ABCDEFGHIJKLMNOPQRSTUVWXYZ
1
QC STANDARD — gibbenclothing
2
The document a factory can follow without calling you. Fill the amber cells.
3
Legend
4
Fill inamber cells are yours to complete Autogrey/white cells calculate — don't edit
5
6
1 · PRODUCT SUMMARY
7
Brandgibbenclothing
8
Style name / no.[e.g. HD-400 heavyweight hoodie]
9
Fabric / composition[e.g. 400 GSM 100% cotton loopback]
10
Colourway[ ]
11
Size range[ ]
12
Order quantity[ ]
13
Season[ ]
14
Standard versionv1.0
15
Date (DD/MM/YYYY)[ ]
16
17
2 · GOLDEN (SEALED) SAMPLE
18
The sealed sample is the physical benchmark for colour, hand-feel, weight and finish. Production must match it.
19
Sample approved on[date]
20
Held by (2 sealed copies)
gibbenclothing + factory
21
Sealing checklist
22
• Approved together by both partiesNo
23
• Tagged & signed (style, colour, season, date)No
24
• Two identical sealed copies madeNo
25
• Photographed from every angle, consistent lightNo
26
• Stored clean, dry and out of sunlightNo
27
28
3 · MEASUREMENT SPEC & TOLERANCES (measured flat, unstretched)
29
Measurement pointHow / where measuredTarget (cm)Tol ± (cm)Min (cm)Max (cm)
30
e.g. Chest — 1 cm below armholeLaid flat, unstretched, armhole to armhole56.01.554.557.5
31
32
33
34
35
36
37
38
39
40
41
42
43
4 · DEFECT CLASSIFICATION
44
List the 20–30 defects that cause your real returns. Class drives the pass/fail line (Critical = 0).
45
DefectLocationClassLimit / ruleAttach photo?
46
Needle / metal fragmentAnywhereCriticalZero tolerance — fails lotYes
47
Broken / open seamAny structural seamMajorAny = majorYes
48
Loose thread endVisible outer surfaceMinor> 5 mm = minor; inner trim < 10 mmYes
49
Colour mismatch vs sampleWhole garmentMajorVisible shade shift vs golden sampleYes
50
51
52
53
54
55
56
57
58
59
5 · INSPECTION & AQL (enter lot size → sample & accept/reject auto-fill)
60
Standard: ISO 2859-1 / ANSI-ASQ Z1.4, single sampling, General Inspection Level II.
61
Order / lot size ← enter units5000Major AQL2.5Minor AQL
62
Inspection levelGeneral II(lower = stricter)4.0
63
Sample sizeMajor: accept ≤Major: reject ≥Minor: accept ≤Minor: reject ≥
64
20010111415
65
66
6 · CONSEQUENCES OF A FAILED INSPECTION
67
Minor overageFactory reworks or replaces affected units at their cost, before shipment.
68
Major failureFull re-inspection after rework at the factory's expense; shipment held until it passes.
69
Repeated / criticalRight to reject the lot, withhold balance payment, or renegotiate.
70
Payment linkBalance due only after a passed pre-shipment inspection.
71
72
7 · SIGN-OFF
73
Referenced in PO / agreement as: QC Standard v___ dated ___ , Annex A. Attach: A) defect library B) golden-sample photos C) full size spec.
74
gibbenclothing — signed
[name / signature]
75
Factory — signed[name / signature]
76
Date[ ]
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100