CONSTRUCTION SUBMITTAL REVIEW CHECKLIST
2
3
PROJECT INFORMATION
4
Project Name:
5
Project Number:
6
Submittal Number:
7
Spec Section:
8
Submittal Type:☐ Product Data ☐ Shop Drawings ☐ Samples ☐ Other:
9
Date Received:
10
Reviewer:
11
12
1. PROJECT IDENTIFICATION & REVISION CONTROL
13
Project name, number, and contract package confirmed in title block☐☐
14
Current drawing revision and specification version referenced☐☐
15
All applicable RFI responses, addenda, and bulletins reflected☐☐
16
2. SPECIFICATION SECTION & PROJECT MANUAL ALIGNMENT
17
Correct CSI division and spec section confirmed☐☐
18
All required document types included (product data, shop drawings, samples, certs, test reports)☐☐
19
Any items listed as 'to follow' identified and tracked☐☐
20
3. TECHNICAL CHARACTERISTICS & PRODUCT COMPLIANCE
21
All performance data points extracted and compared against technical requirements☐☐
22
Dimensions, clearances, and tolerances verified against design documents☐☐
23
Electrical data confirmed: voltage, phase, FLA, MCA, MOP, SCCR☐☐
24
Refrigerant type confirmed (Div 23 - if applicable)☐☐
25
Coil or surface coatings confirmed against project requirements☐☐
26
Fire ratings, UL/FM listings, and code-required certifications verified☐☐
27
4. APPROVED MANUFACTURER & SUBSTITUTION VERIFICATION
28
Submitted manufacturer confirmed on the approved list☐☐
29
If not on approved list: formal substitution request submitted and reviewed separately☐☐
30
Samples or mockups provided where the spec requires them☐☐
31
5. CONTRACTOR REVIEW STAMP & TRANSMITTAL
32
Contractor's review stamp applied with initials/signature☐☐
33
Transmittal references correct spec section, division, and drawing details☐☐
34
6. CLOSEOUT & ATTIC STOCK REQUIREMENTS
35
Spare parts and extra materials called for in spec identified and confirmed☐☐
36
Warranty terms confirmed — duration, start date basis, and scope☐☐
37
O&M manuals flagged if required at a later stage☐☐
38
7. TRADE COORDINATION & CONSTRUCTION SCHEDULE
39
Interfaces with structural, MEP, envelope, and other trades reviewed☐☐
40
Lead times confirmed against need dates☐☐
41
LEED or owner-specific requirements identified and documented☐☐
42
8. CONTRADICTIONS & RFI TRIGGERS
43
Conflicts between drawings and specs identified☐☐
44
RFI issued for any conflict requiring design team resolution☐☐
45
46
FINAL RECOMMENDATION
47
Submittal Status:☐ Approved ☐ Approved as Noted ☐ Revise and Resubmit ☐ Rejected
48
Reviewed By:
49
Date:
50
Signature:
51
52
Summary of Key Issues / Actions Required:
53
54
55
56
57
58
Template provided by BuildSync | buildsync.ai | Free Construction Submittal Review Checklist
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100