A | B | C | D | E | F | G | H | I | J | K | L | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | Additional Posts required by PHODs/Divisions for Decision of High Level Committee for Redistributionof Posts | |||||||||||
2 | Additional Posts required by PHODs/Divisions for Decision of High Level Committee for Redistributionof Posts | VAC position : https://docs.google.com/spreadsheets/d/1knpZD7ZNgCvv2BRfoUYyeQJ5zx8XCPrKiaRgPJbp_vM/edit?usp=sharing | ||||||||||
3 | pls Note--(1)SAV for each Deptt showing category/ as cadre i.e., all Tech III to Sr Tech as Tech, SSE/JE, Level-1 and then show addl posts required. What is Total SAV after addl posts? (2) breakup of posts/categories given by Departments to be given in detail in separate tab/sheet--CPO/A | |||||||||||
4 | SN | DEPTT | Proposed by | Required for | Categories & No. of additional posts required | eOffice File/Email | No. of addl posts required | No. of Posts proposed for Redistribution | Remarks of Deptt | HLC distribution | Cadre remarks (Dy.CPO/HQ) | |
5 | 1 | ELECT | PCEE | TRD/KIR | SSE=03, JE=2, Sr. Tech=7,Tech I=7, Tech II=6, Tech III=6, Asstt./TRD=17 | eOffice File No. 118786 Revd. on 14.11.2023 | 48 | |||||
6 | 2 | ELECT | PCEE | Sr. DEE/TRD & OP/KIR (TRO) | Phone Clerk-cum-Booking Clerk = 24, DEO = 16, Clerk = 12 | eOffice File No. 118786 Revd. on 14.11.2023 | 52 | For entry of various types of data,record maintenance and clerical nature of work at Crew Lobby, Power Control | ||||
7 | 3 | ELECT | PCEE | TRD/NFR | SSE=32, JE=17, Sr. Tech=32, Tech I=87, Tech II=39, TechIII=39, Asstt./TRD=162 | eFile No.118166 Rcvd 06-11-2023 | 408 | 387 posts | Posts identified in Sheet for TRD | |||
8 | 4 | ELECT | PCEE | GEN Power Supply Wing of all 5 divisions inlcuding GHY-SD | SSE=26, JE/GS=13 Sr.Tech/GS=38, Tech/GS I=106 Tech/GS II=48, Tech/GS III=48 Asst/L-1=186 | eFile No.118166 Rcvd 06-11-2023 | 465 | As per Board’s revised yardstick of 0.15 staff/1000 unit of average power consumption per month for Genl Power Supply Wing | ||||
9 | 5 | ELECT | PCEE | TL AC Cadre of NFR | SSE = 69, JE=34, Sr.Tech = 66,Tech-I = 181,Tech-II = 82, Tech - III = 82, Helper/Astt = 342 | eOffice File No. 118786 Revd. on 14.11.2023 | 856 | In coaching maintenance and escorting duty of power cars & LHB type AC coaches --recommended by CESE in note#4 dt 29-11-2023 of efile no.118786 | ||||
10 | 15 | ELECT | DRM/LMG | Sr. DEE/TRD/LMG | Sr. Tech-4, Tech I-39, Tech II-2, Tech III-7, Asstt. Helper/DSL- 5 | No. E/281/TRD/Elect/Pt.-II Dated 15.02.2024 | 57 | Already Redistributed to Sr. DEE/TRD/LMG from DIESEL cum DEMU Shed under Sr. DME/LMG | ||||
11 | 1829 | 57 posts reduced from total requirements | ||||||||||
12 | 6 | MECH | PCME | Coaching & Wagon Wing of KIR Div. | SSE=5, JE=8, Sr. Tech=44, Tech I=93, Tech II=21, Tech III=48, Asst.=192 | Being Processed Proposal recvd by PCPO's Office on 08-02-2024 vide Note No. Mech/C&W/Staff Matters/Pt.XVIII/188 dt 6-11-2023 | 411 | To be redistributed from vacant posts within Mech deptt | ||||
13 | 7 | MECH | PCME Sr. DME/DEMU/SGUJ | DEMU Shed,SGUJ | JE=19, Tech=97, Asst.=78, Clerk=8 | File No. M-DEMU/Estt-11/SGUJ Proposal recvd by PCPO's Office on 08-02-2024 vide Note No. Mech/C&W/Staff Matters/Pt.XVIII/188 dt 6-11-2023 | 202 | To be redistributed from vacant posts within Mech deptt | ||||
14 | 8 | MECH | PCME | Coaching Wing of APDJ Div. | JE=30, Sr. Tech=31, Tech I=85, Tech II=39, Tech III=39, Asst.=130 | File no. M-Misc/review/C&W/Pt-IVIAP(G) eFile No. APDJ0MECH/1/2022 Computer No. 68139 Proposal recvd by PCPO's Office on 08-02-2024 | 354 | For existing APDJ Coaching Depot, NCB, Train Passing & NOQ, Train Passing and (a) For new OCV Coach maintenance depot with 2 PIT Lines & Sick line at NCB. (b) 1 additional PIT Line at APDJ (c) Train Passing at Sevok, Rangpo Project | To be redistributed from vacant posts within Mech deptt | |||
15 | 9 | MECH | PCME | C&W/RNY | JE=14, Sr. Tech=26, Tech I=51, Tech II=8, Tech III=15, Asst.=67 | M/RNY/BOS/RNY/12 Proposal recvd by PCPO's Office on 08-02-2024 | 181 | |||||
16 | 10 | MECH | PCME | C&W/LMG except GHY | SSE=12, JE=47, Sr. Tech=93, Tech I=182, Tech II=28, Tech III=54, Asst.=239 | Being Processed Proposal recvd by PCPO's Office on 08-02-2024 | 655 | Upcoming new coaching depots of Zubza, Imphal & Aizwal have been taken into consideration | ||||
17 | 11 | MECH | PCME | C&W/TSK | SSE=22, JE=(-12), CMA=(-1), Sr. Tech=(-13), Tech I=2, Tech II=69, Tech III=40, Asst.=109, S/Cleaner=(-3), S/Attdt.=(-2), Paniwala=(-1) | M/E/1-G (MPP) Proposal recvd by PCPO's Office on 08-02-2024 | 210 | |||||
18 | 12 | MECH | PCME | DEMU Shed/TSK | SSE=(-1), JE=4, Sr. Tech=3, Tech I=18, Tech II=11, Tech III=13, Asst.=32 | Being Processed Proposal recvd by PCPO's Office on 08-02-2024 | 80 | |||||
19 | 13 | MECH | PCME | NBQ WS | SSE=14, JE=6, Sr. Tech=42, Tech I=115, Tech II=52, Tech III=52, Asst./WS=51 | Being Processed Proposal recvd by PCPO's Office on 08-02-2024 | 332 | POH & IOH Target increased from 2022-23 | ||||
20 | 14 | MECH | PCME | DBWS | CMS=2, JE=3, SSE=2, JE=4, Clerk=1 | Redistribution of 06 posts of Painter to Tech-III (Fitter) Proposal recvd by PCPO's Office on 08-02-2024 | 12 | |||||
21 | 2437 | |||||||||||
22 | 17 | OPTG | PCOM | KIR, APDJ, RNY, LMG, TSK (New Assets) | SS/SM = 155, Controller = 28, Pointsman = 186, Gateman = 33, Shunting Master = 08 | Revised Optg eOffice File No 125633 recvd on 26-02-2024 Revised Proposed posts | 410 | KIR : i) New ARQ-TKG section & GAGA station, ii) For Pit Line of JBN & BLGT, iii) CTC reqd for NJP-MLDT & other sections. APDJ : i) For new stations of Tipkai, Basbari, Dhubri & HPCL siding (subject to Rly-Bd's approval), ii) SVQ-Rangpo priject, iii) KOJ -Gelepu (6 stations-subject to Rly-Bd's approval) and also creation of posts against cadre review. RNY : For GUP-AYU section. LMG : i) For new sections AGTL-AKHORA, KXJ-MSSN(BDR LINK), TTLA-BATNIHAT - SHILLONG, DSR-ZUBZA, BHRB-SIRANG & JRBM - TIPUL-IMPHAL Section. TSK : i) For change in jurisdiction of RNY & TSK division, Section from NLP-MZS is going to be extended upto Pasighat. | ||||
23 | 410 | |||||||||||
24 | 18 | S&T | PCSTE | SIGNAL & TELECOM (KIR) | SIGNAL : 264 SSE/JE/Sig = 52 Tech/Sig =142, Store clerk = 02 Helper/Signal = 41 Tech/Blacksmith=-27 TELECOM : 73 SSE/JE/Telecom = 30, Tech/Telecom = 07, Store clerk = 02 Helper/Telecom = 03 LR @ 15% = 31 | L/No.N/213/O (Yard-Stick)Pt.XIII dated 28-11-2023 | 337 | Additional posts required as per revised Yardstick of Signal & Telecom | SAV of S&T Deptt/NFR S= 2968, A=2334, V=634 Redistribution shall be made from among vacant posts of S&T department | |||
25 | 19 | S&T | PCSTE | S&T(APDJ) | SSE/Sig=5, JE/Sig=3, Tech/Sig=25, Asstt./Sig=20, Tech/B.Smith/Sig=4, SSE/Tele=5, JE/Tele=3, Tech/Tele=25, Asstt/Tele=15 | L/No.N/213/O (Yard-Stick)Pt.XIII dated 21-12-2023 | 105 | Additional posts reqd for maintenance of Signal & Telecom gears, opening of New Section and New line in APDJ | ||||
26 | 20 | S&T | PCSTE | S&T/APDJ (New Line Sivok to Rangpo) | SSE/Sig=1, JE/Sig=1, Tech/Sig=4, Asstt./Sig=4, SSE/Tele=1, JE/Tele=1, Tech/Tele=4, Asstt/Tele=4 | L/No.N/213/O (Yard-Stick)Pt.XIII dated 21-12-2023 | 20 | For New Line Sivok to Rangpo section at APDJ | ||||
27 | 21 | S&T | PCSTE | S & T APDJ (TPK,BSI New Stations) | JE/Sig=1, Tech/Sig=3, Asstt./Sig=3, SSE/Tele=1, Tech/Tele=3, Asstt/Tele=3 | L/No.N/213/O (Yard-Stick)Pt.XIII dated 21-12-2023 | 14 | For opening of TPK,BSI New Stations | ||||
28 | 22 | S&T | PCSTE | S&T/RNY | SSE/Sig =28, JE/Sig = 12, Tech/Sig = 69, Asst./Sig = 18 SSE/Tele = 28, JE/Tele=12 Tech/Tele = 37, Astt/Tele = 38, Store Clerk/S&T = 9 | L/No.N/213/0 (Yard Stick) Pt.XIII dated 10-02-2024 | 251 | 1. New Line project Murkongslek-Pasighat, 2. New EI - 28 nos. in connections with doubling work, 3. ABS, LTE, KVS work, 4. IBS work | ||||
29 | 23 | S&T | PCSTE | S&T/LMG | SSE/Sig =35, JE/Sig = 22, Tech/Sig = 87, Asst/Sig=114 Tech/B Smith/Sig = 3, Store Clerk/Sig = 5 SSE/Tele = 41, JE/Tele = 10 Tech/Tele = 68, Asst/Tele=47 Store Clerk/Tele = 5 | L/No.N/213/0 (Yard Stick) Pt.XIII dated 10-02-2024 | 437 | 1. NL project DMV, Kohima 2. NL project Jiribum-Tupul-Imphal 3. NL project TTLA-Barnihat 4. NL project, Bhairabi-Sairang 5. New EI - 12 nos in connection with doubling work 6. ABS, LTE, KVS work | ||||
30 | 24 | S&T | PCSTE | S&T/TSK | SSE/Sig =21, JE/Sig = 22, Tech/Sig = 43, Asst/Sig= 60 Tech/B Smith/Sig = 7, Store Clerk/Sig =2 SSE/Tele =10, JE/Tele = 10 Tech/Tele = 19, Asst/Tele=34 | L/No.N/213/0 (Yard Stick) Pt.XIII dated 10-02-2024 | 228 | 1. New EI - 22 posts 2. LTE, KVS work | ||||
31 | 1392 | |||||||||||
32 | 25 | C.ENGG | PCE | TMO/NFR (HQ Controlled BOS) | SSE=224, JE=109 SR.TECH=99, TECH I=196 TECH II=23, TECH III=70 ATM/L-1=413 | L/No. W/CE/HQ/Rationalization of Manpower/2023/Genl dt 14-02-2024 eFile No.23237 dated 2-5-2023 | 1134 | 255 | 1. 255 posts identified from Civil Engg Dept for redistribution for operation in L-7 (SSE/TMC/HQ = 13, ), L-6 (JE/TMC/HQ = 76, JE/TMC/Control/HQ = 4, Sr. Tech/TMC/HQ = 46,, L-5 (Tech/I/TMC/HQ = 75), L-4 (Tech-II/TMC/HQ = 9), ATM/TMC/HQ=32) 2. 508 vacant posts of other Departments identified and proposed for redistribution As per Annex.9.1 of IRTMM-2019 requirement of additional posts calculated for existing machines and upcoming machines | 1. 255 posts as identified by Engg Dept from within Engg. vacantcies. https://docs.google.com/spreadsheets/d/1LPnEgo19V4_d0_xLddIPrAkxH0uopfpV/edit?usp=sharing&ouid=103869079698858108715&rtpof=true&sd=true | ||
33 | 26 | C.ENGG | PCE | BRI/NFR All Units | SSE/Br. = 27 JE/Br. = 15 Sr. Tech =42, Tech-I = 86, Tech-II = 11, Tech-III = 29 Asst Bridge = 105 Ministerial staff = 11 | CPDE'S L/No. W/CE/HQ/Rationalization of Manpower/2023/Genl dated 22-01-2024 and CBE's L/No.178/W/DRG/BR/PT-XII (GC) dated 09-11-2023 | 326 | Additional Requirement Proposed as Revised Yardsticks | ||||
34 | 27 | C.ENGG | PCE | NFR ALL UNITS | Trackmaintainers (including all Grades) | CPDE's L/No. W/CE/HQ/Creation-New Assets/Gen dated 23-01-2024 | 2096 | Additional Requirement Proposed for the new lines already been commissioned | ||||
35 | 3556 | |||||||||||
36 | 28 | COMML | PCCM | KIR | Sr. Catg. Inspector (L-6) = 04 CTC (L-3) = 44 | L/No C/A-35/Misc/CM/2016 dated 03-11-2023 | 48 | i) Managing of new Catering Units like OSOP, MPS, PBJK and WVM II) CTC= 20 - for New Railway line project from ARR to GAGA for new 05 (Five) stations i.e. Rahmat Nagar, Lakxmipur, Kaliaganj, Bibiganj and Pawakhali. iii) CTC =12 - Bathnaha-Biratnagar project for 03 (three) Goods Sheds i.e. Indain Custom, Nepal Custom and Biratnagar. iv) CTC= 12 - Balurghat-Hilli project for 03(three) stations including Hilli Goods Shed. | Internal Variation to be in Commercial Dept | |||
37 | 29 | COMML | PCCM | RNY | CCTC(RG) =02, Sr.CCTC =05 Sr.CCTC(LR)=02 | L/No C/A-35/Misc/CM/2016 dated 03-11-2023 | 9 | For newly constructed 05 Stations VIZ. Bechimari ( BCMR), Chapar(CHAA), Bilasipara(BLPA), Bogaribari( BGBI) and Alamganj(ALMG) in newly opened AYU-DBB section in BG-II for Commercial works. | ||||
38 | 30 | COMML | PCCM | APDJ Sivok-Rangpo Project | CC = 16 TC = 14 Porter = 14 | L/No C/A-35/Misc/CM/2016 dated 03-11-2023 | 44 | For Sivok-Rangpo Project of APDJ Divn and 5 new Stations at Sivok, Riyang, Tista Bazar, Melli, Rongpo | ||||
39 | 31 | COMML | PCCM | TSK (Murkongsele- Sille & Sille-Pasighat Sections) | 3 New Stations : CCTC (L-3) = 06 Goods Shed/Pasighat : CGS (L-7) = 02 GS (L-6) = 04, Sr.CTC (L-5) = 06 CCTC (L-3) = 02 Booking/Parcel/Pasighat : CCC-I (L-7) = 02 CCC-II (L-6) = 04 Sr. CTC (L-5) = 05 CTC (L-3) = 02 Ticket Checking (Pasighat): CTI (L-7) = 01 DY,. CTI (L-6) = 02 SR. CTC (L-5) = 02 CCTC (L-3) = 02 | L/No C/A-35/Misc/CM/2016 dated 03-11-2023 | 40 | I) 06 post of CCTC L-3 - Proposed for creation for 03 stations i.e. 02 each ii) Goods Shed (Pasighat) = 14 iii) Booking/ Parcel (Pasighat) = 13 iv) Ticket Checking (Pasighat)= 07 | ||||
40 | 32 | COMML | PCCM | LMG (New line Projects) | CCC-I (L-7) = 16 CCC-II (L-6) = 16 Sr. CTC (L-5) =21 CTC (L-3) = 20 CGS (L-7) = 07 GS (L-6) = 06, Sr.CTC (L-5) = 07 CCTC (L-3) = 06 | L/No C/A-35/Misc/CM/2016 dated 03-11-2023 | 99 | i) Dhansiri-Shokhuvi-Zubza = 38 ii) Bairabi - Sairang = 25 iii) Khongsang-Tupul = 26 iv) Nishintpur Yard - Agartala = 10 | WSNF/39,WSNF/51 have identified : L-7(5 posts), L-6(27 posts), L-5(17 posts), Level-3( 2 posts) in Lumding division. | |||
41 | 240 | Views of Comml Dept Recvd vide letter dt 19-04-2024 | ||||||||||
42 | 33 | STORES | PCMM | RNY, APDJ, TSK | DMS = 40 CDMS = 08 | L/No. S/B-12/BOS/SD/EM Dated 07-11-2023 | 48 | 48 | 48 (50% Vacant posts of OS of Stores = 96) | Vacancy exists. Can be redistributed. | ||
43 | ||||||||||||
44 | 34 | PERS | PCPO | HQ (Welfare Bureau) RNY | For Training Institutes - MDZTI/MDDTI Instructor/Personnel (L/7 or L/6) = 08 Requirement against New Lines : Welfare Inspector = 11 Clerks = 89 Stenos/Office Assts = 11 Office Asst/P/RNY = 2 | 121 | Instructors =08 (KIR =1, APDJ=1, RNY=1, LMG=1, STC/NBQ=1, STC/SGUJ=1, STC/PNO=1, STC/NGC=1) Staff for new lines assesses in the MPR Benchmarking ratio against new posts proposed by other Departments against new lines/sections | |||||
45 | 121 | |||||||||||
46 | 35 | MED | PCMD | TSK | Physiotherapist, L-6 = 3 for DRH, Dibrugarh, HU/BNGN, and NFRSA | eFile No. 117739 Rcvd 01-11-2023 ACMD/HQ's L/No.H/58/89/MPP Pt.II dated 26-10-2023 & eOffice File No.107229 | 3 | 1 | 1 vacant post Sr Tech/M Driver/LMG identified for redistribution 3 posts of (Occupational Therapist = 1, Clinical Psychologist = 1, Speech Therapist = 1) already done | Occupational Therapist = 1 Clinical Psychologist = 1 Speech Therapist = 1 For operation of above posts, posts already redistributed | Already completed vide file no 107229 for 03 nos. of posts at CH/MLG | |
47 | 36 | MED | PCMD | HQ | Attendant in lieu of TADK (Level 1) | eFile No.119088 Dated 20.11.2023 eFile No.119683 Rcvd on 29-11-2023 | 16 | 9 | 9 nos. of posts for Attendant in lieu of TADK is proposed for creation by redistribution of 14 nos. of vacant posts of HKA/Conservancy of HQ unit | Temporary redistribution of 07 posts of HKA for operation as TADK for a period of 01 year was issued vide M/ No. 02/2024 (Med) dated 09.01.2024 ( file No. 121853). | ||
48 | 19 | |||||||||||
49 | 37 | GEN ADMIN | SDGM | HQ | CVI/Medical L-6 or L-7 | eFile No. 121333 recvd on 26-12-2023 | 1 | 1 | 1 post of OS/Typist from LMG (Medical deptt) can be redistributed as CVI/Medical | |||
50 | 38 | GEN ADMIN | SDGM | HQ | VI/Personnel L-7 = 2 | eFile No.121560 dated 20.12.2023 | 2 | 2 | To handle increased workload of Vig(Personnel) in addition to existing 3 CVIs | 2 posts of OS/Perssonel in L-6 | ||
51 | GEN ADMIN | SDGM | HQ | SSE/IT/Vig (L-7) = 1 CVI/Elect (L-6 or L-7) = 1 SSE/IT/Genl Admin = 1 JE/IT/Genl/Admin = 1 Chief OS/OS/Griev =1 Genl Astt. = 1 | 6 | 6 | ||||||
52 | 9 | |||||||||||
53 | 39 | SECURITY | PCSC | RNY | IPF-01, SIPF-05, ASI/PF-08, HC-25, CT-78, COOK-03 | Sent to Rly Bd. vide eFile No. 65857 on 22/09/2022 Received on 14-02-2024 | 120 | For RPF/Post Bilasipara for newly constructed line of New Maynaguri-Jogighopa | ||||
54 | 40 | SECURITY | PCSC | LMG | IPF-05, SIPF-26, ASI/PF-52, HC-209, CT-581, COOK-33 | Sent to Rly Bd. vide eFile No. 88739 on 16/12/2022 Received on 14-02-2024 | 906 | For RPF/Post at Zubra, Jiribam, Imphal, Sairang, Nischintpur and RPF/Out-Post at Sokhuvi, Khongsang, Bhairabi, Udaipur, Ambasa and Sabroom in the newly constructed rail line of Dhansiri-Zubza (Nagaland), Jiribam-Tupul-Imphal (Manipur), Bhairabi-Sairang (Mizoram) and Agartala-Sabroom (Tripura) | ||||
55 | 1026 | |||||||||||
56 | 41 | ACCTS | PFA | 132 | ||||||||
57 | ||||||||||||
58 | 11219 | 379 | ||||||||||
59 | ||||||||||||
60 | ||||||||||||
61 | List of Vacant Posts | |||||||||||
62 | ||||||||||||
63 | ||||||||||||
64 | ||||||||||||
65 | ||||||||||||
66 | ||||||||||||
67 |