ABCDEFGHIJKLMNOPQRSTUVWXYZ
1
2
Please fill in by adding your name, insitute, and your interests in partecipation
3
See more info at bottom of page for more info how to fill it in (see asterisks)
4
For total labor see second tab
5
6
FOR EOI ONLY
7
NameInstituteInterest in Consortium [Y/N]Interest in EIC EOI [Y/N]EIC Detector Interest for LGAD applicationPotential Contributions (*)Assumptions on Contributions (**)Timing Constraints (***)Other Info (****)
8
Wei LiRiceYY4D tracker, TOF
9
Alessandro TricoliBNLYYRoman Pot, 4D tracker, TOF
Fully equipped test lab for full characterisation of (AC-)LGAD sensor prototypes and their readout with testboards. Expertise will include a physicist, two postdocs and summer students.
Equipment, test lab and expertise are available at BNL.Work is already underway
In the test lab we can provide measurements of timing and space resolution, charge collection efficiencies, with probe stations, radioactive sources and lasers, in warm and cold conditions, data analysis, readout boards.
10
Gabriele GiacominiBNLYYRoman Pot, 4D tracker, TOF
Fully equipped clean rooms for fabrications of (AC-)LGADs, as well as sensor design and testing. Expertise will include a scientist and a technician.
Design capabilities (TCAD license and expertise) as well as equipment and clean rooms are available at BNL, whereas for fabrication of sensor prototypes (e.g. M&S and manpower) projects funds are assumed
Work is already underway
In BNL's Instrumentation Division we can design and fabricate sesnors, provide wire and bump bonding of test assemblies, test stations electrical equipment for testing
11
Xuan LiLANLYYHadron going silicon veretx/tracking detector integration with TOF
12
Artur ApresyanFNALYY4D tracker, TOF
13
Abe SeidenUCSCYY4D tracker, TOFMeasurments on number of AC-LGADS
Funded internally for next year. If ramp up will need EIC funding.
Work is already underway, can continue for a few years.
14
Hartmut SadrozinskiUCSCYY4D trackerMeasurments on number of AC-LGADS
Funded internally for next year. If ramp up will need EIC funding.
Work is already underway, can continue for a few years.
15
Simone MazzaUCSCYY4D tracker, TOFMeasurments on number of AC-LGADS
Funded internally for next year. If ramp up will need EIC funding.
Work is already underway, can continue for a few years.
16
Bruce SchummUCSCYY4D tracker, TOFMeasurments on number of AC-LGADS
Funded internally for next year. If ramp up will need EIC funding.
Work is already underway, can continue for a few years.
17
Zhenyu YeUICYYTOPSide, 4D tracker, TOF, Roman Pot
18
Olga EvdokimovUICYY4D tracker, TOF
19
Zein-Eddine MezianiANLYYTOPSiDE, 4D tracker, TOF, hybrid LGAD/SOI trackerLGAD R&D, readout electronics, mechanical engineering and constructionAlready internally funded by Argonne
20
Whitney ArmstrongANLYYTOPSiDE, 4D tracker, TOF, hybrid LGAD/SOI trackerLGAD R&D, readout electronics, mechanical engineering and constructionAlready internally funded by Argonne
21
Sylvester JoostenANLYYTOPSiDE, 4D tracker, TOF, hybrid LGAD/SOI trackerLGAD R&D, readout electronics, mechanical engineering and constructionAlready internally funded by Argonne
22
Jessica MetcalfeANLYYTOPSiDE, 4D tracker, TOF, hybrid LGAD/SOI trackerLGAD R&D, readout electronics, mechanical engineering and constructionAlready internally funded by Argonne
23
Manoj JadhavANLYYTOPSiDE, 4D tracker, TOF, hybrid LGAD/SOI trackerLGAD R&D, readout electronics, mechanical engineering and constructionAlready internally funded by Argonne
24
Angelo DragoneSLACY4D tracker, TOF, ASICs
25
Chris KenneySLACY4D tracker, TOF, Sensors
26
Charlie YoungSLACYBeyond 3D silicon tracker
27
Ariel SchwartzmanSLACY 4D tracker
28
Julie SegalSLACY4D tracker, TOF, Sensors
29
Christophe RoyonKUYYSi TOF timing detectors (electronics, sensors, tests)full tests (laser, source, oscilloscope), electronics, lab fully equipedAdditional resources for people (post-doc)
Work is underway for other projects (NASA) so lab is ready
30
Constantin LoizidesORNLYYTracking, TOF + general readout systemTBDTBDTBD
Scope has to fit in ORNL EIC EOI (and other EOI) proposal related to silicon tracking and readout systems
31
Frank GeurtsRiceYY4D tracker, TOF
32
Cinzia Da VIaSUNYYYSi TOF timing detectors (electronics, sensors, tests)Tests on existing LGADS with pixel electronicsOne graduate student in CY 2021
33
Bolek WyslouchMITYY4D Tracker, TOFMechanics and cooling
Assuming participation from Bates Research and Engineering Center at MIT
Part of MIT EIC effort, we can provide mechanical engineering support at this stage
34
Rachid NouicerBNLYY4pi Silicon Hybrid Tracker (SOI,LGAD), TOPSIDEDetector construction
Assembly/testing/equipments lab (2-211) and expertise are available at BNL Physics Department
35
Laurent Serin IJCLabYRoman Pot ASIC ASIC + tests
under assumption of funding by Funding Agency (IN2P3/CNRS)
Construction of ATLAS HGTD up to 2025)
36
Carlos Munoz CamachoIJCLabYYRoman PotASIC + tests
37
Janusz J. ChwastowskiIFJ PANYYRoman Pot: test beam data analysis, simulations, reconstruction,alignment, irradiation testsIFJ PAN contribution depends on obtaining a proper funding from Polish Govermentpresently involved in the ATLAS experiment: the ATLAS Roman Pot system; up 2028?on-site irradiation tests using the proton cyclotron: energies 5 MeV to 230 MeV; also non-uniform irradiation tests
38
Rafał StaszewskiIFJ PANYYRoman Pottest beam data analysis, simulations, reconstruction,alignment, irradiation tests
39
Maciej TrzebińskiIFJ PANYYRoman Pottest beam data analysis, simulations, reconstruction,alignment, irradiation tests
40
Jacek ŚwierblewskiIFJ PANYRoman Potmechanics, design, construction, intergration with the EICFrom 2022; Presently at XFEL, ITER, ESS
41
Alexander KiselevBNLYRoman Pot, 4D detectors
Tracking, timing. Charge sharing pad design. Have DRS4 electronics in the lab (used for LAPPD-related project). Expertise in C++ coding, small scale DAQ setups. Several beam test campaigns at FTBF.
42
Salvatore FazioBNLYRoman Pottest beam data analysis, simulations
43
(*) Potential contributions are for each item of interest
(***) Time Constraints
44
Please indicate what the level of potential contributions are for each item of interest: (e.g. indi-cate if contributions are for full in-kind experimental equipment components – we have provideda rough direct cost estimate for many components in an appendix (see slide 10 and 11 athttps://indico.bnl.gov/event/7449/contributions/35863/attachments/27277/41597/EIC.Comp.Det.032020.eca.pptx, if contributions are for partial in-kind experimental equipment compo-nents, if contributions are for in-kind labor contributions, etc.)
Please indicate if there are timing constraints to your submission: (e.g., indicate any known oranticipated timing profile assumed in your EOI. This can include anticipated time frames folding in constraints due to ongoing commitments, due to ongoing R&D and its anticipated completion date, etc.)
45
46
(****) Other Info
47
Please indicate any other information you feel will be helpful: (e.g., this could be things like as-sembly and storage space at your institute, clean rooms and class, special skills or machine shops, or perhaps some pointers to past accomplishments – you can expand on those in an appendix. If you could make existing engineering, design or technician labor available to the EIC experimentalequipment but would rely on funds coming from the EIC Project you can also list those here)
48
49
50
(**) Assumptions about items from EIC Project
51
Please indicate what, if any, assumptions you made as coming from the EIC Project or the labs for your items of interest: (e.g., indicate if you include engineering and design activities or assume those to come from the EIC Project, if you assume certain material costs to be covered by the EIC Project, if you rely on existing capabilities at the labs, etc. Try to be as inclusive as you can be.)
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100