4 | Title of Improvement: | Prevention of transmitter failure from heavy rainfall | |||||||||||||||||||||||
5 | Division | Haldia | Department | Operations | |||||||||||||||||||||
6 | Rec No. | HLD/OPN/DELTA/FY22 | |||||||||||||||||||||||
7 | Team Members | Debjit Ghosh | Debankar Das | ||||||||||||||||||||||
8 | Rohit Gupta | ||||||||||||||||||||||||
9 | Linkage to BSC / SDM | Power sale, Gross generation, DSM Gain, Water Management, Availability, PLF, Customer Management | Facilitator | Mr.Sujit Sengupta | Select | Methodology of Improvement | Trigger for Improvement | Improvement Category | |||||||||||||||||
10 | EPM Process No: | 07.04.01 07.04.02 07.04.03 07.17.05 | Improvement Category | Productivity | Quality | Delivery (Cycle Time / Response Time) | Select | Select | |||||||||||||||||
11 | Base level (with UoM) | 7.5 MW | Project/Task Start date | 11.07.2021 | Select | Suggestion | Productivity | ||||||||||||||||||
12 | Target Level (with UoM) | 0 MW loss | Project/ Task Finish date | 13.07.2021 | QC | CAPA | Quality | ||||||||||||||||||
13 | Trigger for Improvement | Suggestion | Brainstorming | Methodology of Improvement | Structured Problem Solving | Brainstorming | Structured Problem Solving | Customer / Stakeholder Feedback | Cost | ||||||||||||||||
14 | Before (Illustration with sketch) | After (Illustration with sketch) | Structured Process Review | Regulatory | Delivery (Cycle Time / Response Time) | ||||||||||||||||||||
15 | LASER | Stretched Targets (SDM) | Safety & Health | ||||||||||||||||||||||
16 | FMEA | Environment & Sustainability | |||||||||||||||||||||||
17 | Morale | ||||||||||||||||||||||||
18 | Source of Learning | ||||||||||||||||||||||||
19 | Select | Select | |||||||||||||||||||||||
20 | Site specific | Within Division | |||||||||||||||||||||||
21 | Replicable | Across Division | |||||||||||||||||||||||
22 | Benefits: | Across Tata Group | |||||||||||||||||||||||
23 | Tangible | Intangible | Across Industry | ||||||||||||||||||||||
24 | Considering the tripping of ID fan due to fluctuation of flue gas inlet pressure transmitter reading (2/3 logic for both high and low values) or the tripping of ID fan due to fluctuation of steam drum level transmitter reading (2/3 logic for both high and low values) there will be generation loss of 7.5 MW for each boiler due to eventual boiler tripping. Calculation- Loss of generation - Considering power generation from one HRSG boiler as 7.5 MW. For O&M purpose to take the boiler in service assuming the time to be approximately 30 minutes. Total loss= 7.5*0.5=3.75 MWh. Considering power sale rate to be Rs. 4 /kWh. So, loss in revenue for each occurence will be = Rs. 3.75*4*1000 = Rs 15,000 In addition to this there will be steam loss. Also, considering DM water loss to be approximately 70 MT for each occurence and DM water cost as Rs. 65/ MT , Total loss = 65*70= Rs. 4,550 Net loss per occurence= Rs. 19,550 Considering such occurences for 5 times in a year, net revenue loss= Rs. 19,550*5 = Rs. 97,750 | Reliability Customer satisfaction Morale Process safety Effective utilization of man-power and saving man-hours | Best in class | ||||||||||||||||||||||
25 | |||||||||||||||||||||||||
26 | |||||||||||||||||||||||||
27 | |||||||||||||||||||||||||
28 | Quality Tools | ||||||||||||||||||||||||
29 | Select | ||||||||||||||||||||||||
30 | Flow Diagram | ||||||||||||||||||||||||
31 | Description of Improvement : Trigger for impovement:During heavy rainfall on 1.07.2021, boilers 1-3 & 3-2 flue gas pressure transmitter readings at the inlet duct were fluctuating and which was normalized after the rainfall stopped. Boiler 1-3 PX-10302 value reached up to 100 mmwc and Boiler 3-2 PX-20201 value touched 60 mmwc during the rainfall. Due to water ingress (which is a failure mode for transmitters) or moisture ingress in the transmitters, there's a high chance of pressure transmitter failure. Moisture can quickly corrode the internal electrical connection which can lead to complete failure of transmitters. After Improvement: So, for process improvement and for protection of transmitters from such environmental concerns they're now wrapped with plastic covering for immediate protection. | Ishikawa Diagram | |||||||||||||||||||||||
32 | Pareto Analysis | ||||||||||||||||||||||||
33 | Run Charts | ||||||||||||||||||||||||
35 | Scatter Diagram | ||||||||||||||||||||||||
36 | Tools Used | Brainstorming | Failure Mode & Effect Analysis (FMEA) | Select | Select | Select | Others (ply specify) | Matrix Diagram | |||||||||||||||||
37 | Data Source | Past failure data analysis, RCA | Gantt Chart | ||||||||||||||||||||||
38 | Source of Learning (select an option and share some details) | Within Division | Learning Shared with (select an option and share some details) | Across Division | Across Division | Failure Mode & Effect Analysis (FMEA) | |||||||||||||||||||
39 | RCA after incident on 1.07.2021 | Gantt Chart | |||||||||||||||||||||||
40 | If Replicable, suggest Business Unit / Division / Dept. where it can implemented | Any business location | Figures Audited by Name & Designation: | Mr. Sujit Sengupta (Head - Operation, Chemical) | Stratification | ||||||||||||||||||||
41 | Contact person's name & phone number | Debjit Ghosh (Lead Engineer), 7585886805 | Sponsor (Div Head) Name & Signature : | Mr. Ashish Bhat (Chief - Haldia Division) | Histogram | ||||||||||||||||||||
42 | Brainstorming | ||||||||||||||||||||||||
43 | 5 W 1 H & Five Why????? | ||||||||||||||||||||||||
44 | |||||||||||||||||||||||||
45 | |||||||||||||||||||||||||
46 | |||||||||||||||||||||||||
47 | |||||||||||||||||||||||||
48 | |||||||||||||||||||||||||
49 | |||||||||||||||||||||||||
50 | |||||||||||||||||||||||||
51 | |||||||||||||||||||||||||
52 | |||||||||||||||||||||||||
53 | |||||||||||||||||||||||||
54 | |||||||||||||||||||||||||
55 | |||||||||||||||||||||||||
56 | |||||||||||||||||||||||||
57 | |||||||||||||||||||||||||
58 | |||||||||||||||||||||||||
59 | |||||||||||||||||||||||||
60 | |||||||||||||||||||||||||
61 | |||||||||||||||||||||||||
62 | |||||||||||||||||||||||||
63 | |||||||||||||||||||||||||
64 | |||||||||||||||||||||||||
65 | |||||||||||||||||||||||||
66 | |||||||||||||||||||||||||
67 | |||||||||||||||||||||||||
68 | |||||||||||||||||||||||||
69 | |||||||||||||||||||||||||
70 | |||||||||||||||||||||||||
71 | |||||||||||||||||||||||||
72 | |||||||||||||||||||||||||
73 | |||||||||||||||||||||||||
74 | |||||||||||||||||||||||||
75 | |||||||||||||||||||||||||
76 | |||||||||||||||||||||||||
77 | |||||||||||||||||||||||||
78 | |||||||||||||||||||||||||
79 | |||||||||||||||||||||||||
80 | |||||||||||||||||||||||||
81 | |||||||||||||||||||||||||
82 | |||||||||||||||||||||||||
83 | |||||||||||||||||||||||||
84 | |||||||||||||||||||||||||
85 | |||||||||||||||||||||||||
86 | |||||||||||||||||||||||||
87 | |||||||||||||||||||||||||
88 | |||||||||||||||||||||||||
89 | |||||||||||||||||||||||||
90 | |||||||||||||||||||||||||
91 | |||||||||||||||||||||||||
92 | |||||||||||||||||||||||||
93 | |||||||||||||||||||||||||
94 | |||||||||||||||||||||||||
95 | |||||||||||||||||||||||||
96 | |||||||||||||||||||||||||
97 | |||||||||||||||||||||||||
98 | |||||||||||||||||||||||||
99 | |||||||||||||||||||||||||
100 | |||||||||||||||||||||||||
101 | |||||||||||||||||||||||||