Title of Improvement: Prevention of transmitter failure from heavy rainfall
5
DivisionHaldiaDepartmentOperations
6
Rec No.HLD/OPN/DELTA/FY22
7
Team Members Debjit GhoshDebankar Das
8
Rohit Gupta
9
Linkage to BSC / SDMPower sale, Gross generation, DSM Gain, Water Management, Availability, PLF, Customer ManagementFacilitatorMr.Sujit SenguptaSelectMethodology of ImprovementTrigger for ImprovementImprovement Category
10
EPM Process No:07.04.01 07.04.02 07.04.03 07.17.05 Improvement CategoryProductivityQualityDelivery (Cycle Time / Response Time)SelectSelect
11
Base level (with UoM)7.5 MW Project/Task Start date11.07.2021SelectSuggestionProductivity
12
Target Level (with UoM)0 MW lossProject/ Task Finish date13.07.2021QCCAPA Quality
13
Trigger for Improvement SuggestionBrainstormingMethodology of ImprovementStructured Problem SolvingBrainstormingStructured Problem SolvingCustomer / Stakeholder Feedback Cost
14
Before (Illustration with sketch)After (Illustration with sketch)Structured Process ReviewRegulatoryDelivery (Cycle Time / Response Time)
15
LASERStretched Targets (SDM)Safety & Health
16
FMEAEnvironment & Sustainability
17
Morale
18
Source of Learning
19
SelectSelect
20
Site specificWithin Division
21
ReplicableAcross Division
22
Benefits:Across Tata Group
23
TangibleIntangibleAcross Industry
24
Considering the tripping of ID fan due to fluctuation of flue gas inlet pressure transmitter reading (2/3 logic for both high and low values) or the tripping of ID fan due to fluctuation of steam drum level transmitter reading (2/3 logic for both high and low values) there will be generation loss of 7.5 MW for each boiler due to eventual boiler tripping. Calculation- Loss of generation - Considering power generation from one HRSG boiler as 7.5 MW. For O&M purpose to take the boiler in service assuming the time to be approximately 30 minutes. Total loss= 7.5*0.5=3.75 MWh. Considering power sale rate to be Rs. 4 /kWh. So, loss in revenue for each occurence will be = Rs. 3.75*4*1000 = Rs 15,000 In addition to this there will be steam loss. Also, considering DM water loss to be approximately 70 MT for each occurence and DM water cost as Rs. 65/ MT , Total loss = 65*70= Rs. 4,550 Net loss per occurence= Rs. 19,550 Considering such occurences for 5 times in a year, net revenue loss= Rs. 19,550*5 = Rs. 97,750 Reliability Customer satisfaction Morale Process safety Effective utilization of man-power and saving man-hours Best in class
25
26
27
28
Quality Tools
29
Select
30
Flow Diagram
31
Description of Improvement : Trigger for impovement:During heavy rainfall on 1.07.2021, boilers 1-3 & 3-2 flue gas pressure transmitter readings at the inlet duct were fluctuating and which was normalized after the rainfall stopped. Boiler 1-3 PX-10302 value reached up to 100 mmwc and Boiler 3-2 PX-20201 value touched 60 mmwc during the rainfall. Due to water ingress (which is a failure mode for transmitters) or moisture ingress in the transmitters, there's a high chance of pressure transmitter failure. Moisture can quickly corrode the internal electrical connection which can lead to complete failure of transmitters. After Improvement: So, for process improvement and for protection of transmitters from such environmental concerns they're now wrapped with plastic covering for immediate protection.Ishikawa Diagram
32
Pareto Analysis
33
Run Charts
35
Scatter Diagram
36
Tools Used BrainstormingFailure Mode & Effect Analysis (FMEA)SelectSelectSelectOthers (ply specify)Matrix Diagram
37
Data SourcePast failure data analysis, RCA Gantt Chart
38
Source of Learning (select an option and share some details)Within Division Learning Shared with
(select an option and share some details)
Across Division Across Division Failure Mode & Effect Analysis (FMEA)
39
RCA after incident on 1.07.2021Gantt Chart
40
If Replicable, suggest Business Unit / Division / Dept. where it can implemented Any business locationFigures Audited by
Name & Designation:
Mr. Sujit Sengupta
(Head - Operation, Chemical)
Stratification
41
Contact person's name & phone numberDebjit Ghosh (Lead Engineer), 7585886805 Sponsor (Div Head)
Name & Signature :
Mr. Ashish Bhat
(Chief - Haldia Division)
Histogram
42
Brainstorming
43
5 W 1 H & Five Why?????
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101