ABCDEFGHIJKLMNOPQRSTUVWXYZAAABACADAEAFAGAHAIAJAKALAMANAOAPAQARASATAU
1
2
Project Name :
INSPECTION AND TEST PLAN (ITP)
3
Project No. :
MS Ref. No. :
METH-ELEC-01
4
5
Client
Project Manager
Consultant
Contractor
INSTALLATION OF ELECTRICAL WORKS
6
7
8
9
10
11
arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau
12
13
Verifying Party (Legend):
Verification Codes :
14
SC = Subcontractor
H =
Hold Point
- Mandatory - work cannot proceed until inspection activity has been signed-off by relevant party.
ITP Ref. No :
DEC/BQ/ITP/EL/001Rev. 0
15
MC = Main Contractor
W =
Witness Point
- Veryfying Party to witness. Evidence of witness shall be by signature of relevant Inspection Report.
16
CT = Consultant
R =
Review
- Inspection and Test documentation to be presented to Consultant or PM for review.
Date Prepared :
17
PM = Client or PM
S =
Surveillance
- Monitoring of work activities, NO report required.
18
19
20
Item No.Activity DescriptionReference Documents
(Specs/Procedures/Dwgs)
Frequency / Characteristics
to be Verified
Acceptance Criteria / Standard RequirementsVerifying DocumentsVerifying Party
21
SCMCCTPM
22
23
1.0Document Submission
24
1.2Method StatementProject Specification, QCS 2014, IFC DrawingsPrior to start the workApproval of Method StatementApprovalHHR-
25
1.3MaterialProject Specification, QCS 2014, IFC DrawingsPrior to start the workApproval of Material SubmittalProject Specification / Technical Data Sheet / MARHHR-
26
2.0Delivered Material
27
2.1Verification of Delivered MaterialsProject Specification, QCS 2014 Section Prior to start the workEach DeliveryDelivery Note, TDS, MSDS HRR-
28
2.2Storage and Handling of Delivered MaterialProject Specification, QCS 2014 Section Prior to start the workEach DeliveryVisual InspectionHW/SW/S-
29
3.0Electrical installation
30
3.1Installation of Containment works/PVC/GI Conduiting installationProject Specification/QCS 2014 Sec 21 Part 7,8 & 9Every installation area. Prior to cable pulling.As per Approved Method Statement and Shop DrawingWIR and Check ListHHW/S-
31
3.1Installation of Containment works cable tray/trunking installationProject Specification/QCS 2014 Sec 21 Part 7,8 & 9Every installation area. Prior to cable pulling.As per Approved Method Statement and Shop DrawingWIR and Check ListHHW/S-
32
3.2Cable/wires pulling worksProject Specification/QCS 2014 Sec 21 Part 6.3Every installation area. As per Approved Method Statement and Shop DrawingWIR and Check ListHHW/S-
33
3.3Insulation resistance test MeggerProject Specification/QCS 2014 Sec 21 Part 6.2.2, QCS 2014 Sec 21 Part 23.2Prior to Termination to any Equipment.Insulation Resistance Test Result: ≥ 1 MΩ
Continuity Test Result: ≤ 10 Ω
WIR and Check List/Prior to Termination to any Equipment.HHW/S-
34
3.4SMDB/DB/LCP installation & Modification of DB PanelsProject Specification/QCS 2014 Sec 21 Part 2 & 03Every installation area. As per Approved Method Statement and Shop DrawingWIR and Check ListHHW/S-
35
3.5Cable/ Wire dressing & termination/connection.Project Specification/QCS 2014 Sec 21 Part 6.2.2, QCS 2014 Sec 21 Part 23.2Every installation area. As per Approved Method Statement and Shop DrawingWIR and Check ListHHW/S-
36
3.6Final fixtures installationProject Specification/QCS 2014 Sec 21 Part 10,11, & 12Every installation area. As per Approved Method Statement and Shop DrawingWIR and Check ListHHW/S-
37
3.7Final Inspection for tagging / labeling and Circuit Identification of Installed Cables and Wiring devicesProject Specification/QCS 2014 Sec 21 Part 6.2.2, QCS 2014 Sec 21 Part 23.2Every installation area. As per Approved Method Statement and Shop DrawingVisualHHW/S-
38
3.8All system testProject Specifications and QCS 2014Every installation area. As per Approved Method Statement and Shop DrawingVisualHHW/S-
39
3.9All Punch List Signed OffProject Specifications and QCS 2014Every installation area. As per Approved Shop DrawingVisualHHW/S-
40
4.0Testing & Commissioning
41
4.1Testing & Commissioning of ElectricalSystemProject Specifications and QCS 2014Every installation area. As per Approved Method Statement and Shop DrawingWIR and Check ListHHW/S-
42
43
Prepared by (Contractor) :Checked by (Contractor) :
Approved by (Dimensions Engineering Consultant) :
44
Name : FM ELECTRICALS
Name :
Name :
45
Signature :
Date :
Signature :
Date :
Signature :
Date :
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100