| A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | AA | AB | AC | AD | AE | AF | AG | AH | AI | AJ | AK | AL | AM | AN | AO | AP | AQ | AR | AS | AT | AU | AV | AW | AX | AY | AZ | BA | BB | BC | BD | BE | BF | BG | BH | BI | BJ | BK | BL | BM | BN | BO | BP | BQ | BR | BS | BT | ||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | Hasil Verifikasi Pendaftaran Skripsi/Tugas Akhir Ganjil 2024 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
3 | No | Nama | NIM | Kemanusiaan dan Keimanan | Pancasila | Bahasa Inggris | Aplikasi Komputer | Kalkulus | Fisika Dasar | Kimia Dasar | Menggambar Teknik | Statika Struktur | Ibadah, akhlak dan muamalah | Bahasa Arab | Bahasa Indonesia | Pengantar Teknologi Informasi | Matrik dan Vektor | Fisika Teknik | Menggambar Mesin (+Praktkum CAD) | Material Teknik | Struktur dan Sifat Material | Konsep Rekayasa | Islam dan Ipteks | Kewarganegaraan | Pengantar Ilmu Lingkungan | Program Web Berbasis CMS | Kalkulus Lanjut | Thermodinamika | Mekanika Kekuatan Material | Metrologi Industri | Proses Manufaktur | Kemuhammadiyahan | Perpindahan Kalor dan Massa | Metode Numerik | Dasar sistem thermal | Elemen mesin | Kinematika | Praktikum fisika | Dasar pemrograman komputer | Matematika Teknik | Mekanika Fluida | Dinamika Fluida | Perpindahan kalor dan massa lanjut | Metode elemen hingga | Teknik otomasi | Teknik pembentukan | CAM dan CAE | Sistem transmisi | Dinamika teknik | Praktikum material | Praktikum proses manufaktur | Keterampilan berkehidupan (life skill) | Teknik tenaga listrik | Mekatronika | Praktikum mekanika fluida | Praktikum perpindahan kalor dan massa | Motor pembakaran dalam | Mekanika getaran dan kebisingan | Mesin konversi energi | Design project | MK Pilihan Wajib I | Teknologi mesin pertambangan | Metode penelitian dan statistik | Engineering sustainability | Manajemen operasi | Praktek kerja nyata | MK Pilihan Wajib II | MK Pilihan Tambahan | Seminar proposal tugas akhir | Technopreneurship | Tugas akhir | Keterangan | |
4 | 1 | Muhammad Safarudin Ajeng | 2011102442002 | 90:00:00 | 81:00:00 | 80:00:00 | 88:00:00 | 83:30:00 | 77:11:00 | 87:50:00 | 68:00:00 | 75:00:00 | 84:00:00 | 88:00:00 | 85:00:00 | 70:00:00 | 74.93 | 91.81 | 73.81 | 76:50:00 | 77.64 | 72:03:00 | 75:00:00 | 77:00:00 | 81:00:00 | 93:00:00 | 85:00:00 | 80:40:00 | 78:50:00 | 75:57:00 | 77:58:00 | 86:00:00 | 73.93 | 70:27:00 | 76:53:00 | 81:00:00 | 70:50:00 | 77.70 | 70:00:00 | 73.80 | 64.82 | 71:00:00 | 73:50:00 | 71:57:00 | 74:57:00 | 85:00:00 | 90:00:00 | 76:00:00 | 82:00:00 | 78:50:00 | 72.75 | 83:00:00 | 77:50:00 | 75:10:00 | 73:00:00 | 79:50:00 | 70.73 | 80:00:00 | 76:26:00 | 75:00:00 | Polimer, Keramik dan Komposit 90.57 | 77.70 | 75:30:00 | 76.75 | 77.80 | 85:55:00 | Sistem Energi Baru Dan Terbarukan 72.00 | Permesinan Non-Konvensional 70.07 | 80:00:00 | 78.90 | 80:00:00 | OK | |
5 | 2 | Muhammad Taufik Sapriadi | 2011102442069 | 90.00 (A) | 79.00 (AB) | 70.00 (B) | 91.00 (A) | 75.00 (AB) | 80.39 (A) | 86.00 (A) | 75.00 (AB) | 67.00 (BC) | 91.00 (A) | 95.00 (A) | 85.00 (A) | 88.19 (A) | 97.28 (A) | 93.14 (A) | 80.71 (A) | 77.64 (AB) | 77.07 (AB) | 74.74 (B) | 80.00 (A) | 79.00 (AB) | 88.00 (A) | 72.00 (B) | 76.13 (AB) | 78.30 (AB) | 78.50 (AB) | 75.57 (AB) | 75.28 (AB) | 85.00 (A) | 71.13 (B) | 75.63 (AB) | 75.44 (AB) | 79.00 (AB) | 81.50 (A) | 83.99 (A) | 70.00 (B) | 77.00 (AB) | 51.77 (D) | 61.29 (C) | 81.50 (A) | 65.57 (BC) | 78.57 (AB) | 75.86 (AB) | 90.00 (A) | 76.00 (AB) | 80.00 (A) | 78.36 (AB) | 87.50 (A) | 40.00 (E) ,namun di website life skill (B) | 79.50 (AB) | 76.77 (AB) | 75.0) (AB) | 79.50 (AB) | 76.00 (AB) | 75.00 (AB) | 76.26 (AB) | 67.10 (BC) | Sistem Manufaktur Fleksibel (82.79) | 75.87 (AB) | 63.65 (BC) | 75.81 (BC) | 73.80 (AB) | Sedang PKN | Sistem Energi Baru dan Terbarukan (74.79) | Permesinan Non-Konvensional (78.07) | Belum melaksanakan | 75.80 (AB) | Belum melaksanakan | ok (mengulang life skill) | |
6 | 3 | Rijal Falaqi Muhammad | 2011102442012 | A | A | A | AB | A | A | A | AB | AB | A | A | A | A | A | A | A | AB | AB | BC | AB | AB | B | B | B | A | AB | B | C | A | B | D | B | A | BC | A | B | C | AB | B | B | B | B | A | A | AB | AB | AB | AB | B | AB | D | AB | AB | AB | AB | AB | A | Ini Mata kuliah konsentrasi Ada 2 di semester 6. 1. Sistem manufaktur fleksibel ( AB) 2. Polimer, keramik dan komposit ( A) | A | BC | D | AB | A | Sistem energi baru dan terbarukan ( B) | Pemesinan Non Konvesional ( E) | - | BC | - | MK nilai D masih 3, E masih 1 dapat mengambil seminar proposal skripsi saja | |
7 | 4 | Bagus Prasetiyo | 2011102442008 | AB | A | A | AB | A | AB | A | A | B | A | A | A | B | C | A | AB | AB | A | BC | AB | B | A | B | C | AB | AB | AB | A | A | B | C | B | A | B | A | B | C | BC | B | A | C | C | B | A | AB | AB | AB | C | E | AB | C | B | AB | AB | AB | B | B | Management alat berat dan project nilai, A | A | C,tapi jika dibuka di semester 9 ini akan di ambil untuk perbaikan nilai | B | BC | SKS nya di ambil di semester berjalan | Sistem hidrolik dan penggerak alat berat nilai, A | Sistem kelistrikan alat berat nilai, A | SKS di ambil di semester berjalan | AB | SKS di ambil di semester berjalan | ok (mengulang life skill) | |
8 | 5 | Krisna Budi Kurniawan | 2011102442007 | 96:00:00 | 78.65 | 70:00:00 | 91:00:00 | 91.60 | 84:55:00 | 88:50:00 | 77:57:00 | 81:50:00 | 87:00:00 | 88:00:00 | 84:00:00 | 87.76 | 76:00:00 | 90:17:00 | 80:11:00 | 77:57:00 | 80:50:00 | 74:34:00 | 75:00:00 | 83:00:00 | 84:00:00 | 81:00:00 | 78:47:00 | 80.64 | 79:50:00 | 74.86 | 76.95 | 86:00:00 | 73:14:00 | 80.80 | 77.84 | 80:00:00 | 79:50:00 | 88:07:00 | 70:00:00 | 84.97 | 66:54:00 | 70:29:00 | 73.80 | 71:57:00 | 74:57:00 | 85:00:00 | 90:00:00 | 76:00:00 | 80:00:00 | 77:36:00 | 82:10:00 | 73:00:00 | 77:50:00 | 81:49:00 | 73:00:00 | 79:50:00 | 72:00:00 | 73:00:00 | 76:26:00 | 83.60 | POLIMER, KERAMIK DAN KOMPOSIT 90.57, SISTEM MANUFAKTUR FLEKSIBEL 90.29 | 77.69 | 84.80 | 81:43:00 | 70.80 | 89:15:00 | SISTEM ENERGI BARU DAN TERBARUKAN 75.57, | PERMESINAN NON-KONVENSIONAL 80.00, PEMBANGKIT ENERGI SURYA 75.10 | 80:40:00 | 77:00:00 | 86:00:00 | ||
9 | 6 | Eko Dandi Saputra | 2011102442067 | B | AB | AB | C | D | D | A | BC | C | B | A | A | A | C | BC | AB | AB | A | B | AB | A | B | B | B | AB | AB | AB | D | A | B | C | B | A | C | A | B | B | AB | B | B | BC | B | AB | A | AB | A | AB | AB | B | AB | B | AB | AB | AB | AB | B | B | Polimer,keramik dan komposit (AB) . Sistem Manufaktur Fleksibel (A) | A | BC | B | BC | AB | Belum Mengambil | Belum Mengambil | Belum Mengambil | AB | Belum Mengambil | belum bisa skripsi selesaikan MK mengulang dan MK pilihan MKDU nilai min. B | |
10 | 7 | Achmad Fauzi | 2011102442009 | 88:00:00 | 72:00:00 | 82:00:00 | 80:00:00 | 61:00:00 | 63:26:00 | 88:50:00 | 70:50:00 | 67:00:00 | 81:00:00 | 91:00:00 | 88:00:00 | 83:00:00 | 70:56:00 | 61.64 | 71:59:00 | 80:00:00 | 79:14:00 | 67:00:00 | 75:00:00 | 87:00:00 | 70:00:00 | 83:00:00 | 61:00:00 | 74.89 | 81:50:00 | 74.79 | 63.97 | 87:00:00 | 73.93 | 64:47:00 | 73.93 | 75:00:00 | 79:50:00 | 83:50:00 | Akan di ambil di semester depan | 69:00:00 | 38:32:00 | 66.69 | 73.93 | 70:37:00 | 74:57:00 | 71.86 | 70:00:00 | 76:00:00 | 60:00:00 | 76:36:00 | 75:45:00 | 40:00:00 | 79:50:00 | 73.67 | 73:00:00 | 79:50:00 | 78:00:00 | 76:00:00 | 73.83 | 84.60 | tidak ada | 75.87 | 69:40:00 | 77:31:00 | 69:00:00 | akan di ambil di smster ini | Sistem hidrolik dan penggerak alat berat nilai : 85.00 | Sistem kelistrikan alat berat nilai : 85.00 dan Managemen Alat berat dan project nilai : 81.00 | akan di ambil di semester depan | 76:00:00 | akan di ambil di semester depan | ok (mengulang life skill) + MK pilihan perhatikan SKS lulus 144 SKS | |
11 | 8 | Muhammad Jeffri Saputra | 2011102442078 | B (74.00) Lulus | AB (77.00) Lulus | B (70) Lulus | A (86.00) Lulus | A (91.60) Lulus | C (60.51) Lulus | A (84.50) Lulus | AB (77.50) | A (80.00) | A (89.50) Lulus | A (86.00) Lulus | A (82.10) Lulus | A (86.00) Lulus | B (74.45) Lulus | BC (69.30) Lulus | B (71.66) | AB (78.50) Lulus | AB (77.64) Lulus | B (73.34) Lulus | AB (75.00) | AB (77.00) | AB (76.00) | A (85.00) | B (72.13) | AB (78.80) | AB (77.50) | AB (75.29) | BC (68.42) | A (85.00) | AB (75.11) | BC (65.93) | B (71.70) | A (80.00) | B (71.50) | A (83.50) | B (70.00) | C (62.34) | D (58.29) | C (60.99) | AB (79.59) | BC (67.57) | B (74.57) | AB (75.86) | A (90.00) | A (80.00) | AB (76.00) | AB (78.36) | BC (67.75) | B (73.00) | AB (77.50) | AB (75.67) | AB (73.00) | AB (79.50) | AB (78.00) | AB (76.00) | AB (75.04) | B (73.22) | Tidak ada | AB (75.87) | BC (66.10) | AB (79.75) | AB (78.50) | Akan ambil di semester 9 | Sistem hidrolik dan penggerak alat berat A (82.00) | 1.Sistem Kelistrikan Alat berat A(83.00) 2. Management Alat berat dan projects A(81.00) | Akan di ambil semester 9 | A (80.80) | Akan di ambil semester 9 | ok (mengulang life skill) + MK pilihan perhatikan SKS lulus 144 SKS | |
12 | 9 | Nur alam | 2011102442074 | B | B | AB | A | C | C | A | C | E | AB | AB | AB | AB | D | E | C | AB | A | BC | B | B | AB | B | D | B | AB | AB | E | AB | AB | D | B | A | AB | D | B | BC | E | BC | A | C | C | B | A | AB | AB | AB | AB | C | AB | C | AB | B | A | AB | B | D | POLIMER, KERAMIK DAN KOMPOSIT (B) | AB | E | A | E | - (Namun sudah magang) | ENERGI BARU TERBARUKAN (B) | Islam dan iptek B, mekanika fluida l E, proses manufaktur E | - belum diambil | BC | Belum | Tidak bisa skripsi selesaikan dulu MK nilai D dan E | |
13 | 10 | Muh Faisal kiman | 2011102442028 | AB | B | B | A | C | C | AB | B | BC | A | A | A | AB | C | A | B | AB | AB | BC | AB | AB | AB | AB | C | AB | A | B | AB | A | B | AB | B | A | BC | A | B | C | B | B | AB | BC | C | B | A | AB | AB | AB | B | E | AB | C | AB | AB | A | AB | B | B | (Managemen alat berat dan project). A | A | D (ingin pengambilan matkul kalau dibuka disemester ini) | BC | BC | Pengambilan mata kuliah disemester ini | (Sistem hidrolik dan penggerak alat berat) A | (Sistem kelistrikan alat berat) A | Sks sedang berjalan | B | Sks sedang berjalan | ok (mengulang life skill) | |
14 | 11 | MUHAMMAD ABDI HAIRULLAH | 2011102442022 | 92 | 80 | 83 | 89 | 91.60 | 77:50:00 | 86:50:00 | 77:50:00 | 72 | 92 | 97 | 90 | 77 | 74:17:00 | 91:29:00 | 69:02:00 | 77:07:00 | 80:50:00 | 76:24:00 | 80 | 86 | 80 | 93 | 72.67 | 84.84 | 79:50:00 | 74:07:00 | 78:12:00 | 85 | 73:43:00 | 78.60 | 74.73 | 82 | 73:50:00 | 72:25:00 | 70 | 74:07:00 | 71:29:00 | 77:29:00 | 80.70 | 70:37:00 | 74:57:00 | 75.86 | 90 | 80 | 80 | 78:36:00 | 70.95 | 86 | 79:50:00 | 69:27:00 | 75 | 79:50:00 | 80 | 78 | 75:04:00 | 71:50:00 | SISTEM ENERGI BARU DAN TERBARUKAN ( 75.50) | 75:57:00 | 70:50:00 | 80:50:00 | 81.80 | DIAMBIL SEMESTER BERJALAN ( SEMESTER 9 ) | PEMBANGKIT ENERGI SURYA ( 75.10 ) | POLIMER, KERAMIK DAN KOMPOSIT ( 80.57 ) | DIAMBIL SEMESTER BERJALAN ( SEMESTER 9 ) | 76 | DIAMBIL SEMESTER BERJALAN ( SEMESTER 9 ) | ok | |
15 | 12 | Fanny Dody Darmawan | 2011102442030 | B | B | AB | E | A | E | A | A | AB | A | A | AB | B | C | B | AB | AB | AB | BC | AB | A | A | AB | A | B | AB | AB | C | B | B | B | B | A | BC | A | B | BC | AB | D | AB | B | C | B | C | AB | AB | AB | AB | E | AB | C | AB | AB | A | AB | B | B | - Polimer dan komposit (A) - sistem manufaktur fleksibel (A) | AB | BC | AB | BV | Belum ambil MKnya | Belum ambil MKnya | Belum ambil MKnya | Belum ambil MKnya | C | Belum ambil MKnya | Tidak bisa skripsi selesaikan dulu MK nilai D dan E dan MK pilihan | |
16 | 13 | Muhammad Andre Safardiansyah | 2011102442031 | B | A | A | A | A | AB | A | B | C | A | A | A | A | BC | BC | A | A | AB | BC | A | AB | A | A | C | B | AB | B | A | A | B | BC | B | A | BC | A | B | B | AB | C | AB | B | A | (MENGAMBIL SEMESTER INI) | AB | AB | B | B | AB | (E) mengulang semester ini | AB | C | AB | AB | (belum mengambil. Mengambil semester ini) | AB | B | A | POLIMER KERAMIK DAN KOMPOSIT (B) | AB | BC | A | A | A | SISTEM MANUFAKTUR FLEKSIBEL (AB) | MENGAMBIL SEMESTER INI | Mengambil semester ini | A | Mengambil semester ini | ok (mengulang life skill) | |
17 | 14 | alfiansyah | 2011102442061 | ab | ab | a | a | ab | b | a | ab | bc | ab | a | a | ab | bc | a | a | ab | ab | bc | ab | a | a | a | a | ab | ab | b | b | a | a | b | ab | a | b | a | b | c | d | b | ab | a | b | a | a | a | ab | b | a | e | ab | c | ab | ab | a | ab | ab | a | polime,keramik dan komposit (Ab) | ab | ab | b | a | ab | sistem hidrolik dan penggerak alat berat (a) sistem kelistrikan alat berat (a) | manajemen alat berat dan project (a) | ab | d | e | ok (mengulang life skill) | |
18 | 15 | Fachrul Rasyid | 2011102442016 | AB | A | A | A | A | A | A | A | BC | A | A | A | A | AB | A | AB | AB | A | BC | A | A | A | A | A | A | A | AB | AB | A | B | D | B | AB | B | A | B | BC | BC | AB | B | C | B | A | A | AB | AB | AB | BC | A | AB | B | AB | AB | BC | AB | AB | BC | Sistem Hidrolik Dan Penggerak Alat Berat (A) | A | B | B | BC | A | Sistem Keliatrikan Alat Berat (A) | Managemen Alat Berat Dan Project (A) | Sedang mengambil Semester Ini | B | Sedang Mengambil Semester Ini | ok | |
19 | 16 | muhammad dimas adjie | 2011102442038 | AB | A | AB | B | C | b | A | B | Bc | B | B | B | AB | Semster 2 (E Kode TME1106) Semester 4 (E kode TME1061) Semester 6 (BC kode TME2062) | Semester 2( (E Kode TME 1107) Semester 4 (C Kode TME 1017) Semester 8 (Bc kode TME1107 | Semester 2 (E kode TME1108) Semester 4 (E kode TME1081) Semester 8 ( B kode TME 1108 | B | A | C | B | B | A | B (baru mengambil di semester 7 dan tidak ada mengulang) | D | B | AB | B | Semester 3 (E kode TME2116) semester 7 (A kode TME2116) | Semester 4 (E kode UNI2102) Semester 8 (A kode UNI2102) | B | C | tidak mengambil | A | tidak mengambil karena tidak mencukupi minimum sks pada masanya | Semester 4 (E kode TME2122) Semester 8( A KODE TME2122) | B | tidak mengambil karena tidak mencukupi minimum sks pada masanya | AB | Semester 5 (E KODE 3126) Semester 7 (B Kode 3126) | AB | C | Tidak mengambil (karena tidak mencukupi minum sks) | B | B | AB | AB | AB | A | E dan masih mengulang di semester 8 | AB | B | AB | AB | A | AB | B | AB | Polimer, keramik dan komposit (B) | AB | C | AB | A | Sedang PKN di semester 9 | Sistem hidrolik dan penggerak alat berat (A), Sistem kelistrikan alat berat (A), | managemen alat berat (A) | belum mengambil | BC | belum mengambil | tidak bisa ambil dulu semua MK wajib yg belum diambil | |
20 | 17 | ABIYU KURNIA SARIFFUDDIN | 2011102442080 | A (82.00) | AB (77.00) | A (81.00) | A (95.75) | A (89.10) | B (71.41) | AB (76.50) | B (73.00) | B (72.00) | A (82.00) | A (84.00) | A (88.00) | AB (79.00) | D (54.58) | BC (69.33) | AB (77.56) | AB (78.57) | AB (77.64) | AB (76.44) | AB (75.00) | AB (76.00) | B (72.00) | A (81.00) | B (70.33) | B (73.52) | AB (77.50) | AB (77.00) | B (70.05) | A (84.00) | AB (72.43) | B (70.00) | Ab (75.73) | A (80.00) | C (64.00) | A (83.50) | B (70.00) | C (61.94) | D (51.07) | C (60.69) | AB (79.60) | B (70.77) | B (74.57) | AB (75.86) | A (80.00) | A (80.00) | AB (76.00) | AB (78.36) | BC (68.70) | E (40.00) | AB (77.50) | BC (67.84) | B (73.00) | AB (79.50) | AB (78.00) | AB (76.00) | B (74.74) | AB (75.00) | Polimer,keramik dan komposit B (72.76). Sistem Manufaktur fleksibel B (71.99) | AB (77.09) | BC (69.96) | B (72.43) | AB (76.50) | Akan di ambil semester 9 | Sistem Hidrolik dan Penggerak alat berat A (83.00) Sistem Kelistrikan Alat Berat A (82.00) | Sistem Hidrolik dan Penggerak alat berat A (83.00) Sistem Kelistrikan Alat Berat A (82.00) | Akan diambil semester 9 | C 63.80) | Akan diambil semester 9 | ok | |
21 | 18 | Kholiq Febriansyah | 2011102442051 | 90 | 80 | 98 | 92 | 75 | 95.97 | 86 | 75 | 82 | 94 | 96 | 89 | 77 | 98.66 | 92:38:00 | 79:51:00 | 77:14:00 | 80:05:00 | 72:44:00 | 80 | 85 | 79 | 86 | 71:13:00 | 80:18:00 | 78:05:00 | 76:29:00 | 84.78 | 86 | 71.93 | 81:07:00 | 78.64 | 80 | 78:05:00 | 80.72 | 70 | 80:33:00 | 69:32:00 | 71 | 81:05:00 | 67:57:00 | 78:57:00 | 87:05:00 | 90 | 76 | 80 | 78:36:00 | 81:05:00 | 88 | 79:05:00 | 69:17:00 | 73 | 79:05:00 | 72 | 78 | 75.96 | 84:06:00 | Polimer, keramik dan komposit (90.57) dan Sistem Manufaktur Fleksibel (82.79) | 76:29:00 | 91 | 87:25:00 | 89 | 83:55:00 | Sistem energi baru dan Terbarukan (73.5) | Permesinan Non-Konvensional (74.07) | 80 | 85:09:00 | 81 | ||
22 | 19 | Adi Jaya | 2011102442054 | 92 | 77.45 | 90 | 91 | 75 | 95.6 | 83.5 | 77.5 | 81 | 89 | 95 | 89 | 75 | 95.85 | 92.95 | 81.66 | 75.71 | 79.07 | 74.16 | 82 | 85 | 80 | 89 | 97 | 88.94 | 81.5 | 76.29 | 92.92 | 85 | 80.03 | 88.3 | 81.84 | 82 | 80.5 | 87.92 | 70 | 87.8 | 62.82 | 71 | 81.5 | 71.57 | 78.57 | 85 | 90 | 78 | 80 | 78.36 | 81.5 | 82 | 79.5 | 86.83 | 73 | 79.5 | 72 | 76 | 75.65 | 83.6 | Polimer, Keramik, dan Komposit (90,57) dan Sistem Manufaktur Fleksibel (90,29) | 76.37 | 90.5 | 86.37 | 84.8 | 84.7 | Sistem Energi Baru dan Terbarukan (75,5) | Pemesinan Non-Konvensional (72,07) dan Pembangkit Energi Surya (75,1) | 80 | 83.9 | 79 | ||
23 | 20 | Ismael | 2011102442073 | 87:00:00 | 75:00:00 | 80:00:00 | 81:00:00 | 75:00:00 | 71:47:00 | 86.67 | 74:00:00 | 62:00:00 | 82:00:00 | 88:00:00 | 89:10:00 | 86:00:00 | 90.78 | 92.83 | 76:00:00 | 77:07:00 | 79:07:00 | 72:34:00 | 75:00:00 | 85:00:00 | 70:00:00 | 86:00:00 | 81:00:00 | 76.69 | 79:00:00 | 72.79 | 72.91 | 86:00:00 | 75:10:00 | 72:27:00 | 74:01:00 | 85:00:00 | 77:50:00 | 83:50:00 | 70:00:00 | 69.67 | 70:59:00 | 70:29:00 | 73:50:00 | 70.77 | 78:57:00 | 75.86 | 90:00:00 | 80:00:00 | 80:00:00 | 76:36:00 | 73.75 | 72:00:00 | 79:50:00 | 65:03:00 | 75:00:00 | 79:50:00 | 78:00:00 | 75:00:00 | 74:14:00 | 71:50:00 | Polimer,karamik dan komposit (78.76), sistem manufaktur fleksibel (82.79) | 76:17:00 | 70:08:00 | 80:05:00 | 81:08:00 | Mata kuliah baru di ambil di semester ini | Sistem energi baru dan terbarukan (69.71) | Permesinan Non-konvensional (72.57) | Mata kuliah baru di ambil di semester ini | 71:00:00 | Mata kuliah baru di ambil di semester ini | ok | |
24 | 21 | Irfan Maulana | 2011102442047 | 75.00 (Ab) | 77.00 (ab) | 72.00 (ab) | 80.00 (ab) | 85.00 (A) | 79.61(ab) | 86.67 (a) | 77.50 (ab) | 80.00 (a) | 85.85 (a) | 86.00 (a) | 78.70 (ab) | 86.00 (a) | 75 (ab) | 84.43 (a) | 76 (ab) | 77.14 (ab) | 80.57 (a) | 74 (b) | 75 (ab) | 79 (ab) | 79 (ab) | 87 (a) | 76 (ab) | 74 (b) | 81 (a) | 74 (b) | 65 (b) | 85 (a) | 74 (b) | 71 (b) | 77 (ab) | 84 (a) | 69 (bc) | 83 (a) | 70 (b) | 66 (bc) | 69 (bc) | 76 (ab) | 71 (b) | 70 (B) | 74 (b) | 71 (b) | 90 (a) | 80 (a) | 78 (ab) | 76 (ab) | 70 (b) | 77 (ab) | 79 (ab) | 61 (c) | 73 (b) | 79 (ab) | 80 (a) | 76 (ab) | 74 (b) | 67 (bc) | Managemen alat berat dan project nilai = 83 sistem hidrolik dan penggerak alat berat nilai = 82 sistem kelistrikan alat berat nilai = 82 | 77 (ab) | 75 (ab) | 75(ab) | 77 (ab) | 81 (a) | Sistem hidrolik dan penggerak alat berat nilai = 82 sistem kelistrikan alat berat nilai= 82 managemen alat berat dan project nilai= 83 | Pembangkit energi Surya nilai = 75 | Diambil semester ini | 66 (c) | Diambil semester ini | ok | |
25 | 22 | M. Afif Fauzan | 2011102442006 | A | AB | A | A | A | C | A | B | B | A | A | A | A | A | A | AB | AB | AB | BC | AB | AB | A | A | BC | AB | AB | B | A | A | AB | A | AB | A | AB | B | B | BC | C | C | B | BC | AB | AB | A | AB | AB | AB | A | B | AB | B | B | AB | B | B | AB | A | Polimer, Keramik dan Komposit (A), Sistem Manufaktur Fleksibel (AB) | AB | A | A | A | A | Sistem Energi Baru dan Terbarukan (B) | Permesinan Non-Konvensional (B) | A | AB | AB | ||
26 | 23 | Muhammad Gilang Firmansyah | 2011102442004 | A | A | A | A | A | A | A | C | BC | A | A | AB | A | A | AB | B | AB | AB | B | AB | AB | A | A | C | B | A | B | A | A | A | AB | AB | A | AB | AB | B | C | AB | C | B | BC | B | B | A | AB | AB | AB | AB | AB | AB | BC | B | AB | B | B | AB | A | Polimer, Keramik dan Komposit (A), Sistem Manufaktur Fleksibel (A) | AB | A | A | A | A | Sistem Energi Baru dan Terbarukan (B) | Pemesinan Non-Konvensional (B) | AB | AB | A | ||
27 | 24 | Boby Darmawan Burhan | 2011102442052 | 88 (A) | 87 (A) | 87 (A) | 75 (AB) | 75 (AB) | 66,55 (BC) | 84 (A) | 64 (C) | 67 (BC) | 88 ( A) | 95 (A) | 80 (A) | 85 (A) | 53,50 (D) | 90,52 (A) | 73,01 ( B) | 75 (AB) | 79 (AB) | 70 ( B) | 75 (AB) | 76 (AB) | 82 (A) | 77 (AB) | 81 (A) | 80 (A) | 77 (AB) | 74 (B) | 64 (C) | 84 (A) | 75,64 (AB) | 64,10 (BC) | 74,01 (B) | 85 (A) | 79,50 (AB) | 83,50 (A) | 70 (B) | 63,13 (C) | 66,83 (BC) | 60,99 (C) | 80,70 (A) | 70,77 (B) | 60,57 (C) | 75,86 (AB) | 90 (A) | 80 (A) | 80 (A) | 75,50 (AB) | 75,45 (AB) | Belum mengambil | 79,50 (AB) | 61,79 (C) | 73 (B) | 79,50 (AB) | 80 (A) | 78 (AB) | 75,04 (AB) | 75,10 (AB) | (Sistem hidrolik dan Penggerak Alat berat, 82 (A)),(Sistem kelistrikan alat berat, 82 (A)), ( Managemen Alat berat dan project, 81 (A)) | 77 (AB) | 82,20 (A) | 80,37 (A) | 79 (AB) | Diambil pada semester 9 ( Mahasiswa OJT) | Sistem manufaktur fleksibel, 78,93 (AB) | Pembangkit energi surya, 75,10 (AB) | Diambil pada semester 9 (Mahasiswa OJT) | 82 (A) | Diambil pada semester 9 (Mahasiswa OJT) | ok (mengulang life skill) | |
28 | 25 | Muhammad Akmal | 2011102442020 | A | A | B | B | A | E (mengamhil smstr ini ) | A | B | C | A | A | A | B | BC | A | BC | AB | A | BC | AB | A | B | Ambil semester ini | BC | B | A | AB | C | A | BC | C | AB | A | C | A | B | C | C | BC | A | BC | B | AB | A | AB | AB | AB | BC | E ( ambil smester ini ) | AB | BC | AB | AB | A | AB | B | BC | Sistem hidrolik alat berat (A), sistem kelistrikan alat berat (A), managemen alat berat dan project(A) | A | BC | B | BC | Ambil semesrer ini 9 | Managemen Alat berat new project (A) kelistrikan alat berat (A) hidrolik alat berat (A) | Ambil semester ini 9 | B | Ambil semester ini 9 | perhatikan MK pilihan tambahan wajib diambil | ||
29 | 26 | Donny prasetyo budi | 2011102442039 | 73,00 (B) | 75.45 (AB) | 78,00 (AB) | Mengulang | 1,00 (E) | Mengulang | 83,50 (A) | 74,00 (AB) | 55,00 (D) | 84,00 (A) | 94,00 (A) | 91,00 (A) | 82,00 (A) | 76,50 (AB) | Mengulang | 72,00 (B) | 78,50 (AB) | 77,07 (AB) | 71,24 (B) | 76,00 (AB) | Mengulang | Mengulang | 70,00 (B) | Belum ambil | 73,87 (B) | 77,00 (AB) | 75,56 (AB) | 57,39 (D) | 72,95 (B) | 70,64 (B) | 65,93 (BC) | 74,73 (B) | 80,00 (A) | 71,50 (B) | Belum ambil | Belum ambil | 63,04 (C) | Belum ambil | 61,59 (C) | 79,60 (AB) | 63,50 (C) | 61,57 (C) | 71,86 (B) | 90,00 (A) | 78,00 (AB) | 76,00 (AB) | 78,36 (AB) | 63,20 (C) | 40,00 (E) | 77,50 (AB) | 65,89 (BC) | 75,00 (AB) | 79,50 (AB) | 80,00 (A) | 78,00 (AB) | 73,22 (B) | 64,50 (C) | Sistem manufaktur fleksibel 80,00 (A) | 75,99 (AB) | Belum ambil (ambil disemester 9) | 84,60 (A) | 70,72 (B) | Belum ambil (ambil disemester 9) | Sistem manufaktur fleksibel 80,00 (A) | Teknologi kendaraan listrik dan fuel cel 75,10 (AB) | Belum ambil | 75,10 (AB) | Belum ambil | tidak bisa ambil dulu semua MK wajib yg belum diambil | |
30 | 27 | Muhammad rizky nur saputra | 2011102442026 | A | B | B | A | A | B | A | AB | C | A | A | A | A | C | BC | AB | A | AB | BC | A | A | A | A | D | AB | AB | AB | C | A | B | C | B | A | B | A | B | C | AB | B | E (Mengambil mengulang di semester 9) | B | BC | C | AB | C | C | AB | E (Mengambil mengulang di semester 9) | E (Mengambil mengulang di semester 9) | E ( Mengambil mengulang dikonversi semester9) | B | AB | BC | A | AB | B | C | Sistem manufaktur fleksibel (BC) | AB | BC | C | BC | Mengambil di semester 9 dan sudah mengikuti Prakter Kerja Nyata | Tidak ada | Tidak ada | Mengambil di semester 9 | B | Mengambil di semester 9 | Tidak bisa skripsi selesaikan dulu MK nilai D dan E | |
31 | 28 | Riyan Abdillah | 2011102442024 | (A) 80.00 | (A) 88.00 | (A) 82.00 | (AB) 75.00 | (8) 83.30 | (A) 82.25 | (A) 86.00 | (B) 73.00 | (BC) 67.00 | (A) 81.60 | (A) 94.00 | (A) 80.00 | (A) 85.00 | (C) 62.13 | (BC) 69.30 | (AB) 75.01 | (AB) 78.57 | (A) 80.50 | (B) 71.94 | (AB) 75.00 | (AB) 79.00 | (AB) 77.00 | (A) 84.00 | (B) 71.63 | (B) 73.89 | (AB) 79.50 | (AB) 76.29 | (C) 63.73 | (A) 85.00 | (BC) 69.71 | (AB) 75.13 | (B) 72.41 | (A) 84.00 | (AB) 79.50 | (A) 83.50 | (B) 70.00 | (C) 62.10 | (AB) 77.90 | (B) 73.29 | (A) 81.70 | (B) 70.77 | (B) 72.57 | (B) 71.86 | (A) 90.00 | (AB) 78.00 | (AB) 78.00 | (AB) 76.21 | (BC) 67.95 | (E) 40.00 | (AB) 78.00 | (B) 71.30 | (AB) 75.00 | (BC) 68.21 | (A) 80.00 | (AB) 78.00 | (B) 74.13 | (B) 70.00 | (Polimer, Keramik dan Komposit A 80.57) - (Sistem Manufaktur Fleksibel B 71.43) | (A) 80.19 | (A) 82.00 | (B) 72.25 | (BC) 66.72 | (Lagi diambil sekarang) - (Dan sudah melaksanakan magang OJT) | (Sistem Hidrolik dan Penggerak Alat Berat A 82.00) - (Sistem Kelistrikan Alat Berat A 82.00) | (Managemen Alat Berat dan Project A 82.00) | (Lagi diambil sekarang) | (AB) 77.50 | (Lagi diambil sekarang) | ok | |
32 | 29 | Mijan | 2011102442015 | A | B | A | A | A | A | A | AB | AB | A | A | A | A | A | A | B | A | AB | B | A | A | A | A | AB | A | AB | B | BC | A | AB | D | AB | B | BC | A | B | BC | C | B | A | B | B | A | A | A | AN | AB | C | E | AB | B | AB | AB | AB | AB | B | A | AB | C | B | BC | A | Manajemen operasi BC | Teknologi mesin pertambangan AB, sistem hidrolik dan penggerak alat berat A, sistem kelistrikan alat berat A, management alat berat dan project A. | Ska sedang diambil semester 9 | C | Sks sedang diambil semester 9 | ok mengambil MK pilihan perhatikan SKS lulus 144 SKS | ||
33 | 30 | Ilham maulana | 2011102442044 | A | AB | A | A | A | AB | A | A | B | A | AB | A | A | C | A | AB | AB | AB | BC | AB | AB | AB | A | BC | B | AB | AB | C | A | B | BC | B | A | C | A | B | C | BC | BC | A | C | B | B | A | AB | A | AB | BC | E | AB | C | AB | AB | A | AB | B | A | Sistem energi terbarukan B | AB | B | AB | B | A | Sistem kelistrikan alat berat A | Sistem hidrolik dan penggerak alat berat A | SKS sedang berjalan | BC | SKS sedang berjalan | ok | |
34 | 31 | Achmad aulia | 2011102442053 | A | A | B | B | A | AB | A | C | BC | AB | B | AB | A | B | B | B | AB | AB | C | AB | A | A | A | C | B | A | B | AB | A | B | C | B | A | AB | A | B | C | AB | B | AB | B | B | B | A | AB | AB | AB | B | E | AB | C | B | AB | A | AB | AB | B | Management Alat Berat dan Project (A) | A | C | B | AB | Sks Berjalan | Sistem Hidrolik Dan Penggerak Alat Berat (A) | Sistem Kelistrikan Alat Berat (A) | Ambil di Semster 9 | B | Ambil di semester 9 | ok (mengulang life skill) | |
35 | 32 | Rizky Ramadhan | 2011102442048 | A | A | A | A | AB | AB | B | BC | B | A | A | A | A | C | BC | BC | A | A | BC | AB | B | A | A | C | AB | A | AB | AB | A | B | BC | B | B | BC | A | B | C | D | B | A | B | B | AB | AB | A | A | AB | BC | B | AB | C | B | AB | A | AB | B | A | Polimer keramik dan komposit(A), sistem manufaktur fleksibel(A) | AB | BC | B | A | SKS sedang di ambil di semester 9 | Sistem hidrolik penggerak alat berat(A) | Sistem kelistrikan alat berat(A),Managemen alat dan project(A) | SKS sedang di ambil di semester 9 | AB | SKS sedang di ambil di semester 9 | ok | |
36 | 33 | Davi Almujahidin Ali | 2011102442066 | AB | A | B | A | C | C | A | B | B | A | A | A | AB | B | A | B | AB | AB | BC | A | B | B | A | BC | AB | AB | B | A | A | B | E | B | A | B | A | B | D | AB | AB | B | C | C | B | A | AB | AB | B | AB | E | AB | C | AB | AB | A | AB | B | D | MANAJEMEN ALAT BERAT DAN PROJECT A | AB | D | AB | BC | SKS SEDANG BERJLN | SISTEM HIDROLIK DAN PENGGERAK ALATR BERAT (A) | SISTEM KELISTRIKAN ALAT BERAT (A) | SKS BERJALAN | D | SKS BERJALAN | hanya bisa mengambil seminar proposal skripsi masih ada metode numerik E (dan dibuka di semester genap) | |
37 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
38 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
39 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
40 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
41 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
42 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
43 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
44 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
45 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
46 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
47 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
48 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
49 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
50 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
51 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
52 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
53 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
54 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
55 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
56 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
57 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
58 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
59 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
60 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
61 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
62 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
63 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
64 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
65 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
66 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
67 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
68 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
69 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
70 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
71 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
72 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
73 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
74 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
75 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
76 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
77 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
78 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
79 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
80 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
81 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
82 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
83 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
84 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
85 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
86 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
87 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
88 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
89 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
90 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
91 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
92 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
93 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
94 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
95 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
96 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
97 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
98 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
99 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
100 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||