Building Project Management9/16/2025
5
Color
WBS Number
Task name / TitleAssigned to
Planned start date
Planned end date
Deadline
Progress (%)
Duration (hours)
Estimated hours
Time log (minutes)
StatusPriority
Task description
Cost
Actual cost
6
1ZONING12/17/20252/17/202603600000
7
1.1Land Use12/17/20252/17/2026036000OpenMedium00
8
1.2Easements, Set Backs12/17/20252/17/2026036000OpenMedium00
9
1.3Access, Street Improvements12/17/20252/17/2026036000OpenMedium00
10
1.4Utilities Available12/17/20252/17/2026036000OpenMedium00
11
2HOUSE PLANS2/21/20265/2/202604080000
12
2.1Purchase Standard Plans2/21/20264/22/2026036000OpenMedium00
13
2.2Architect Original Drawings3/1/20265/2/2026036000OpenMedium00
14
2.3Specifications2/23/20264/26/2026036000OpenMedium00
15
2.4Architect Manage Job2/24/20264/27/2026036000OpenMedium00
16
2.5Engineer-Loads & Spans2/24/20264/27/2026036000OpenMedium00
17
2.6Draftsman2/24/20264/27/2026036000OpenMedium00
18
3LOT SURVEY4/28/20267/4/202603840000
19
3.1House & Driveway4/28/20266/29/2026036000OpenMedium00
20
3.2Well Locaton4/29/20266/30/2026036000OpenMedium00
21
3.3Septic Location5/2/20267/1/2026036000OpenMedium00
22
3.4Fire Hydrant & Truck Access5/3/20267/4/2026036000OpenMedium00
23
3.5Plot Plan5/3/20267/4/2026036000OpenMedium00
24
4FINANCIAL - LOAN7/5/20269/8/202603840000
25
4.1Land Cost7/5/20269/5/2026036000OpenMedium00
26
4.2Interest on Land7/6/20269/6/2026036000OpenMedium00
27
4.3Interest on Const. Loan7/7/20269/7/2026036000OpenMedium00
28
4.4Points, Etc.7/8/20269/8/2026036000OpenMedium00
29
5SEWER & WATER HOOKUP1/10/20263/11/2026036000OpenMedium00
30
6HEALTH PERMIT1/10/20263/15/202603760000
31
6.1Fees1/10/20263/11/2026036000OpenMedium00
32
6.2Percolation Test1/11/20263/14/2026036000OpenMedium00
33
6.3Soils Engineer1/12/20263/15/2026036000OpenMedium00
34
7INSURANCE1/13/20263/16/2026036000OpenMedium00
35
8LOT CLOSING COSTS1/14/20263/17/2026036000OpenMedium00
36
9BUILDING PERMITS1/17/20263/18/202603600000
37
9.1Fees1/17/20263/18/2026036000OpenMedium00
38
9.2Inspection Schedule1/17/20263/18/2026036000OpenMedium00
39
10PRELIMINARY LIST ONLY1/18/20263/21/2026036000OpenMedium00
40
11BUILD PHASE1/19/20263/22/2026036000OpenMedium00
41
12SPECIAL & DRY IN MATERIALS1/21/20263/25/202603680000
42
12.1Rough Hardware, Misc.1/21/20263/24/2026036000OpenMedium00
43
12.2Lolly Columns1/24/20263/25/2026036000OpenMedium00
44
12.3Steel Beams1/24/20263/25/2026036000OpenMedium00
45
12.4Rough Lumber, Trusses1/24/20263/25/2026036000OpenMedium00
46
13WINDOWS/OPENINGS1/26/20263/31/202603760000
47
13.1Windows, Grills, Screens1/26/20263/29/2026036000OpenMedium00
48
13.2Exterior Doors,Screens1/27/20263/30/2026036000OpenMedium00
49
13.3Skylights and Light Tubes1/28/20263/31/2026036000OpenMedium00
50
14DEMOLITION1/31/20264/1/2026036000OpenMedium00
51
15LOT CLEARING1/31/20264/5/202603760000
52
15.1Debris Removal & Clearing1/31/20264/1/2026036000OpenMedium00
53
15.2Dump Fee2/1/20264/4/2026036000OpenMedium00
54
15.3Bury Stumps, etc.2/2/20264/5/2026036000OpenMedium00
55
16DRIVEWAY, rough2/4/20264/8/202603680000
56
16.1Grade2/4/20264/7/2026036000OpenMedium00
57
16.2Base Rock, Culverts2/7/20264/8/2026036000OpenMedium00
58
17UTILITIES2/7/20264/11/202603680000
59
17.1Temporary at startup2/7/20264/8/2026036000OpenMedium00
60
17.2Transfer to permanent2/8/20264/11/2026036000OpenMedium00
61
18WELL or PUBLIC WATER2/9/20264/12/2026036000OpenMedium00
62
19SEPTIC or PUBLIC SEWER2/10/20264/13/2026036000OpenMedium00
63
20LAYOUT HOUSE FOOTPRINT2/14/20264/15/202603600000
64
20.1Establish Finish Floor Height2/14/20264/15/2026036000OpenMedium00
65
20.2Set Back Distances2/14/20264/15/2026036000OpenMedium00
66
21DIG FOUNDATION2/14/20264/15/2026036000OpenMedium00
67
22ROCK PROBLEM2/15/20264/18/2026036000OpenMedium00
68
23PREPARE FOR FOOTINGS2/17/20264/21/202603680000
69
23.1Lay out and excavate2/17/20264/20/2026036000OpenMedium00
70
23.2Form, Rebar, Grade Pegs2/18/20264/21/2026036000OpenMedium00
71
24POUR FOOTINGS & PADS2/21/20264/22/202603600000
72
24.1Yds. of Concrete2/21/20264/22/2026036000OpenMedium00
73
25SET BRICK POINTS2/21/20264/22/2026036000OpenMedium00
74
26TERMITE TREATMENT2/22/20264/25/2026036000OpenMedium00
75
27RADON CONTROL2/23/20264/26/2026036000OpenMedium00
76
28FOUNDATION WALLS2/25/20265/3/202603840000
77
28.1Block/Course2/25/20264/28/2026036000OpenMedium00
78
28.2Piers2/28/20264/29/2026036000OpenMedium00
79
28.3Pour Wall, Yds. Of Concrete2/28/20264/29/2026036000OpenMedium00
80
28.4Lintels, Rebar2/28/20264/29/2026036000OpenMedium00
81
28.5Parging3/1/20265/2/2026036000OpenMedium00
82
28.6Cement, Sand, etc.3/2/20265/3/2026036000OpenMedium00
83
29WATERPROOF FOUNDATION.3/3/20265/4/2026036000OpenMedium00
84
30COLUMNS/BEAMS SET3/4/20265/5/2026036000OpenMedium00
85
31UNDERGROUND PLUMBING3/7/20265/6/2026036000OpenMedium00
86
32BRICK/STONE, to finish grade3/7/20265/6/2026036000OpenMedium00
87
33GARAGE DOORS3/8/20265/10/202603680000
88
33.1Openers3/8/20265/9/2026036000OpenMedium00
89
33.2Trim, Backing, Weatherstrip3/9/20265/10/2026036000OpenMedium00
90
34DRAIN TILE3/10/20265/11/2026036000OpenMedium00
91
35FIRE PLACE - INTERIOR3/14/20265/13/202603600000
92
35.1Pour Hearth3/14/20265/13/2026036000OpenMedium00
93
35.2Firebox, or Set Prefab3/14/20265/13/2026036000OpenMedium00
94
35.3Brick or Stone Facing3/14/20265/13/2026036000OpenMedium00
95
36PREPARE CONC. SLABS ETC.3/16/20265/20/202603840000
96
36.1Gravel, Wire, Poly, Grade Stakes3/16/20265/17/2026036000OpenMedium00
97
36.2Labor to Prepare for Slab3/17/20265/18/2026036000OpenMedium00
98
36.3Rebar, Wire, form boards3/18/20265/19/2026036000OpenMedium00
99
36.4
Labor-Prepare, Form other Conc.
3/21/20265/20/2026036000OpenMedium00
100
36.5
Deck & Post Hole footings, etc.
3/21/20265/20/2026036000OpenMedium00