ABCDEFGHIJKLMNOPQRSTUVWXYZ
1
Date: April 04, 2024LEGENDS:
2
Project: Intellectual Property of the PhilippinesADDED
3
Location:
3rd and 17th Floors of Savya Financial Center, Arca South, Barangay Western Bicutan, Taguig City
MOVED FROM PACKAGE 1 TO PACKAGE 2
4
MOVED FROM PACKAGE 2 TO PACKAGE 3
5
Subject: Package 1 - Bill of QuantitiesREF NO.:IPOPHL-BOQ-0010.03MOVED FROM PACKAGE 1 TO PACKAGE 3
6
Attn: Director Frisco L. GuceREV NO.: 03 CHANGED IN SPECS
7
8
ITEM NO.ITEM / DESCRIPTIONITEM CODEBRANDS TOTAL QTY UNIT MATERIAL COST LABOR COST TOTAL TOTAL COST REMARKS
9
10
I
GENERAL REQUIREMENTS
11
a.Mobilization and Demobilization 1.00 lot -
12
b.Temporary facilities 1.00 lot -
13
c.Delivery of tools, equipment and materials 1.00 lot -
14
d.Safety Protection/PPE 1.00 lot -
15
e.Cleaning and maintenance 1.00 lot -
16
f.Construction Security Guard Fee (24/7 shifting x 5 months) 1.00 lot -
17
g.As Built Plan 1.00 lot
18
Plans and Drawings -
19
h.Permits and Licenses (PEZA/LGU) -
20
Application and Processing 1.00 lot -
21
Building and Occupancy Permit 1.00 lot -
22
i.Bonds and Insurances -
23
Warranty Bond 1.00 lot -
24
Contractor's All Risk Insurance (CARI) 1.00 lot -
25
Contractor's General Liability Insurance (CGL) 1.00 lot -
26
Performance/Surety Bond 1.00 lot -
27
Vetting Fee 1.00 lot -
28
Construction Bonds (c/o IPOPHL) 1.00 lot By Owner
29
j.Hauling and Disposal 1.00 lot -
30
k.Power connections and water consumptions during construction period 1.00 lot -
31
l.
Complete the construction project within the specified timelines and budget parameters
32
SUB-TOTAL I -
33
34
II
CIVIL/ARCHITECTURAL WORKS
35
DEMOLITION/DISMANTLING WORKS FLOOR TILES
36
a.Dismantling of existing wall partitions
37
17F Existing Walls 809.20 sqm -
38
17F Existing Floors 130.00 sqm -
39
17F Existing Glass Doors w/ Aluminum Frames
Doors to be reused. Refer to Iglass/Glazing Wokrs. Code: GD-EX
12.00 sets -
40
41
CEILING WORKS AND FINISHES
42
a.Painting works with one coat primer and two coats of top coat (CP-01) (slab soffit/beam, exposed ducting, pipes)CF-01
43
3F - Open Areas including Production Areas, Huddle Spaces, Pre-Function Lounge, Hallways 2,368.60 sqm -
44
3F - Conference Room 1-6 281.42 sqm -
45
3F - Conference Room 7-8 61.03 sqm -
46
3F - Training Room 88.35 sqm -
47
3F - Janitor's Room 13.28 sqm -
48
3F - Janitor's Storage Room 7.81 sqm -
49
3F - Prayer Room 8.85 sqm -
50
3F - Cafeteria Wet Pantry 11.91 sqm -
51
3F - Cafeteria Storage 6.80 sqm -
52
3F - Driver's Room 11.54 sqm -
53
3F - Wellness Room 14.35 sqm -
54
3F - Clinic 19.93 sqm -
55
3F - Nursery Room 3.39 sqm -
56
3F - CCTV/Security 11.38 sqm -
57
3F - COA 19.40 sqm -
58
3F - COA Storage 9.79 sqm -
59
3F - EA Office 8.12 sqm -
60
3F - Cashier 19.61 sqm -
61
3F - Frontline Reception including Waiting Area, Help Desk, Hallway 90.61 sqm -
62
3F - Mailbox 6.63 sqm -
63
3F - Receiving/Mail Room 11.71 sqm -
64
3F - Office Supply Issuance Room 14.53 sqm -
65
3F - Office Supply Room 30.60 sqm -
66
3F - General Admin Storage Room 21.10 sqm -
67
3F - Strategy Management Records Room 11.04 sqm -
68
3F - Finance Room Records Room 15.61 sqm -
69
3F - HR-Admin Records Room 5.07 sqm -
70
3F - Recording Studio 22.41 sqm -
71
3F - Central AUX/AV Room 5.72 sqm -
72
3F - MPH Pantry 5.72 sqm -
73
3F - Furniture Storage Room 17.05 sqm -
74
3F - BCRR Records Room 15.92 sqm -
75
3F - BOT Records Room 41.04 sqm -
76
3F - BOP Records Room 54.82 sqm -
77
3F - DITTB Storage 16.54 sqm -
78
17F - Open Areas including IEO/PRIA, BLA, ODDG-OLA Staff, ODDG-PMS Staff Production Areas, Hallways 392.10 sqm -
79
17F - Board Room Lounge including ODG Secretariat and DTI-SEC Secretariat 110.50 sqm -
80
17F - ODG Staff 39.24 sqm -
81
17F - ODG Legal 41.10 sqm -
82
17F - ODG Storage 6.15 sqm -
83
17F - Hearing Room 1 & 2 69.97 sqm -
84
17F - Furniture Storage Room 9.47 sqm -
85
17F - Reception 16.98 sqm -
86
17F - Cafeteria Wet Pantry 6.28 sqm -
87
17F - Wellness Room 11.07 sqm -
88
17F - MIS Office 109.54 sqm -
89
17F - MIS Workshop & Monitoring Room 17.36 sqm -
90
17F - MIS Storage 8.51 sqm -
91
17F - BLA Records Room 21.57 sqm -
92
17F - Conference Room 1 33.52 sqm -
93
94
b.Painting works with one coat primer and two coats of top coat (CP-02) (slab soffit/beam, exposed ducting, pipes)CF-02
95
3F - BOT Dir III & IV 74.68 sqm -
96
3F - BOP Dir III & IV 74.68 sqm -
97
3F - FMAS Dir III & IV 74.02 sqm -
98
3F - DITTB Dir III & IV 74.02 sqm -
99
3F - BCRR Dir III & IV 74.02 sqm -
100
17F - BLA Dir III & IV 72.47 sqm -