DAFTAR HARGA UPAH
13
14
NOJENIS UPAHHARGAHARGAJUMLAH VOLUME SATUAN
REALISASI TAHAP
PENGAJUAN KUMULATIF S/D SAAT INISISA KEBUTUTHANJUMLAH
15
Rp.Rp.LALUSAAT INI
16
17
1 Mandor -
18
2 Kepala Tukang 6
19
3 Tukang Batu 143.933,94 41.173.983 286,06 org-hari - 41.173.983 12
20
4 Tukang Kayu 143.933,94 165.232.439 1.147,97 org-hari - 165.232.439 18
21
5 Tukang Besi / Tukang Pipa 143.933,94 110.238.175 765,89 org-hari - 110.238.175
22
6 Tukang Cat 143.933,94 28.547.771 198,34 org-hari - 28.547.771
23
7 Tukang Las 143.933,94 5.346.693 37,15 org-hari - 5.346.693
25
9 Pekerja 124.080,99 349.296.863 2.815,07 org-hari 14.889.718 14.889.718 334.407.145 14.889.718 60120
26
DAFTAR HARGA BAHAN
27
28
29
NOJENIS BAHAN
30
31
32
A. Bahan Agregat Kasar, Bahan Pelekat dan Bahan Jadi
33
1Pasir Urug 300.000,0 8.922.316 29,74 M3 - 8.922.316
34
2Pasir Pasang 380.000,0 25.197.798 66,31 M3 6.840.000,0 6.840.000 18.357.798 6.840.000 15
35
3Pasir Beton 390.000,0 10.169.461 26,08 M3 2.340.000,0 2.340.000 7.829.461 2.340.000 5
37
5Batu Kali / Belah Belah 370.000,0 12.846.652 34,72 M3 4.440.000,0 4.440.000 8.406.652 4.440.000
39
7Batu Kerikil / Split 2/3 cm 420.000,0 15.957.674 37,99 M3 7.560.000,0 7.560.000 8.397.674 7.560.000 5
40
8Bata Merah Bakar Kelas I 900,0 22.330.515 24.811,68 Bh 13.500.000,00 13.500.000 8.830.515 13.500.000 6595
48
16Semen PC (50 kg) 60.000,0 50.601.801 843,36 Zak - 50.601.801 20
49
17Semen Warna 24.000,0 29.622.840 1.234,29 Kg - 29.622.840
51
19Tanah urug 200.000,0 3.228.840 m3 - 3.228.840
52
- - -
53
B. Bahan Finishing Laburan Pengisi dan Alatnya - - -
54
18Plamir Tembok 25.000,0 11.366.277 454,65 Kg - 11.366.277
56
20Cat Tembok Interior Setara Jotun 80.000,0 55.796.499 697,46 Kg - 55.796.499
57
21Cat Tembok Exterior Setara Jotun 80.000,0 6.919.905 86,50 Kg - 6.919.905
58
22Kuas Roll 25.000,0 842.585 33,70 Bh - 842.585
61
25Amplas 7.500,0 12.638.779 1.685,17 Lbr - 12.638.779
66
30Cat Besi 28.000,0 33.600 1,20 Kg - 33.600
80
44sealent 35.000,0 1.597.257 45,64 tube - 1.597.257
81
45Sabun/ Detergen 3.000,0 - - kg - -
82
- - -
83
C. Bahan Kayu/Baja Berikut Bahan Jadinya - - -
84
35Kayu Kelas III Papan/bekisting 4.800.000,0 13.336.252 2,78 M3 - 13.336.252
85
36Kayu Kelas III Balok/bekisting 4.800.000,0 5.096.400 1,06 M3 - 5.096.400
86
37Kayu Kelas II Balok/ Bekisting 4.800.000,0 12.026.589 2,51 M3 - 12.026.589
87
38Kayu Kelas II Papan 4.800.000,0 - - M3 - -
88
39Kayu Kelas II Balok 4.800.000,0 1.570.464 0,33 M3 - 1.570.464
89
40Kayu Dolken 30.000,0 932.022 31,07 Btg - 932.022
95
- - -
96
D. Bahan Penutup Rangka Plafond - - -
100
48Gypsum Board (120x240) 9 mm 110.500,0 10.174.930 92,08 Lbr - 10.174.930
101
49Peredam suara Rockwool 35.967.137 m2 - 35.967.137
102
50Plapond PVC 46.000,0 4.673.760 101,60 M' - 4.673.760
103
51List Gipsum 44.500,0 13.284.382 298,53 M' - 13.284.382
104
52List PVC 17.500,0 4.885.979 279,20 M' - 4.885.979
107
- - -
114
F. Bahan Lantai dan Pelapis Dinding - - - 20 x 20251.00
115
59Keramik 20 x 40 cm 120.000,0 1.528.912 12,74 Doz - 1.528.912 20 x 25201.00
116
60Keramik 40 x 40 cm 85.000,0 3.155.712 37,13 Doz - 3.155.712 #REF!430 x 30110.99
119
63Keramik 25 x 25 cm 68.000,0 215.730 3,17 Doz - 215.730 760 x 6031.08
126
70Granit 60 x 60 cm 250.000,0 151.392.281 605,57 Doz - 151.392.281
136
- - -
137
H. Bahan Logam dan Bahan Jadinya - - -
138
77Besi Beton ulir 12.500,0 - - Kg - -
139
78*Besi Beton Polos Dia. 12 mm 12.500,0 64.766.910 5.181,35 Kg - 64.766.910
140
79Besi Beton Polos Dia. 10 mm 12.500,0 522.620 41,81 Kg - 522.620
145
84Kawat Beton 30.000,0 4.154.012 138,47 Kg - 4.154.012
152
91besi hollow 4 x 4 26.000,0 22.493.052 865,12 Btg/4m - 22.493.052
153
92Hollow Galvanis 4 x 4 x 1 mm 125.000,0 - - btg/4m - -
154
93Profil Almunium 85.000,0 79.788.333 938,69 M' - 79.788.333
162
101Sprandill/ Plat strip almunium 60.000,0 3.021.319 50,36 M' - 3.021.319
169
108Baja ringan (canai Dingin) Profil C 75 95.000,0 90.695.667 954,69 btg/6 mtr - 90.695.667
181
Lis Alumunium u 39.500,0 260.700 - 260.700
182
I. Bahan Kaca - - -
183
119Kaca Polos 8 mm 250.000,0 14.423.970 57,70 - 14.423.970
184
120Kaca Polos 5 mm 150.000,0 10.311.873 68,75 - 10.311.873
185
121Kaca Tempred 10mm 540.000,0 2.386.800 4,42 - 2.386.800
186
122Floor Hinges 39.500,0 79.000 2,00 - 79.000
187
Over vanel 1.750.000,0 3.500.000 2,00
188
Top Pacht Fiting 950.000,0 1.900.000 2,00
189
Bottom Pach Fitting 650.000,0 1.300.000 2,00
190
Bottom Pacht Lock + Cylinder 1.250.000,0 2.500.000 2,00
191
Pull Handle 2.250.000,0 4.500.000 2,00
192
- - -
193
J. Bahan Paku - - -
194
89Paku Biasa 28.000,0 5.847.295 208,83 Kg 280.000,0 280.000 5.567.295 280.000
195
90Paku Tripleks 28.000,0 - - Kg - -
196
91Paku Seng + karet seal 28.000,0 157.717 5,63 Kg - 157.717
197
92skrup pixer 2.500,0 10.109.950 4.043,98 bh - 10.109.950
198
93Paku Gypsum 35.000,0 543.774 15,54 kg - 543.774
202
97Paku Keling ( rivet ) 2.000,0 32.057.766 16.028,88 bh - 32.057.766
203
98pen acrylic dan baut - set - -
204
- - -