1 | Panchayat-wise developmental works carried-out or in progress in the District during last 2 Years | |||||||||||||||||||||||||
2 | Name of the Panchayat : Fraw Haknar - A | |||||||||||||||||||||||||
3 | Rs in lakhs | |||||||||||||||||||||||||
4 | S.No | Name of Panchayat | Department | Sector | Name of the Work | Year of Start | Approved Cost | Funds released as on date | Expenditure as on 15-10-2022 | Present Physical Status | ||||||||||||||||
5 | ||||||||||||||||||||||||||
6 | 1 | FROW HAKNAR A | RDD | MGNREGA | Constt. of Footapth from from L/o L/o Gh Hassan awan to L/o Ali Jan Khatana at Fraw Haknar-A | 2020-2021 | 1.8557 | 1.8557 | 1.8465 | Completed | ||||||||||||||||
7 | 2 | FROW HAKNAR A | RDD | MGNREGA | Construction of footpath from Shop of Gh Mohd Kumar to H/o Gh Rasool Bhat and others at Frow-A | 2020-2021 | 1.4315 | 1.4315 | 0.9147 | Completed | ||||||||||||||||
8 | 3 | FROW HAKNAR A | RDD | MGNREGA | CONSTT OF FOOT PATH WITH Z KHULL FROM L/O GH AHMAD GANIE TO POWER CANAL AT FRAW A | 2020-2021 | 1.7814 | 1.7814 | 1.6012 | Completed | ||||||||||||||||
9 | 4 | FROW HAKNAR A | RDD | MGNREGA | Constt. r-wall near Aganwadi Centre wani Mohalla at Fraw Haknar-A | 2020-2021 | 1.7629 | 1.7629 | 1.5334 | Completed | ||||||||||||||||
10 | 5 | FROW HAKNAR A | RDD | MGNREGA | Constt of Zkull/R/wall from H/O Farooq Ahmad to L/o Nazir Ahmad Ganie at Fraw A | 2020-2021 | 1.9299 | 1.9299 | 1.9086 | Completed | ||||||||||||||||
11 | 6 | FROW HAKNAR A | RDD | MGNREGA | Constt of zkull from l/o mohd sultan mir to l/o sonaulah bhat at fraw haknar A | 2020-2021 | 1.9997 | 1.9997 | 1.9793 | Completed | ||||||||||||||||
12 | 7 | FROW HAKNAR A | RDD | MGNREGA | Constt of F/path from R& b road to H/o Nazir ahmad Paswal at Fraw A | 2020-2021 | 1.8727 | 1.8727 | 1.8818 | Completed | ||||||||||||||||
13 | 8 | FROW HAKNAR A | RDD | MGNREGA | Constt. of Z-khull from L/o Manzoor Ahmad Mir to onwards at frow haknar-A | 2020-2021 | 1.9991 | 1.9991 | 1.9966 | Completed | ||||||||||||||||
14 | 9 | FROW HAKNAR A | RDD | MGNREGA | Constt of Zkull from H/o Nazir ah Ganie to L/o Mohd Ramzan Kumar at Farw Haknar A | 2020-2021 | 2.2816 | 2.2816 | 2.2432 | Completed | ||||||||||||||||
15 | 10 | FROW HAKNAR A | RDD | MGNREGA | Constt of Zkull from birendari to l/o Rafiq ahmad paswal at Fraw Haknar A | 2020-2021 | 2.3972 | 2.3972 | 2.3607 | Completed | ||||||||||||||||
16 | 11 | FROW HAKNAR A | RDD | MGNREGA | Constt of F/path with R/wall from H/o Gh Mohd Ganie to H/o Farooq Ah & others at Fraw Haknar A | 2020-2021 | 1.4076 | 1.4076 | 1.3393 | Completed | ||||||||||||||||
17 | 12 | FROW HAKNAR A | RDD | MGNREGA | Constt of F/path R/Wall from bridge to R& B road at Farw Haknar A | 2020-2021 | 1.6213 | 1.6213 | 0.7307 | Completed | ||||||||||||||||
18 | 13 | FROW HAKNAR A | RDD | MGNREGA | Constt of F/path from spring to H/o Showkat ah paswal at Frawhaknar A | 2020-2021 | 1.9005 | 1.9005 | 1.8417 | Completed | ||||||||||||||||
19 | 14 | FROW HAKNAR A | RDD | MGNREGA | Construction of Footpath with R-wall from H/o Ab Hamid Wani to Bridge at frow Haknar-A | 2020-2021 | 1.7776 | 1.7776 | 1.32 | Completed | ||||||||||||||||
20 | 15 | FROW HAKNAR A | RDD | MGNREGA | Constt. of footpath from L/o Mushtaq ahmad Bhat to Graveyard at Fraw Haknar-A | 2020-2021 | 2.3731 | 2.3731 | 2.1529 | Completed | ||||||||||||||||
21 | 16 | FROW HAKNAR A | RDD | MGNREGA | Constt. of Z khul with R wall from L/o Sonaullah Bhat to L/o Ab Rashid Bhat Ward 7 | 2021-22 | 1.0044 | 0.9946 | 0.9946 | In progress | ||||||||||||||||
22 | 17 | FROW HAKNAR A | RDD | MGNREGA | Renovation of spring and Zkull with R/wall from L/o Farooq Paswal to L/o Ab Aziz Bhat ward no 7 | 2021-237 | 1.4565 | 1.4494 | 1.4494 | Completed | ||||||||||||||||
23 | 18 | FROW HAKNAR A | RDD | MGNREGA | Constt of Zkull from L/o Mohd Sultan Mir to sonaullah Bhat at Fraw Haknar A | 2021-238 | 1.4278 | 1.4258 | 1.4258 | Completed | ||||||||||||||||
24 | 19 | FROW HAKNAR A | RDD | MGNREGA | Constt of Drain from NHW to L/o Gh Hasan Kasana and others at Fraw Haknar A | 2021-239 | 1.09 | 1.0807 | 1.0807 | Completed | ||||||||||||||||
25 | 20 | FROW HAKNAR A | RDD | MGNREGA | Constt of F/path from Nazir ahmad Bhat to shop of Bashir ahmad wani at Fraw A | 2021-240 | 1.4977 | 1.4916 | 1.4916 | Completed | ||||||||||||||||
26 | 21 | FROW HAKNAR A | RDD | MGNREGA | Constt of Zkull from L/o Shafeeq Ah Ganie to H/o Majeed Ganie at Fraw A | 2021-241 | 1.266 | 1.2451 | 1.2451 | Completed | ||||||||||||||||
27 | 22 | FROW HAKNAR A | RDD | MGNREGA | Construction of PMAY-G House for Individuals -PMAY-G REG. NO. JK138363287 | 2021-22 | 0.2033 | 0.0749 | 0.0749 | In progress | ||||||||||||||||
28 | 23 | FROW HAKNAR A | RDD | MGNREGA | Construction of PMAY-G House for Individuals -PMAY-G REG. NO. JK138410334 | 2021-22 | 0.2033 | 0.0499 | 0.0499 | In progress | ||||||||||||||||
29 | 24 | FROW HAKNAR A | RDD | MGNREGA | Construction of PMAY-G House for Individuals -PMAY-G REG. NO. JK138437172 | 2021-22 | 0.2033 | 0.0749 | 0.0749 | In progress | ||||||||||||||||
30 | 25 | FROW HAKNAR A | RDD | MGNREGA | Construction of PMAY-G House for Individuals -PMAY-G REG. NO. JK139776391 | 2021-22 | 0.2033 | 0.0499 | 0.0499 | In progress | ||||||||||||||||
31 | 26 | FROW HAKNAR A | RDD | MGNREGA | Construction of PMAY-G House for Individuals -PMAY-G REG. NO. JK139776402 | 2021-22 | 0.2033 | 0.1339 | 0.1339 | In progress | ||||||||||||||||
32 | 27 | FROW HAKNAR A | RDD | MGNREGA | Construction of PMAY-G House for Individuals -PMAY-G REG. NO. JK142870043 | 2021-22 | 0.2033 | 0.0499 | 0.0499 | In progress | ||||||||||||||||
33 | 28 | FROW HAKNAR A | RDD | MGNREGA | Constt of Zkull from from L/o Nazir ahmad Ganie to NHW at Ward No 3 Frawhaknar A | 2021-248 | 1.5229 | 1.5196 | 1.5196 | Completed | ||||||||||||||||
34 | 29 | FROW HAKNAR A | RDD | MGNREGA | Constt of Drain F/path from graveyard to l/o Ab Gani Ganie at Frawhaknar A | 2021-249 | 1.6024 | 1.5995 | 1.5995 | Completed | ||||||||||||||||
35 | 30 | FROW HAKNAR A | RDD | MGNREGA | Constt Of inner F/path at Fraw Haknar A | 2021-250 | 1.242 | 1.2405 | 1.2405 | Completed | ||||||||||||||||
36 | 31 | FROW HAKNAR A | RDD | MGNREGA | Constt of Drain from to H/o Gulab Din paswal to power canal ward no 6 at Fraw Haknar A | 2021-22 | 1.9503 | 1.9227 | 1.9227 | In progress | ||||||||||||||||
37 | 32 | FROW HAKNAR A | RDD | MGNREGA | Constt of F/path with R/wall from l/o gafoor awan to R and B Road at Fraw Haknar A ward No 7 | 2021-252 | 1.9654 | 1.9638 | 1.9638 | Completed | ||||||||||||||||
38 | 33 | FROW HAKNAR A | RDD | MGNREGA | Constt of F/path R/wall from farooq ahmad ganie to Fayaz ahmad ganie at ward no 1 Fraw A | 2021-253 | 1.3929 | 1.392 | 1.392 | Completed | ||||||||||||||||
39 | 34 | FROW HAKNAR A | RDD | MGNREGA | Imp of L/Road from G/road to power canal at fraw Haknar A | 2021-254 | 2.8884 | 2.885 | 2.885 | Completed | ||||||||||||||||
40 | 35 | FROW HAKNAR A | RDD | MGNREGA | Constt of F/path with drain from H/o Manzoor ahmad Ganie to H/o Ab ahad Bhat at Fraw A | 2021-255 | 1.4297 | 1.4243 | 1.4243 | Completed | ||||||||||||||||
41 | 36 | FROW HAKNAR A | RDD | MGNREGA | Constt of F/path from H/o Showkat Paswal to yaseen paswal at ward no 6 | 2021-256 | 1.4891 | 1.3144 | 1.3144 | Completed | ||||||||||||||||
42 | 37 | FROW HAKNAR A | RDD | MGNREGA | Constt of Zkull with R/wall R/wall from H/o Shabir Ahmad Baba to L/o Ab Salam Ganie at Fraw Haknar A | 2021-257 | 1.7738 | 1.7734 | 1.7734 | Completed | ||||||||||||||||
43 | 38 | FROW HAKNAR A | RDD | MGNREGA | Constt of F/path Zkull from L/o Mohd Sultan Mir to L/o Nazir ahmad shah at ward no 3 | 2021-258 | 1.4709 | 1.464 | 1.464 | Completed | ||||||||||||||||
44 | 39 | FROW HAKNAR A | RDD | MGNREGA | Constt of Zkull from L/o bashir ah mir to l/o manzoor ah mir ph 2nd at Fraw A | 2021-259 | 1.385 | 1.3817 | 1.3817 | Completed | ||||||||||||||||
45 | 40 | FROW HAKNAR A | RDD | MGNREGA | Constt of Zkull with R/wall from L/o Gh Hasan mir to R and B Road at Fraw Haknar A | 2021-260 | 1.4747 | 1.4726 | 1.4726 | Completed | ||||||||||||||||
46 | 41 | FROW HAKNAR A | RDD | MGNREGA | Construction of PMAY-G House for Individuals -PMAY-G REG. NO. JK138351986 | 2021-22 | 0.2033 | 0.0749 | 0.0749 | In progress | ||||||||||||||||
47 | 42 | FROW HAKNAR A | RDD | MGNREGA | Constt of F/path r/wall b/s from water tankey to h/o ab aziz khatana at Fraw A | 2021-262 | 1.9161 | 1.9089 | 1.9089 | Completed | ||||||||||||||||
48 | 43 | FROW HAKNAR A | RDD | MGNREGA | Constt of Zkull from H/o Farooq Paswal to L/o Zubair Famda at Fraw Haknar A | 2022-2023 | 1.4796 | 1.4796 | 0.4245 | In progress | ||||||||||||||||
49 | 44 | FROW HAKNAR A | RDD | MGNREGA | Constt of F/path R/wall from L/o Gh Ahmad Ganie to Power Canal at Fraw Haknar A | 2022-2023 | 1.9861 | 1.9861 | 1.2485 | In progress | ||||||||||||||||
50 | 45 | FROW HAKNAR A | RDD | MGNREGA | Constt of F/path from l/o Ab Rashid Khatana to L/o Bashir Ahmad mir at Fraw A | 2022-2023 | 1.9716 | 1.9716 | 0.8898 | In progress | ||||||||||||||||
51 | 46 | FROW HAKNAR A | RDD | MGNREGA | Constt of F/path from R and B Road to onwards at Fraw Haknar A | 2022-2023 | 1.4776 | 1.4776 | 0.9648 | In progress | ||||||||||||||||
52 | 47 | FROW HAKNAR A | RDD | MGNREGA | Constt of F/path from Nllah to H/o Ab Aziz Khatana at Fraw Haknar A | 2022-2023 | 1.9956 | 1.9956 | 0.715 | In progress | ||||||||||||||||
53 | 48 | FROW HAKNAR A | RDD | MGNREGA | Constt of F/path R/wall from R&B Road to H/o Nazir Ahmad Kumar at Fraw Haknar A | 2022-2023 | 1.9532 | 1.9532 | 0.6197 | In progress | ||||||||||||||||
54 | 49 | FROW HAKNAR A | RDD | MGNREGA | Constt Of Zkull At Fraw Haknar A | 2022-2023 | 1.9495 | 1.9495 | 0.7627 | In progress | ||||||||||||||||
55 | 50 | FROW HAKNAR A | RDD | MGNREGA | CONSTT OF Z KHULL FROM H/O MOHD SUBHAN KUMAR TO L/O GH RASOOL CHOPAN AT FRAW A | 2022-2023 | 0.8946 | 0.8946 | 0.2724 | In progress | ||||||||||||||||
56 | 51 | FROW HAKNAR A | RDD | MGNREGA | Constt of F/path With R/wall Graveyard to G/road at Ward No 1at Fraw Haknar A | 2022-2023 | 1.9646 | 1.9646 | 0.7627 | In progress | ||||||||||||||||
57 | 52 | FROW HAKNAR A | RDD | PMAY G (non Secc) | AB AZIZ AWAN | 2021-22 | 1.3 | 1.00 | 1.0 | In progress | ||||||||||||||||
58 | 53 | FROW HAKNAR A | RDD | PMAY G (non Secc) | MUSTAFA FAMDA | 2021-22 | 1.3 | 1.00 | 1.0 | In progress | ||||||||||||||||
59 | 54 | FROW HAKNAR A | RDD | PMAY G (non Secc) | ZUBAIR KASANA | 2021-22 | 1.3 | 1.00 | 1.0 | In progress | ||||||||||||||||
60 | 55 | FROW HAKNAR A | RDD | PMAY G (non Secc) | Mohd Yaseen Shumangi | 2021-22 | 1.3 | 1.00 | 1.0 | In progress | ||||||||||||||||
61 | 56 | FROW HAKNAR A | RDD | PMAY G (non Secc) | FAREED AHMAD FAMDA | 2021-22 | 1.3 | 1.00 | 1.0 | In progress | ||||||||||||||||
62 | 57 | FROW HAKNAR A | RDD | PMAY G (non Secc) | Riyaz Ahmad Bijran | 2021-22 | 1.3 | 0.50 | 0.5 | In progress | ||||||||||||||||
63 | 58 | FROW HAKNAR A | RDD | PMAY G (non Secc) | Gulam Hassan kasana | 2021-22 | 1.3 | 0.50 | 0.5 | In progress | ||||||||||||||||
64 | 59 | FROW HAKNAR A | RDD | PMAY G (non Secc) | Imtiyaz Ahmad Khatana | 2021-22 | 1.3 | 1.00 | 1.0 | In progress | ||||||||||||||||
65 | 60 | FROW HAKNAR A | RDD | PMAY G (non Secc) | MUSHTAQ AHMAD KASANA | 2021-22 | 1.3 | 0.50 | 0.5 | In progress | ||||||||||||||||
66 | 61 | FROW HAKNAR A | RDD | PMAY G (non Secc) | FAREED AHMAD KASANA | 2021-22 | 1.3 | 1.00 | 1.0 | In progress | ||||||||||||||||
67 | 62 | FROW HAKNAR A | RDD | PMAY G (non Secc) | FAREED AHMAD PASWAL | 2021-22 | 1.3 | 1.00 | 1.0 | In progress | ||||||||||||||||
68 | 63 | FROW HAKNAR A | RDD | PMAY G (non Secc) | GJ NABI KALAS | 2021-22 | 1.3 | 1.00 | 1.0 | In progress | ||||||||||||||||
69 | 64 | FROW HAKNAR A | RDD | PMAY G (non Secc) | METHA KHATANA | 2021-22 | 1.3 | 1.00 | 1.0 | In progress | ||||||||||||||||
70 | 65 | FROW HAKNAR A | RDD | PMAY G (non Secc) | SHOWKAT AHMAD KALAS | 2021-22 | 1.3 | 1.00 | 1.0 | In progress | ||||||||||||||||
71 | 66 | FROW HAKNAR A | RDD | PMAY G (non Secc) | BASHIR AHMAD MIR | 2021-22 | 1.3 | 1.00 | 1.0 | In progress | ||||||||||||||||
72 | 67 | FROW HAKNAR A | RDD | PMAY G (non Secc) | SHABIR AHMAD MIR | 2021-22 | 1.3 | 1.00 | 1.0 | In progress | ||||||||||||||||
73 | 68 | FROW HAKNAR A | RDD | PMAY G (non Secc) | GH HASSAN CHOPAN | 2021-22 | 1.3 | 0.50 | 0.5 | In progress | ||||||||||||||||
74 | 69 | FROW HAKNAR A | RDD | PMAY G (non Secc) | Showket Ahmad Lone | 2021-22 | 1.3 | 0.50 | 0.5 | In progress | ||||||||||||||||
75 | 70 | FROW HAKNAR A | RDD | PMAY G (non Secc) | AB AZIZ MALIK | 2021-22 | 1.3 | 0.50 | 0.5 | In progress | ||||||||||||||||
76 | 71 | FROW HAKNAR A | RDD | PMAY G (non Secc) | REYAZ AHMAD GANIE | 2021-22 | 1.3 | 0.50 | 0.5 | In progress | ||||||||||||||||
77 | 72 | Fraw Haknar-A | RDD | ADP 2021-22 BDC Grants | Renovation Of Panchayat Ghar Fraw A | 2021-22 | 1.50 | 1.5 | 1.50 | Completed | ||||||||||||||||
78 | 73 | Fraw Haknar-A | RDD | ADP 2021-22 BDC Grants | Construction Of P Wall From L/O Ishtyaq Shah To Nallah Sindh At Fraw Haknar A | 2021-22 | 2.00 | 2 | 1.80 | Completed | ||||||||||||||||
79 | 74 | Fraw haknar A | RDD | ADP 2021-22 PRI Grants | Constt of concrete wall from Graveyard to H/O Fareed Kasana at ward no 6 | 2021-22 | 2.29 | 2.29 | 2.18 | Completed | ||||||||||||||||
80 | 75 | Fraw Haknar A | RDD | ADP 2022-23 DDC Grants | Construction of footpath with R/W from Power Canal to House of Abdul Majeed Khan and others | 2022-23 | 3.00 | 1.500 | Completed | |||||||||||||||||
81 | 76 | Fraw Haknar A | RDD | ADP 2022-23 PRI Grants | Fencing of graveyard near Jamia Masjid Shareef at Fraw Phase 2 Fraw Haknar A | 2022-23 | 12.00 | 6.000 | 0.00 | In progress | ||||||||||||||||
82 | 77 | Fraw A | RDD | UPD( cd & pyt) | Const. Of drain f rom NHW to Gh. Hussain Kasana and others at Fraw A. | 2021-22 | 1.98 | 2.500 | 1.875 | Completed | ||||||||||||||||
83 | 78 | Fraw Haknar | Agriculture | PMKSY | Const. of WHP | 2020-21 | 1.8 | 1.8 | 1.79 | completed | ||||||||||||||||
84 | 79 | Fraw A | Education | District Sector | Construction of Truss / renovation of 03 Roomed building of MS Fraw | 2022 | 20.88 | 4.00 | 4.00 | In progress | ||||||||||||||||
85 | 80 | Fraw | YSS | UT | Earth Filling , Leveling & Rolling MS Fraw | 2022-23 | 8.00 | 4.00 | 0.00 | In progress | ||||||||||||||||
86 | 81 | Fraw Haknar-A | RDD | 14th FC | Construction of Z-khull from H/o Gh Mohd Mir to H/o Mohd Maqbool Baba at fraw Haknar-A | 2020-21 | 1.19 | 1.17 | 1.17 | Completed | ||||||||||||||||
87 | 82 | Fraw Haknar-A | RDD | 14th FC | Construction of Footpath with Z-khull from H/o Mohd Gojar Kalas to onwards at Fraw Haknar-A | 2020-21 | 1.30 | 1.21 | 1.21 | Completed | ||||||||||||||||
88 | 83 | Fraw Haknar-A | RDD | 14th FC | Construction of Z-khull from old M/S to H/o Ab Hameed wani at fraw Haknar-A | 2020-21 | 1.00 | 0.91 | 0.91 | Completed | ||||||||||||||||
89 | 84 | Fraw Haknar-A | RDD | 14th FC | Construction of Z-khull from H/o Mohd Sultan Mir to H/o Ab Aziz Kumar at ward no.4 Fraw Haknar-A | 2020-21 | 1.20 | 1.10 | 1.10 | Completed | ||||||||||||||||
90 | 85 | Fraw Haknar-A | RDD | 14th FC | Constt. Of Road from H/o Nazir ahmad Mir to R&B Road at Fraw haknar-A | 2020-21 | 2.30 | 2.30 | 2.30 | Completed | ||||||||||||||||
91 | 86 | Fraw Haknar-A | RDD | 14th FC | Construction of lane/drain from Jamia Masjid to L/o Gh Mohd Shah at fraw Haknar-A | 2020-21 | 1.25 | 1.25 | 1.25 | Completed | ||||||||||||||||
92 | 87 | Fraw Haknar-A | RDD | 14th FC | Constt of foot culvert on escape nallah phase 2 at Fraw A | 2020-21 | 0.50 | 0.45 | 0.45 | Completed | ||||||||||||||||
93 | 88 | Fraw Haknar-A | RDD | 14th FC | Construction of Z-khull from National Highway to Panchayat Ghar Via L/o Mushtaq Ahmad Shah PH-I | 2020-21 | 1.20 | 1.01 | 1.01 | Completed | ||||||||||||||||
94 | 89 | Fraw Haknar-A | RDD | 14th FC | Constt of culvert on escape nallah phase 2 | 2020-21 | 1.55 | 1.55 | 1.55 | Completed | ||||||||||||||||
95 | 90 | Fraw Haknar-A | RDD | 14th FC | Constt of culvert on escape nallah fraw phase 1 | 2020-21 | 0.60 | 0.60 | 0.60 | Completed | ||||||||||||||||
96 | 91 | Fraw Haknar-A | RDD | 14th FC | Constt of Z khul from main road to L/o sonaullah Bhat at Fraw | 2020-21 | 0.60 | 0.59 | 0.59 | Completed | ||||||||||||||||
97 | 92 | Fraw Haknar-A | RDD | 14th FC | Constt of culvert on escape nallah phase 1 | 2020-21 | 1.40 | 1.40 | 1.40 | Completed | ||||||||||||||||
98 | 93 | Fraw Haknar-A | RDD | 14th FC | constt of chain link fencing of graveyard at Ganie Mohalla Fraw Haknar A | 2020-21 | 2.50 | 2.50 | 2.50 | Completed | ||||||||||||||||
99 | 94 | Fraw -A | R&B | C&T | Improvement/Upgradation of Haknar link road Gund b.w.o P/L 75mm thick compacted wet mix macada, 50mm thick bituminous macadam in Patches/stretches, 25mm thick semi dense with 6mm thick seal coat. (MMLWP) | 2021-22 | 32.4 | 32.40 | 30.47 | Completed | ||||||||||||||||
100 | 95 | Fraw Haknar A | KPDCL | PRI | Installation of electric wires /poles at Fraw haknar A | 2021 | 5.50 | 5.50 | 5.415 | Completed | ||||||||||||||||