ABCDEFGHIJKLMNOPQRSTUVW
1
reJPO subjectDate of Issue
2
1Joint Procedure Order (JPO) on Joint Survey and Cable Route Marking during
execution of any digging/excavation work, Vadodara Division
28.02.2025S&T
3
2precautions to be taken by P-Way Staff
during maintenance of tracks provided with Kavach RFID tags over WR.
27.11.2024S&T
4
3JPO- Securing of vehicle/load/train locomotive5.9.2023
5
4HQ-JPO –Disconnection & reconnection of S&T gear30.6.2023S&T
6
5JPO-Container loading unloading20.6.2023
7
6RB- JPO –Disconnection & reconnection of S&T gear
10.6.23 & 16.6.23
S&T
8
7Relay room S&T keys24.4.2023S&T
9
8Corrigendum to JPO for coupling /uncoupling of loco09.03.2023
10
9Coupling /uncoupling of loco15.09.2022
11
10Alteration of route18.6.2022
12
11DEFECTS NOTICED IN 22OMM TWS POINT MACHINE VOSSLOH MAKE05.03.2022
13
12JointProcedureorder(JPo)forMaintenanceofThickWebSwitches23.02.22
14
13Run over cases action taken24.09.2021S&T
15
14ARME Scale-II09.07.2021S&T
16
15LRD of track machines24.06.2021
17
16Untoward incidence21.04.2021
18
17Opening and maintenance of Sliding boom at LC17.06.2019S&T
19
18Coupling /uncoupling of locomotive28.03.2019
20
19Operation of Trap point31.07.2018S&T
21
20Encroachment in Mumbai suburban17.05.2018
22
21Operation and training staff in EI07.04.2018S&T
23
22Spare S&T key of relay room12.01.2018S&T
24
23Verification of Signal Visibility by Joint Signal Sighting Committee28.11.2017
25
24Utilisation, procurement and maintenance of VHF and WT sets03.10.2012
26
25Feed back system on LPs signing off observation11.07.2012
27
26
Working of Chg. trains when train worked with single pipe air brake system
05.04.2012
28
27Stabling of vehicles at stations yards and running line03.05.2011
29
28opening of relay room at station30.11.2005S&T
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100