ABCDEFGHIJKLMNOPQRSTUVWXYZ
1
Box No.
Barcode/UNT Number
Report No.SuffixTitlePrint OCLC No.
Electr. OCLC No.
Serial Info
HT/UNT Status
HT/UNT-LinksNotes
2
BurRecBox001EM39015095325810EM-295Placement moisture control studies, Cachuma Dam borrow materials, Cachuma Project /23895246
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095325810
3
BurRecBox001EM39015095325828EM-297Laboratory studies of slide materials, stations 3113 to 3190, Friant-Kern Canal, Central Valley Project /23895255
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095325828
4
BurRecBox001EM39015095325836EM-298
Laboratory tests of earth embankment samples from borrow areas A, B, C, and D, Long Pine Dam site, Niobrara River area, Missouri River Basin Project /
23895269
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095325836
5
BurRecBox001EM39015095325844EM-300Laboratory tests of proposed impervious borrow materials for raising of Clear Lake Dam, Klamath Project /23895279
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095325844
6
BurRecBox001EM39015095325851EM-301
Comparison of seepage computed from well-permeameter and casing-type field permeability tests with seepage from ponding, Middle Loup Public Power and Irrigation District Canal no. 2, Lower Platte River area, Nebraska /
23895292
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095325851
7
BurRecBox001EM39015095327154EM-308Laboratory tests of proposed pervious borrow materials, Rattlesnake Dam, Colorado, Big Thompson Project, Colorado /32248169
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095327154
8
BurRecBox001EM39015095325869EM-314Progress report of research on the penetration resistance method of subsurface exploration /35422209
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095325869
9
BurRecBox001EM39015095325877EM-329
Laboratory tests on embankment materials, North Branch and South Branch Dams, Picacho Arroyo Control Program, Rio Grande Project, New Mexico, Texas /
32248304
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095325877
10
BurRecBox001EM39015095325885EM-331
Laboratory tests on embankment and gravel blanket material for dam no. 2, Stubblefield Dam, and dam no. 13 Vermejo Project, New Mexico /
32185420
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095325885
11
BurRecBox001EM39015095325893EM-333
Results of tests on soils from prosposed borrow areas for canal embankment and lining and from existing unlined canals, Madera Distribution Systems, Madera Construction Division, Central Valley Project. Progress report I /
32248185
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095325893
12
BurRecBox001EM39015095325901EM-334
Laboratory studies on foundation material, Little Porcupine Power Plant, Missouri Diversion Unit, Missouri River Basin Project, Montana /
32248202
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095325901
13
BurRecBox001EM39015095325919EM-341
Laboratory tests on foundation and embankment samples, Kirwin Dam and Spillway, Solomon Division, Missouri River Basin Project, Kansas /
1264295918
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095325919
14
BurRecBox001EM39015095325927EM-342
Laboratory tests on proposed borrow material Spillway area, Lovewell Dam, Bostwick Division, Missouri River Basin Project, Kansas /
1264295917
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095325927
15
BurRecBox001EM39015095325935EM-343
Laboratory tests on foundation material, Lincoln Valley Power Plant, Garrison Division, Missouri River Basin Project, North Dakota /
1264295790
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095325935
16
BurRecBox001EM39015095325943EM-344Laboratory tests on embankment material, Milton Dam site, Milton-Freewater Project, Oregon-Washington /1264295789
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095325943
17
BurRecBox001EM39015095325950EM-345
Laboratory tests on embankment material, Bumping Lake enlargement dam, Yakima Supplemental Storage project, Washington /
276172352
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095325950
18
BurRecBox001EM39015095325968EM-346
Laboratory tests on "Bentonite" seams in Niobrara chalk from the foundation of Webster Dam Spillway, Kansas River District, Missouri River Basin Project, Kansas /
1264295788
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095325968
19
BurRecBox001EM39015095325976EM-347Laboratory tests on proposed embankment material, Wasco Dam, Juniper Division, Wapinitia Project, Oregon /1264295787
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095325976
20
BurRecBox001EM39015095325984EM-352Laboratory studies on backfill materials, San Jacinto-San Vicente Aqueduct, San Diego Project /276172954
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095325984
21
BurRecBox001EM39015095326040EM-353Permeability and settlement of laboratory specimens of sand and sand-gravel mixtures /1264295908
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095326040
22
BurRecBox001EM39015095325992EM-354Laboratory tests on proposed canal embankment and lining materials, Eden Canal Schedule 2, Eden Project, Wyoming /1264295657
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095325992
23
BurRecBox001EM39015095326008EM-355
Laboratory tests on samples of proposed impervious embankment materials -- Clark Canyon Dam -- Jefferson Division, Missouri River Basin Project /
773366150
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095326008
24
BurRecBox001EM39015095326016EM-356Second progress report of research on the penetration resistance method of subsurface exploration /12334574
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095326016
25
BurRecBox001EM39015095326024EM-357Stability studies of canal slopes along the inlet channel to the Bald Mountain Tunnel, Colorado, Big Thompson Project /1264295900
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095326024
26
BurRecBox001EM39015095326032EM-358
Laboratory tests on samples representing proposed borrow material, borrow area A, Sly Park Dam, Central Valley Project, California /
276172191
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095326032
27
BurRecBox001EM39015095326057EM-359
Bearing capacity studies of tower foundation materials, Jamestown-Fargo Transmission Line, Missouri River Basin Project, North Dakota /
23897768
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095326057
28
BurRecBox001EM39015095326065EM-360Laboratory tests on embankment material, Wanship Dam, Weber Basin Project, Utah /32248289
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095326065
29
BurRecBox001EM39015095326073EM-361
Foundations investigations at the site of the Prophets Mountain Pumping Plant, Missouri-Souris Division, Missouri River Basin Project, North Dakota /
35247598
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095326073
30
BurRecBox001EM39015095326081EM-362
Laboratory testing of foundation and embankment materials, Lovewell Dam, Bostwick Division, Missouri River Basin Project, Nebraska /
32248233
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095326081
31
BurRecBox001EM39015095326099EM-363
Laboratory studies on conduit alinement samples and on a sample of borrow material proposed for "consolidated backfill", Sly Park-Camino Conduit, Central Valley Project, California /
32248216
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095326099
32
BurRecBox001EM39015095326107EM-364Laboratory tests on spillway foundation material, Lovewell Dam, Bostwick Division, Missouri River Basin Project, Nebraska /1264295907
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095326107
33
BurRecBox001EM39015095326115EM-365
Laboratory studies on foundation material, Lone Tree Power Plant, Garrison Division, Missouri River Basin Project, North Dakota /
1264295906
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095326115
34
BurRecBox001EM39015095326123EM-367
Laboratory studies on samples representing proposed impervious borrow materials, Lone Tree Dam, Missouri-Souris Division, Missouri River Basin Project, North Dakota /
1264295905
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095326123
35
BurRecBox001EM39015095326131EM-368
Laboratory tests on samples representing proposed impervious borrow materials, Wintering Dam, Missouri-Souris Division, Missouri River Basin Project, North Dakota /
1264295904
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095326131
36
BurRecBox001EM39015095326149EM-369Laboratory tests on proposed embankment and lining materials, Eden Canal Laterals, Eden Project, Wyoming /1264295903
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095326149
37
BurRecBox001EM39015095326156EM-371Laboratory tests on embankment material, Palo Verde Diversion Dam, California /1264295899
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095326156
38
BurRecBox001EM39015095326164EM-372
Laboratory studies of soil samples, stations 1807+31, 1807+61, 1807+98, 3082+40, 3085+00, 3088+70, and 4315+- -, Friant-Kern Canal, Central Valley Project /
276172897
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095326164
39
BurRecBox001EM39015095326172EM-373
Laboratory tests on electrochemical treatment proposed for Lower-cost Canal Lining Program, Big Horn District, Wyoming /
23897783
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095326172
40
BurRecBox001EM39015095326180EM-374
Laboratory studies on proposed dike embankment materials, Red Bluff Diversion Dam, Sacramento Canals Unit, California /
23897817
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095326180
41
BurRecBox001EM39015095326198EM-376Laboratory tests on proposed canal lining materials, Kirwin Main Canal, First Section, Missouri River Basin Project, Kansas /1264295898
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095326198
42
BurRecBox001EM39015095326206EM-377Results of laboratory tests on soils and water for sediment lining demonstration, Lower-Cost Canal Lining Program /276174315
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095326206
43
BurRecBox001EM39015095326222EM-378Laboratory tests of core hole samples, ground-water studies, Sacramento Valley Canals Unit, California /47936227
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095326222
44
BurRecBox001EM39015095326214EM-379
Supplemental laboratory report of tests on samples of embankment material, Webster Dam, Kansas River District, Missouri River Basin Project, Kansas /
1264295897
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095326214
45
BurRecBox001EM39015095326230EM-380Laboratory tests on samples of foundation and blanket materials, Norman Dam and Spillway, Norman Project, Oklahoma /1264295896
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095326230
46
BurRecBox001EM39015095326248EM-381
Placement moisture control and shearing strength studies, Pactola Dam borrow materials, Missouri River Basin Project, South Dakota /
1264295888
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095326248
47
BurRecBox001EM39015095326255EM-382
Laboratory tests on proposed canal lining materials, Shirley Main Canal, Shirley Unit, Second Division, Buffalo Rapids Project, Montana /
1264295887
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095326255
48
BurRecBox001EM39015095326263EM-383Construction of compacted soil linings for canals /182521382
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095326263
49
BurRecBox001EM39015095326271EM-384Laboratory studies on soil samples from the Corning Canal investigation, Sacramento Valley Canals Unit, California /276174678
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095326271
50
BurRecBox001EM39015095326289EM-385Laboratory studies on foundation materials, Red Bluff Diversion Dam, Central Valley Project /276174046
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095326289
51
BurRecBox001EM39015095326297EM-386Laboratory tests on proposed canal lining materials, Eltopia Branch Canal, Columbia River Basin Project, Washington /1264295886
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095326297
52
BurRecBox001EM39015095326305EM-387Laboratory tests on expansive clays, Gateway Canal, Weber Basin Project, Utah /1264295885
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095326305
53
BurRecBox001EM39015095326313EM-388Laboratory tests on spillway and outlet works foundation materials, Vega Dam, Collbran Project, Colorado /1264295884
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095326313
54
BurRecBox001EM39015095326339EM-389Laboratory tests on overchute foundation material, station 36+35, Putah South Canal, Solano Project, California /276174756
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095326339
55
BurRecBox001EM39015095326321EM-390
Laboratory tests on proposed compacted earth canal lining mixtures, West Canal Laterals, Lateral W-20 Schedules No. 1 and 2, Columbia River Basin Project, Washington /
1264295883
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095326321
56
BurRecBox001EM39015095326347EM-392Performance of core and drive-type samplers in the undisturbed sampling of cohesionless sand : soil sampling research /47936212
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095326347
57
BurRecBox001EM39015095326354EM-393Laboratory studies on canal lining materials, South Platte Supply Canal, Colorado, Big Thompson Project /1264295890
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095326354
58
BurRecBox001EM39015095326362EM-394Laboratory studies on canal foundation materials, Putah South Canal, Solano Project, California /276175615
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095326362
59
BurRecBox001EM39015095326370EM-395Laboratory studies on proposed earth canal lining materials, Weber-Provo Diversion Canal, Provo River Project, Utah /1264295889
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095326370
60
BurRecBox001EM39015095327162EM-396
Laboratory tests on a sample of proposed earth lining material, Station 2000 to 2020, Courtland Canal, Fourth Section, Missouri River Basin Project /
1264295593
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095327162
61
BurRecBox001EM39015095326388EM-397Laboratory studies on spillway foundation materials, Alamogordo Dam, Carlsbad Project, New Mexico /1264295594
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095326388
62
BurRecBox001EM39015095326396EM-398
Laboratory tests on earth samples from the East Borrow Area, Alamogordo Dam rehabilitation, Carlsbad Project, New Mexico /
1264295882
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095326396
63
BurRecBox001EM39015095326404EM-399
Results of laboratory tests on soils and water for sediment lining installations, Lower-Cost Canal Lining Program (progress report no. 2) /
276175682
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095326404
64
BurRecBox001EM39015095326412EM-400
Laboratory studies on embankment and foundation materials, Willow Creek Dam rehabilitation, James Division, Missouri River Basin Project, South Dakota /
1264295874
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095326412
65
BurRecBox001EM39015095326420EM-401Laboratory tests of foundation samples from Zone "A", Merritt Dam site, Ainsworth Unit, Missouri River Basin Project /1264295873
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095326420
66
BurRecBox001EM39015095326438EM-403
Laboratory studies on soil samples, Tehama Colusa Canal investigations, Sacramento Canals Unit, Central Valley Project, California /
23898295
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095326438
67
BurRecBox001EM39015095326446EM-405Laboratory tests on embankment material, Little Wood River Dam rehabilitation, Little Wood River Project, Idaho /23898308
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095326446
68
BurRecBox001EM39015095326453EM-406Laboratory studies on typical conduit backfill materials, San Jacinto-San Vicente Aqueduct, San Diego Project /23898339
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095326453
69
ASD-TRBox001BurRecEM39015095305176EM-407
Laboratory studies on canal foundation materials, Courtland Canal, 4th Section, Bostwick Division, Missouri River Basin Project, Nebraska /
11834170911341376330
Available HT 08/30/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095305176
70
ASD-TRBox001BurRecEM39015095305184EM-408
Laboratory tests on soil samples obtained during channel improvement and bank stabilization investigations, Grand Coulee Dam, Columbia Basin Project /
11834170901341833078
Available HT 08/30/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095305184
71
ASD-TRBox001BurRecEM39015095305192EM-409Filter test to determine the filter material reqirements to support a clayey fine sand of low permeability /11834170891347438692
Available HT 08/30/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095305192
72
BurRecBox001EM39015095326461EM-410
Progress report on laboratory tests on proposed embankment and earth lining materials, Eden Project laterals, Eden Project, Wyoming /
1264295872
NOT Available HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095326461
73
BurRecBox001EM39015095326479EM-412Laboratory studies on proposed borrow material, Howard Prairie Dam, Talent Division, Rogue River Basin Project, Oregon /25272968
NOT Availabl HT 10/17/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095326479
74
ASD-TRBox001BurRecEM39015095305200EM-413
Laboratory tests on proposed borrow materials, Helena Valley Regulating Reservoir, Helena Valley Unit, Missouri River Basin Project, Montana /
11834170881347679098
Available HT 08/30/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095305200
75
ASD-TRBox001BurRecEM39015095305218EM-414
Laboratory tests on proposed earth lining materials, Fourth Division, Main Canal, Kennewick Division, Yakima Project, Washington /
252730901347497217
Available HT 08/30/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095305218
76
ASD-TRBox001BurRecEM39015095305226EM-415
Supplementary report of laboratory tests on proposed embankment and earth lining materials, Eden Project laterals, Eden Project, Wyoming /
11834170871347490030
Available HT 08/30/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095305226
77
ASD-TRBox001BurRecEM39015095305234EM-417Progress report of laboratory testing of embankment materials, Trinity Dam, Trinity River Project, California /11834170861347431726
Available HT 08/30/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095305234
78
UNTBox115UNTEM-418Laboratory tests on proposed embankment and subgrade materials, Hanover Main Canal No. 2, Hanover Bluff Unit, Missouri River Basin Project /1245962838
Available HT 08/30/2023
http://digital.library.unt.edu/ark:/67531/metadc1536333/
79
ASD-TRBox001BurRecEM39015095305242EM-419
Filter test to determine the cause of plugged underdrains downstream from Station 6999+00, specifications no. 3056, Friant-Kern Canal, Central Valley Project /
238988161347460300
Available HT 08/30/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095305242
80
ASD-TRBox001BurRecEM39015095305259EM-420
Laboratory studies on proposed subgrade and earth linking materials, Atrisco Feeder Canal, Albuquerque Project Office, New Mexico /
11834168991347435766
Available HT 08/30/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095305259
81
ASD-TRBox001BurRecEM39015095305267EM-421
Laboratory studies on foundation, embankment, and earth lining materials, Ainsworth Canal, Niobrara River Basin, Nebraska /
11834168981347498379
Available HT 08/30/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095305267
82
ASD-TRBox001BurRecEM39015095305275EM-423
Results of laboratory tests on soil-cement lining mixtures, Lateral W39.9F, Columbia Basin Project, Lower-cost Canal Lining Program /
11834168971347425492
Available HT 08/30/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095305275
83
ASD-TRBox001BurRecEM39015095305283EM-424Summary of research studies on loess for uses as foundations and construction material /238989041347489981
Available HT 08/30/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095305283
84
ASD-TRBox001BurRecEM39015095305333EM-428Laboratory tests on Borrow Area D material, Palo Verde Diversion Dam, California-Arizona 11834170371347687026
Available HT 08/30/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095305333
85
ASD-TRBox001BurRecEM39015095305291EM-429
Laboratory tests on embankment materials from South Borrow Area, Lovewell Dam, Bostwick Division, Missouri River Basin Project /
11834170391347433981
Available HT 08/30/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095305291
86
ASD-TRBox001BurRecEM39015095305309EM-430
Experimental laboratory filter tests for underdrains at Station 7371+00, Friant-Kern Canal, Central Valley Project, California /
238990271347410443
Available HT 08/30/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095305309
87
ASD-TRBox001BurRecEM39015095305317EM-431Laboratory tests on embankment material, Gaston Dam, Tualatin Project, Oregon /252732791347679432
Available HT 08/30/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095305317
88
ASD-TRBox001BurRecEM39015095305325EM-432Laboratory tests on proposed earth borrow materials, Haystack Dam, Deschutes Project, Oregon /11834170381347498021
Available HT 08/30/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095305325
89
ASD-TRBox001BurRecEM39015095305333EM-433
Laboratory tests on embankment samples, Palo Verde Diversion Dam, Palo Verde Diversion Project, California : includes report no. EM-428 as appendix 2 /
11834170371347687026
Available HT 08/30/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095305333
90
ASD-TRBox001BurRecEM39015095305341EM-434Laboratory tests on samples of suspected expansive clays, Robles-Casitas Canal, Ventura River Project, California /252760711347441968
Available HT 08/30/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095305341
91
ASD-TRBox001BurRecEM39015095305358EM-435Laboratory tests on proposed embankment materials, Casitas Dam, Ventura River Project, California /252761271347681871
Available HT 08/30/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095305358
92
ASD-TRBox001BurRecEM39015095305366EM-437
Laboratory studies on undisturbed drive samples, Trinity Dam Borrow Area, Trinity River Project, California : progress report no. 2 /
252761731347479593
Available HT 08/30/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095305366
93
ASD-TRBox001BurRecEM39015095305374EM-438Laboratory studies of blended earth lining materials, Lateral El-68, Station 435, Columbia Basin Project /11834170361347684793
Available HT 08/30/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095305374
94
ASD-TRBox001BurRecEM39015095305382EM-439Progress report no. 3 on laboratory testing of embankment materials, Trinity Dam, Trinity River Project, California /252771311347679336
Available HT 08/30/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095305382
95
BurRecBox001EM39015095326487EM-440Laboratory studies on samples of embankment materials, Vaquero Dam, Santa Maria Project, California /25277253
NOT Available HT 10/17/2023, 08/30/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095326487
96
ASD-TRBox001BurRecEM39015095305416EM-441Research tests to investigate criteria for selection between vibratory or impact compaction methods /252774301342253431
Available HT 08/30/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095305416
97
ASD-TRBox001BurRecEM39015095305390EM-442Laboratory tests on samples of overburden and borrow materials, Scoggin Creek Dam, Tualatin Project, Oregon /252781631347417245
Available HT 08/30/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095305390
98
ASD-TRBox001BurRecEM39015095305408EM-443
Laboratory tests on trench backfill material, Lateral 137.2, Shafter-Wasco Irrigation District, Friant-Kern Distribution System, Central Valley Project, California /
252782121347682120
Available HT 08/30/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095305408
99
BurRecBox002EM39015095305424EM-444Laboratory tests on samples of zone 1 borrow material, Wanship Dam, Weber Basin Project, Utah /25278370
NOT Available HT 10/23/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095305424
100
BurRecBox002EM39015095305432EM-445
Laboratory tests on samples of embankment materials, Wintering Dam, New Home Dam, and New Home Dike, Garrison Division, Missouri River Basin Project /
23899054
NOT Available HT 10/23/2023
https://babel.hathitrust.org/cgi/pt?id=mdp.39015095305432