78) | 64 decrease in ASF | Crawl space correctly identified on floor 1B as Nonassignable space | 3/20/2023 |
33 | 413 | STAD | 378 | STADIUM BUILDING (STAD) | 2052 decrease in ASF | Corridors on 1B were previously incorrectly listed as assignable spaces | 3/20/2023 |
34 | 412 | SLKR | 547 | SOCCER LOCKER ROOM (SLKR) | 315 increase in ASF | Restroom audit on campus classified some restrooms in building as not public restrooms but as athletic or physical education service | 3/20/2023 |
35 | 411 | REC | 384 | STUDENT RECREATION CENTER (REC) | 3859 increase in ASF | Restroom audit on campus classified some restrooms in building as not public restrooms but as athletic or physical education service | 3/20/2023 |
36 | 410 | PRL3 | 096 | 4845 PEARL EAST CIRCLE (PRL3) | 379 increase in ASF | Space data updates in building after plans added | 3/20/2023 |
37 | 409 | MCFL | 032 | MOORES COLLINS FAMILY LODGE (MCFL) | 389 increase in ASF | Restroom audit on campus classified some restrooms in building as not public restrooms but as residential ones | 3/20/2023 |
38 | 408 | LBB | 217 | LUCILE BERKELEY BUCHANAN BUILDING (LBB) | 681 decrease in ASF | Space data updates in building after recent renovations | 3/20/2023 |
39 | 407 | KCEN | 406 | KITTREDGE CENTRAL (KCEN) | 854 increase in ASF | Restroom audit on campus classified some restrooms in building as not public restrooms but as residential ones | 3/20/2023 |
40 | 406 | HLET | 330 | HALLETT HALL (HLET) | 5148 increase in GSF | Determined that some of these previously unnumbered spaces should be included in the GSF on floor 04 as they're above 3' high | 3/20/2023 |
41 | 405 | ECNT | 441 | ENGINEERING NORTH TOWER (ECNT) | 229 increase in ASF | Space data updates in building after recent renovations | 3/20/2023 |
42 | 404 | DALW | 389 | DAL WARD ATHLETIC CENTER (DALW) | 2072 increase in ASF | Restroom audit on campus classified some restrooms in building as not public restrooms but as athletic or physical education service | 3/20/2023 |
43 | 403 | CHMP | 388 | UCHEALTH CHAMPIONS CENTER (CHMP) | 2993 increase in ASF | Restroom audit on campus classified some restrooms in building as not public restrooms but as athletic or physical education service | 3/20/2023 |
44 | 402 | 5425AIR | 804 | 5425 AIRPORT ROAD (5425AIR) | 669 increase in GSF | GSF previously incorrect, was only including location SF | 3/20/2023 |
45 | 401 | 3100ARP | 807 | PARK PLACE (3100ARP) | 1225 increase in GSF, 1128 increase in ASF | CU leasing more space in building | 3/20/2023 |
46 | 400 | 2705CLR | 465 | 2705 COLORADO | 149 increase in ASF | Restroom audit on campus classified some restrooms in building as not public restrooms but as residential ones | 3/20/2023 |
47 | 399 | 122126TH | 456 | 1221 26TH STREET | 374 increase in ASF | Restroom audit on campus classified some restrooms in building as not public restrooms but as residential ones | 3/20/2023 |
48 | 398 | WVC | 604 | WILLIAMS VILLAGE DINING AND COMMUNITY COMMONS (WVC) | 920 increase in ASF | Space previously listed as nonassignable public corridor on 02 is now accurately labeled as food facility | 12/8/2022 |
49 | 397 | WDEP | 354 | WEST DISTRICT ENERGY PLANT (WDEP) | 4244 decrease in GSF | Open to Below/Vertical Penetration spaces correctly added to floor 01 creating reduction in GSF | 12/8/2022 |
50 | 396 | WALN | 583 | WALNUT DISTRIBUTION CENTER (WALN) | 63679 increase in ASF | Space being leased in facility by Rudi's Deli has been added to the system, was not previously included on our plans (GSF was) | 12/8/2022 |
51 | 395 | STAD | 378 | STADIUM BUILDING (STAD) | 729 decrease in GSF, 2043 increase in ASF | plans updated to correct difference between stadium and sky box(378E) and location type updates according to campus space survey | 12/8/2022 |
52 | 394 | SEEL | 591 | SUSTAINABILTY ENERGY AND ENVIRONMENT LABORATORY (SEEL) | 1843 increase in GSF | renovation on floor 01 along with location type updates according to space survey on 03 | 12/8/2022 |
53 | 393 | REC | 384 | STUDENT RECREATION CENTER (REC) | 2562 decrease in ASF | corridor space updated on 02 and couple of location type updates on 01 and 1B | 12/8/2022 |
54 | 392 | PRL3 | 096 | 4845 PEARL EAST CIRCLE (PRL3) | GSF added at 14565, ASF added at 10825 | Official Building Floorplans created and added in system | 12/8/2022 |
55 | 391 | PPCB | 546 | POTTS/PRENTUP CONCESSIONS BUILDING (PPCB) | New building added. | Building added in system for construction of concessions building on East Campus | 12/8/2022 |
56 | 390 | MUS | 334 | IMIG MUSIC BUILDING (MUS) | 835 decrease in ASF | corridor space updated on 01 where conference room was that had been removed in renovation project | 12/8/2022 |
57 | 389 | MUEN | 373S | MUENZINGER PSYCHOLOGY & NUEROSCIENCE BUILDING (MUEN) | Building name change from Muenzinger Psychology and Biopsychology to Muenzinger Psychology and Neuroscience | Name change requested by College of Arts and Sciences | 12/8/2022 |
58 | 388 | MRCTA | 150A | MARINE COURT A (MRCTA) | 559 increase in GSF, 469 increase in ASF | in order to accommodate the entirety of the elevator room 06 the GSF line was enlarged (and the GSF is now properly located per FICM standards | 12/8/2022 |
59 | 387 | MCKY | 243 | MACKY AUDITORIUM (MCKY) | 746 increase in GSF, 915 decrease in ASF | Mechanical space correctly identified on 3B, open to below spaces updated correctly on 03 for GSF change | 12/8/2022 |
60 | 386 | LBB | 217 | LUCILE BERKELEY BUCHANAN BUILDING (LBB) | Status changed from CONSTRUCTION to OPEN | Building opened after renovation summer 2022 | 12/8/2022 |
61 | 385 | JILA | 355 | JILA (JILA) | 2335 decrease in ASF | Nonassignable spaces on 02 correctly identified in database | 12/8/2022 |
62 | 384 | IBS | 264 | INSTITUTE OF BEHAVIORAL SCIENCE (IBS) | 2048 increase in GSF | Floor 01 was updated to account for exterior covered spaces as well as the inclusion of a large shaft space | 12/8/2022 |
63 | 383 | GCOT | 280 | THE GRANDVIEW COTTAGE (GCOT) | Building name and code change from Temporary Building 97 (TB97) to The Grandview Cottage (GCOT) | Name change requested by College of Arts and Sciences | 12/8/2022 |
64 | 382 | ECST | 433 | ENGINEERING SOUTH TOWER (ECST) | 368 increase in ASF | Corridor space on 03 now correctly identified as Lab space | 12/8/2022 |
65 | 381 | ECNW | 442 | ENGINEERING CENTER NORTH WING (ECNW) | 2739 decrease in ASF, Status changed from CONSTRUCTION to OPEN | ECNT/ECNW renovations completed in 2022 | 12/8/2022 |
66 | 380 | ECNT | 441 | ENGINEERING NORTH TOWER (ECNT) | 1522 increase in GSF, Status changed from CONSTRUCTION to OPEN | ECNT/ECNW renovations completed in 2022 | 12/8/2022 |
67 | 379 | CCHG | 277 | LIMELIGHT CONFERENCE CENTER & HOTEL GARAGE (CCHG) | New building added. | Building added in system for construction of Conference Center/Hotel in Grandview | 12/8/2022 |
68 | 378 | CCH | 255 | LIMELIGHT CONFERENCE CENTER & HOTEL (CCH) | New building added. | Building added in system for construction of Conference Center/Hotel in Grandview | 12/8/2022 |
69 | 377 | BIOT | 530 | JENNIE SMOLY CARUTHERS BIOTECHNOLOGY BUILDING (BIOT) | 2351 decrease in ASF | Nonassignable spaces correctly identified on 1B and 01 according to campus space survey | 12/8/2022 |
70 | 376 | AERO | 587 | AEROSPACE ENGINEERING SCIENCES (AERO) | 1831 decrease in ASF | Space on 01 previously listed as service space now correctly indicated as mechanical/nonassignable | 12/8/2022 |
71 | 375 | 721EMRY | 808 | GUARDIAN STORAGE LONGMONT (721EMRY) | New building added. | Building added in system for storage units leased by a department | 12/8/2022 |
72 | 374 | 5425AIR | 804 | 5425 AIRPORT ROAD (5425AIR) | GSF added at 6962, ASF added at 5776 | Official Building Floorplans created and added in system | 12/8/2022 |
73 | 373 | 3100ARP | 807 | PARK PLACE (3100ARP) | GSF added at 9944, ASF added at 9232 | Official Building Floorplans created and added in system | 12/8/2022 |
74 | 372 | 2595CNYN | 806 | 2595 CANYON BLVD (2595CNYN) | GSF added at 1277, ASF added at 1111 | Official Building Floorplans created and added in system | 12/8/2022 |
75 | 371 | 190926 | 802 | 1909 26TH ST (190926) | GSF added at 5951, ASF added at 3782 | Official Building Floorplans created and added in system | 12/8/2022 |
76 | 370 | 1522BRD | 272 | 1522 BROADWAY (1522BRD) | 178 decrease in ASF | location types updated based on field verification of spaces | 12/8/2022 |
77 | 369 | 1506BRD | 271 | 1506 BROADWAY (1506BRD) | 968 decrease in ASF | location types updated based on field verification of spaces | 12/8/2022 |
78 | 368 | 1301WA | 801 | 1301 WALNUT ST (1301WA) | GSF added at 4226, ASF added at 3623 | Official Building Floorplans created and added in system | 12/8/2022 |
79 | 367 | 1135BRD | 213 | 1135 BROADWAY (1135BRD) | 582 increase in ASF | location types updated on 01 according to campus space survey | 12/8/2022 |
80 | 366 | 1221PENN | 803 | 1221 PENNSYLVANIA AVENUE (1221PENN) | Building set to inactive, discontinued lease of space | Discontinued lease of space March 2021 | 6/6/2022 |
81 | 365 | WVC | 604 | WILLIAMS VILLAGE DINING AND COMMUNITY COMMONS (WVC) | 3097 increase in ASF | Assignable SF totals correctly allocated | 6/6/2022 |
82 | 364 | SEEL | 591 | SUSTAINABILTY ENERGY AND ENVIRONMENT LABORATORY (SEEL) | 1378 increase in GSF | GSF increased due to project | 6/6/2022 |
83 | 363 | RAMY | 370 | RAMALEY BIOLOGY BUILDING (RAMY) | 1860 increase in GSF | GSF line fixes for accuracy | 6/6/2022 |
84 | 362 | NTCT2A | 1702A | NEWTON COURT 2A (NTCT2A) | 293 decrease in GSF | Uncovered stair area removed from GSF | 6/6/2022 |
85 | 361 | MSSC | 573 | MARINE STREET SCIENCE CENTER (RL6) (MSSC) | 1329 decrease in GSF | NE corner had extra GSF included that is already with building 575 | 6/6/2022 |
86 | 360 | MRCTK | 150K | MARINE COURT K (MRCTK) | 1113 increase in GSF | GSF increased to include covered corridors and stairways not previously captured | 6/6/2022 |
87 | 359 | MRCTJ | 150J | MARINE COURT J (MRCTJ) | 1231 increase in GSF | GSF increased to include covered corridors and stairways not previously captured | 6/6/2022 |
88 | 358 | MRCTH | 150H | MARINE COURT H (MRCTH) | 881 increase in GSF | GSF increased to include covered corridors and stairways not previously captured | 6/6/2022 |
89 | 357 | MRCTG | 150G | MARINE COURT G (MRCTG) | 1231 increase in GSF | GSF increased to include covered corridors and stairways not previously captured | 6/6/2022 |
90 | 356 | MRCTB | 150B | MARINE COURT B (MRCTB) | 839 increase in GSF | GSF increased to include covered corridors and stairways not previously captured | 6/6/2022 |
91 | 355 | LIBR | 245 | NORLIN LIBRARY (LIBR) | 12417 increase in GSF, 7704 increase in ASF | Mechanical Space and unfinished area on 1M now correctly included in GSF | 6/6/2022 |
92 | 354 | IPRC | 379 | INDOOR PRACTICE FACILITY (IPRC) | 17618 increase in GSF, 9456 increase in ASF | Open to Below in 2B parking removed from ramp area that was previously incorrectly being subtracted from GSF area | 6/6/2022 |
93 | 353 | HSSC | 575 | HOUSING SYSTEM SERVICE CENTER (HSSC) | 1019 increase in GSF | Covered exterior spaces now correctly added in GSF | 6/6/2022 |
94 | 352 | EMGBA | 499A | EAST MAIN GROUNDS BUILDING A (EMGBA) | 266 increase in ASF | Room properly classified as assignable (storage) | 6/6/2022 |
95 | 351 | DUAN | 359 | DUANE PHYSICS (DUAN) | 3325 decrease in GSF | Database previously inaccurately totalling GSF for building | 6/6/2022 |
96 | 350 | DHLL | 030 | DINING HALL (DHLL) | 142 decrease in GSF | Building Renovation and Floor Plan Updates | 6/6/2022 |
97 | 349 | CAS1 | 256A | CAS SHED (CAS1) | 66 increase in ASF | Room properly classified as assignable (storage) | 6/6/2022 |
98 | 348 | ATCTC1 | 144C1 | ATHENS COURT C1 (ATCTC1) | 1428 increase in GSF | Two covered covered corridors correctly added to GSF on floor 02 | 6/6/2022 |
99 | 347 | ATCTB3 | 144B3 | ATHENS COURT B3 (ATCTB3) | 1429 increase in GSF | Two covered covered corridors correctly added to GSF on floor 02 | 6/6/2022 |
100 | 346 | ATCTB2 | 144B2 | ATHENS COURT B2 (ATCTB2) | 1429 increase in GSF | Two covered covered corridors correctly added to GSF on floor 02 | 6/6/2022 |