A | B | C | D | E | |
---|---|---|---|---|---|
3 | Define Problem - Design Brief | ||||
4 | |||||
5 | 3 | 2 | 1 | 0 | |
6 | |||||
7 | All sections of the design brief are completed, with complete sentences and appropriate information in each section. | All sections are completed with incomplete sentences present. | One or more sections are incomplete, or contain inappropriate information. | No design brief is completed. | |
8 | Generate Concepts - Jamboard | ||||
9 | |||||
10 | 3 | 2 | 1 | 0 | |
11 | |||||
12 | Screenshot of Jamboard is included with at least 3 different possible solutions. | Screenshot of Jamboard is included with 2 different possible solutions. | Screenshot of Jamborad is included with minimal work done. | No jamboard on slideshow. | |
13 | Develop Solution - Site locations and supply route selection | ||||
14 | |||||
15 | 3 | 2 | 1 | 0 | |
16 | |||||
17 | Screenshot of ArcGIS map is included with Tower location and supply route clearly communicated. | Screenshot of ArcGIS map, but tower locations and supply route is not clearly communicated. | Screenshot of ArcGIS map is included. | No screenshot of site location or supply route. | |
18 | Develop Solution - Considerations for tower location | ||||
19 | |||||
20 | 3 | 2 | 1 | 0 | |
21 | |||||
22 | Explanation of why the site on ArcGIS is chosen, including considerations for site size, tower size, access to site and elevation. | Explanation of why the site on ArcGIS is chosen is missing one or two site considerations. | Explanation of why site location is provided but poorly communicated. | No explanation of tower location is provided. | |
23 | Develop Solution - Considerations for supply route | ||||
24 | |||||
25 | 3 | 2 | 1 | 0 | |
26 | |||||
27 | Explanation of why the supply route was chosen, includes pump location, route selection explanation, any considerations for distance and right of way use are included. Any attempts to reduce cost are explained. Supply line diameter as it relates to supply demand is discussed. | Explanation of why the supply route was chosen is missing one or more of the site considerations. | Explanation of why the supply route was chosen is poorly communicated. | No explanation for the route is provided. | |
28 | Construct and Test - Project estimations | ||||
29 | |||||
30 | 3 | 2 | 1 | 0 | |
31 | |||||
32 | Estimation cost breakdown for tower site and supply route and pump install are listed and complete. Total Project estimation is listed. | Estimation cost breakdown is missing one or two items. | Estimation of cost breakdown is incomplete. | No estimations are included or discussed. | |
33 | Evaluate Solution | ||||
34 | |||||
35 | 3 | 2 | 1 | 0 | |
36 | |||||
37 | The solution is evaluated completely by discussing the improvement to the city infrastructure, the potential for future expansion, and an estimated increase of water needing to be supplied by the city. | The solution is evaluated mostly completely, missing one or two topics | The solution is not evaluated completely. | Solution is not elevated | |
38 | Presentation added to Google Site | ||||
39 | |||||
40 | 4 | 2 | 1 | 0 | |
41 | |||||
42 | Completed Slideshow is added to student’s google site on Jan 9th to allow time for revisions | Slideshow is complete but not added to google site on time | Slideshow is not complete or added on time. | Slideshow is not added to the student’s google site | |
43 | |||||
44 |