ABCDEFGHIJKLMNOPQRSTUVWXYZ
1
Box No.
Barcode/UNT Number
Report No.SuffixTitle
Print OCLC No.
Electr. OCLC No.
Serial Info
HT/UNT Status
HT/UNT-LinksNotes
2
BurRecBox001EM39015095325810EM-295Placement moisture control studies, Cachuma Dam borrow materials, Cachuma Project /23895246
3
BurRecBox001EM39015095325828EM-297Laboratory studies of slide materials, stations 3113 to 3190, Friant-Kern Canal, Central Valley Project /23895255
4
BurRecBox001EM39015095325836EM-298
Laboratory tests of earth embankment samples from borrow areas A, B, C, and D, Long Pine Dam site, Niobrara River area, Missouri River Basin Project /
23895269
5
BurRecBox001EM39015095325844EM-300Laboratory tests of proposed impervious borrow materials for raising of Clear Lake Dam, Klamath Project /23895279
6
BurRecBox001EM39015095325851EM-301
Comparison of seepage computed from well-permeameter and casing-type field permeability tests with seepage from ponding, Middle Loup Public Power and Irrigation District Canal no. 2, Lower Platte River area, Nebraska /
23895292
7
BurRecBox001EM39015095327154EM-308
Laboratory tests of proposed pervious borrow materials, Rattlesnake Dam, Colorado, Big Thompson Project, Colorado /
32248169
8
BurRecBox001EM39015095325869EM-314Progress report of research on the penetration resistance method of subsurface exploration /35422209
9
BurRecBox001EM39015095325877EM-329
Laboratory tests on embankment materials, North Branch and South Branch Dams, Picacho Arroyo Control Program, Rio Grande Project, New Mexico, Texas /
32248304
10
BurRecBox001EM39015095325885EM-331
Laboratory tests on embankment and gravel blanket material for dam no. 2, Stubblefield Dam, and dam no. 13 Vermejo Project, New Mexico /
32185420
11
BurRecBox001EM39015095325893EM-333
Results of tests on soils from prosposed borrow areas for canal embankment and lining and from existing unlined canals, Madera Distribution Systems, Madera Construction Division, Central Valley Project. Progress report I /
32248185
12
BurRecBox001EM39015095325901EM-334
Laboratory studies on foundation material, Little Porcupine Power Plant, Missouri Diversion Unit, Missouri River Basin Project, Montana /
32248202
13
BurRecBox001EM39015095325919EM-341
Laboratory tests on foundation and embankment samples, Kirwin Dam and Spillway, Solomon Division, Missouri River Basin Project, Kansas /
1264295918
14
BurRecBox001EM39015095325927EM-342
Laboratory tests on proposed borrow material Spillway area, Lovewell Dam, Bostwick Division, Missouri River Basin Project, Kansas /
1264295917
15
BurRecBox001EM39015095325935EM-343
Laboratory tests on foundation material, Lincoln Valley Power Plant, Garrison Division, Missouri River Basin Project, North Dakota /
1264295790
16
BurRecBox001EM39015095325943EM-344Laboratory tests on embankment material, Milton Dam site, Milton-Freewater Project, Oregon-Washington /1264295789
17
BurRecBox001EM39015095325950EM-345
Laboratory tests on embankment material, Bumping Lake enlargement dam, Yakima Supplemental Storage project, Washington /
276172352
18
BurRecBox001EM39015095325968EM-346
Laboratory tests on "Bentonite" seams in Niobrara chalk from the foundation of Webster Dam Spillway, Kansas River District, Missouri River Basin Project, Kansas /
1264295788
19
BurRecBox001EM39015095325976EM-347Laboratory tests on proposed embankment material, Wasco Dam, Juniper Division, Wapinitia Project, Oregon /1264295787
20
BurRecBox001EM39015095325984EM-352Laboratory studies on backfill materials, San Jacinto-San Vicente Aqueduct, San Diego Project /276172954
21
BurRecBox001EM39015095326040EM-353Permeability and settlement of laboratory specimens of sand and sand-gravel mixtures /1264295908
22
BurRecBox001EM39015095325992EM-354
Laboratory tests on proposed canal embankment and lining materials, Eden Canal Schedule 2, Eden Project, Wyoming /
1264295657
23
BurRecBox001EM39015095326008EM-355
Laboratory tests on samples of proposed impervious embankment materials -- Clark Canyon Dam -- Jefferson Division, Missouri River Basin Project /
773366150
24
BurRecBox001EM39015095326016EM-356Second progress report of research on the penetration resistance method of subsurface exploration /12334574
25
BurRecBox001EM39015095326024EM-357
Stability studies of canal slopes along the inlet channel to the Bald Mountain Tunnel, Colorado, Big Thompson Project /
1264295900
26
BurRecBox001EM39015095326032EM-358
Laboratory tests on samples representing proposed borrow material, borrow area A, Sly Park Dam, Central Valley Project, California /
276172191
27
BurRecBox001EM39015095326057EM-359
Bearing capacity studies of tower foundation materials, Jamestown-Fargo Transmission Line, Missouri River Basin Project, North Dakota /
23897768
28
BurRecBox001EM39015095326065EM-360Laboratory tests on embankment material, Wanship Dam, Weber Basin Project, Utah /32248289
29
BurRecBox001EM39015095326073EM-361
Foundations investigations at the site of the Prophets Mountain Pumping Plant, Missouri-Souris Division, Missouri River Basin Project, North Dakota /
35247598
30
BurRecBox001EM39015095326081EM-362
Laboratory testing of foundation and embankment materials, Lovewell Dam, Bostwick Division, Missouri River Basin Project, Nebraska /
32248233
31
BurRecBox001EM39015095326099EM-363
Laboratory studies on conduit alinement samples and on a sample of borrow material proposed for "consolidated backfill", Sly Park-Camino Conduit, Central Valley Project, California /
32248216
32
BurRecBox001EM39015095326107EM-364
Laboratory tests on spillway foundation material, Lovewell Dam, Bostwick Division, Missouri River Basin Project, Nebraska /
1264295907
33
BurRecBox001EM39015095326115EM-365
Laboratory studies on foundation material, Lone Tree Power Plant, Garrison Division, Missouri River Basin Project, North Dakota /
1264295906
34
BurRecBox001EM39015095326123EM-367
Laboratory studies on samples representing proposed impervious borrow materials, Lone Tree Dam, Missouri-Souris Division, Missouri River Basin Project, North Dakota /
1264295905
35
BurRecBox001EM39015095326131EM-368
Laboratory tests on samples representing proposed impervious borrow materials, Wintering Dam, Missouri-Souris Division, Missouri River Basin Project, North Dakota /
1264295904
36
BurRecBox001EM39015095326149EM-369Laboratory tests on proposed embankment and lining materials, Eden Canal Laterals, Eden Project, Wyoming /1264295903
37
BurRecBox001EM39015095326156EM-371Laboratory tests on embankment material, Palo Verde Diversion Dam, California /1264295899
38
BurRecBox001EM39015095326164EM-372
Laboratory studies of soil samples, stations 1807+31, 1807+61, 1807+98, 3082+40, 3085+00, 3088+70, and 4315+- -, Friant-Kern Canal, Central Valley Project /
276172897
39
BurRecBox001EM39015095326172EM-373
Laboratory tests on electrochemical treatment proposed for Lower-cost Canal Lining Program, Big Horn District, Wyoming /
23897783
40
BurRecBox001EM39015095326180EM-374
Laboratory studies on proposed dike embankment materials, Red Bluff Diversion Dam, Sacramento Canals Unit, California /
23897817
41
BurRecBox001EM39015095326198EM-376
Laboratory tests on proposed canal lining materials, Kirwin Main Canal, First Section, Missouri River Basin Project, Kansas /
1264295898
42
BurRecBox001EM39015095326206EM-377
Results of laboratory tests on soils and water for sediment lining demonstration, Lower-Cost Canal Lining Program /
276174315
43
BurRecBox001EM39015095326222EM-378Laboratory tests of core hole samples, ground-water studies, Sacramento Valley Canals Unit, California /47936227
44
BurRecBox001EM39015095326214EM-379
Supplemental laboratory report of tests on samples of embankment material, Webster Dam, Kansas River District, Missouri River Basin Project, Kansas /
1264295897
45
BurRecBox001EM39015095326230EM-380
Laboratory tests on samples of foundation and blanket materials, Norman Dam and Spillway, Norman Project, Oklahoma /
1264295896
46
BurRecBox001EM39015095326248EM-381
Placement moisture control and shearing strength studies, Pactola Dam borrow materials, Missouri River Basin Project, South Dakota /
1264295888
47
BurRecBox001EM39015095326255EM-382
Laboratory tests on proposed canal lining materials, Shirley Main Canal, Shirley Unit, Second Division, Buffalo Rapids Project, Montana /
1264295887
48
BurRecBox001EM39015095326263EM-383Construction of compacted soil linings for canals /182521382
49
BurRecBox001EM39015095326271EM-384
Laboratory studies on soil samples from the Corning Canal investigation, Sacramento Valley Canals Unit, California /
276174678
50
BurRecBox001EM39015095326289EM-385Laboratory studies on foundation materials, Red Bluff Diversion Dam, Central Valley Project /276174046
51
BurRecBox001EM39015095326297EM-386
Laboratory tests on proposed canal lining materials, Eltopia Branch Canal, Columbia River Basin Project, Washington /
1264295886
52
BurRecBox001EM39015095326305EM-387Laboratory tests on expansive clays, Gateway Canal, Weber Basin Project, Utah /1264295885
53
BurRecBox001EM39015095326313EM-388Laboratory tests on spillway and outlet works foundation materials, Vega Dam, Collbran Project, Colorado /1264295884
54
BurRecBox001EM39015095326339EM-389
Laboratory tests on overchute foundation material, station 36+35, Putah South Canal, Solano Project, California /
276174756
55
BurRecBox001EM39015095326321EM-390
Laboratory tests on proposed compacted earth canal lining mixtures, West Canal Laterals, Lateral W-20 Schedules No. 1 and 2, Columbia River Basin Project, Washington /
1264295883
56
BurRecBox001EM39015095326347EM-392
Performance of core and drive-type samplers in the undisturbed sampling of cohesionless sand : soil sampling research /
47936212
57
BurRecBox001EM39015095326354EM-393Laboratory studies on canal lining materials, South Platte Supply Canal, Colorado, Big Thompson Project /1264295890
58
BurRecBox001EM39015095326362EM-394Laboratory studies on canal foundation materials, Putah South Canal, Solano Project, California /276175615
59
BurRecBox001EM39015095326370EM-395
Laboratory studies on proposed earth canal lining materials, Weber-Provo Diversion Canal, Provo River Project, Utah /
1264295889
60
BurRecBox001EM39015095327162EM-396
Laboratory tests on a sample of proposed earth lining material, Station 2000 to 2020, Courtland Canal, Fourth Section, Missouri River Basin Project /
1264295593
61
BurRecBox001EM39015095326388EM-397Laboratory studies on spillway foundation materials, Alamogordo Dam, Carlsbad Project, New Mexico /1264295594
62
BurRecBox001EM39015095326396EM-398
Laboratory tests on earth samples from the East Borrow Area, Alamogordo Dam rehabilitation, Carlsbad Project, New Mexico /
1264295882
63
BurRecBox001EM39015095326404EM-399
Results of laboratory tests on soils and water for sediment lining installations, Lower-Cost Canal Lining Program (progress report no. 2) /
276175682
64
BurRecBox001EM39015095326412EM-400
Laboratory studies on embankment and foundation materials, Willow Creek Dam rehabilitation, James Division, Missouri River Basin Project, South Dakota /
1264295874
65
BurRecBox001EM39015095326420EM-401
Laboratory tests of foundation samples from Zone "A", Merritt Dam site, Ainsworth Unit, Missouri River Basin Project /
1264295873
66
BurRecBox001EM39015095326438EM-403
Laboratory studies on soil samples, Tehama Colusa Canal investigations, Sacramento Canals Unit, Central Valley Project, California /
23898295
67
BurRecBox001EM39015095326446EM-405
Laboratory tests on embankment material, Little Wood River Dam rehabilitation, Little Wood River Project, Idaho /
23898308
68
BurRecBox001EM39015095326453EM-406Laboratory studies on typical conduit backfill materials, San Jacinto-San Vicente Aqueduct, San Diego Project /23898339
69
ASD-TRBox001BurRecEM
39015095305176EM-407
Laboratory studies on canal foundation materials, Courtland Canal, 4th Section, Bostwick Division, Missouri River Basin Project, Nebraska /
1183417091
70
ASD-TRBox001BurRecEM
39015095305184EM-408
Laboratory tests on soil samples obtained during channel improvement and bank stabilization investigations, Grand Coulee Dam, Columbia Basin Project /
1183417090
71
ASD-TRBox001BurRecEM
39015095305192EM-409Filter test to determine the filter material reqirements to support a clayey fine sand of low permeability /1183417089
72
BurRecBox001EM39015095326461EM-410
Progress report on laboratory tests on proposed embankment and earth lining materials, Eden Project laterals, Eden Project, Wyoming /
1264295872
73
BurRecBox001EM39015095326479EM-412
Laboratory studies on proposed borrow material, Howard Prairie Dam, Talent Division, Rogue River Basin Project, Oregon /
25272968
74
ASD-TRBox001BurRecEM
39015095305200EM-413
Laboratory tests on proposed borrow materials, Helena Valley Regulating Reservoir, Helena Valley Unit, Missouri River Basin Project, Montana /
1183417088
75
ASD-TRBox001BurRecEM
39015095305218EM-414
Laboratory tests on proposed earth lining materials, Fourth Division, Main Canal, Kennewick Division, Yakima Project, Washington /
25273090
76
ASD-TRBox001BurRecEM
39015095305226EM-415
Supplementary report of laboratory tests on proposed embankment and earth lining materials, Eden Project laterals, Eden Project, Wyoming /
1183417087
77
ASD-TRBox001BurRecEM
39015095305234EM-417Progress report of laboratory testing of embankment materials, Trinity Dam, Trinity River Project, California /1183417086
78
UNTBox115UNTEM-418Laboratory tests on proposed embankment and subgrade materials, Hanover Main Canal No. 2, Hanover Bluff Unit, Missouri River Basin Project /1245962838
http://digital.library.unt.edu/ark:/67531/metadc1536333/
79
ASD-TRBox001BurRecEM
39015095305242EM-419
Filter test to determine the cause of plugged underdrains downstream from Station 6999+00, specifications no. 3056, Friant-Kern Canal, Central Valley Project /
23898816
80
ASD-TRBox001BurRecEM
39015095305259EM-420
Laboratory studies on proposed subgrade and earth linking materials, Atrisco Feeder Canal, Albuquerque Project Office, New Mexico /
1183416899
81
ASD-TRBox001BurRecEM
39015095305267EM-421
Laboratory studies on foundation, embankment, and earth lining materials, Ainsworth Canal, Niobrara River Basin, Nebraska /
1183416898
82
ASD-TRBox001BurRecEM
39015095305275EM-423
Results of laboratory tests on soil-cement lining mixtures, Lateral W39.9F, Columbia Basin Project, Lower-cost Canal Lining Program /
1183416897
83
ASD-TRBox001BurRecEM
39015095305283EM-424Summary of research studies on loess for uses as foundations and construction material /23898904
84
ASD-TRBox001BurRecEM
39015095305333EM-428Laboratory tests on Borrow Area D material, Palo Verde Diversion Dam, California-Arizona 1183417037
85
ASD-TRBox001BurRecEM
39015095305291EM-429
Laboratory tests on embankment materials from South Borrow Area, Lovewell Dam, Bostwick Division, Missouri River Basin Project /
1183417039
86
ASD-TRBox001BurRecEM
39015095305309EM-430
Experimental laboratory filter tests for underdrains at Station 7371+00, Friant-Kern Canal, Central Valley Project, California /
23899027
87
ASD-TRBox001BurRecEM
39015095305317EM-431Laboratory tests on embankment material, Gaston Dam, Tualatin Project, Oregon /25273279
88
ASD-TRBox001BurRecEM
39015095305325EM-432Laboratory tests on proposed earth borrow materials, Haystack Dam, Deschutes Project, Oregon /1183417038
89
ASD-TRBox001BurRecEM
39015095305333EM-433
Laboratory tests on embankment samples, Palo Verde Diversion Dam, Palo Verde Diversion Project, California : includes report no. EM-428 as appendix 2 /
1183417037
90
ASD-TRBox001BurRecEM
39015095305341EM-434
Laboratory tests on samples of suspected expansive clays, Robles-Casitas Canal, Ventura River Project, California /
25276071
91
ASD-TRBox001BurRecEM
39015095305358EM-435Laboratory tests on proposed embankment materials, Casitas Dam, Ventura River Project, California /25276127
92
ASD-TRBox001BurRecEM
39015095305366EM-437
Laboratory studies on undisturbed drive samples, Trinity Dam Borrow Area, Trinity River Project, California : progress report no. 2 /
25276173
93
ASD-TRBox001BurRecEM
39015095305374EM-438Laboratory studies of blended earth lining materials, Lateral El-68, Station 435, Columbia Basin Project /1183417036
94
ASD-TRBox001BurRecEM
39015095305382EM-439
Progress report no. 3 on laboratory testing of embankment materials, Trinity Dam, Trinity River Project, California /
25277131
95
BurRecBox001EM39015095326487EM-440Laboratory studies on samples of embankment materials, Vaquero Dam, Santa Maria Project, California /25277253
96
ASD-TRBox001BurRecEM
39015095305416EM-441Research tests to investigate criteria for selection between vibratory or impact compaction methods /25277430
97
ASD-TRBox001BurRecEM
39015095305390EM-442
Laboratory tests on samples of overburden and borrow materials, Scoggin Creek Dam, Tualatin Project, Oregon /
25278163
98
ASD-TRBox001BurRecEM
39015095305408EM-443
Laboratory tests on trench backfill material, Lateral 137.2, Shafter-Wasco Irrigation District, Friant-Kern Distribution System, Central Valley Project, California /
25278212
99
BurRecBox002EM39015095305424EM-444Laboratory tests on samples of zone 1 borrow material, Wanship Dam, Weber Basin Project, Utah /25278370
100
BurRecBox002EM39015095305432EM-445
Laboratory tests on samples of embankment materials, Wintering Dam, New Home Dam, and New Home Dike, Garrison Division, Missouri River Basin Project /
23899054