A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | ||||||||||||||||||||||||||
2 | Please fill in by adding your name, insitute, and your interests in partecipation | |||||||||||||||||||||||||
3 | See more info at bottom of page for more info how to fill it in (see asterisks) | |||||||||||||||||||||||||
4 | For total labor see second tab | |||||||||||||||||||||||||
5 | ||||||||||||||||||||||||||
6 | FOR EOI ONLY | |||||||||||||||||||||||||
7 | Name | Institute | Interest in Consortium [Y/N] | Interest in EIC EOI [Y/N] | EIC Detector Interest for LGAD application | Potential Contributions (*) | Assumptions on Contributions (**) | Timing Constraints (***) | Other Info (****) | |||||||||||||||||
8 | Wei Li | Rice | Y | Y | 4D tracker, TOF | |||||||||||||||||||||
9 | Alessandro Tricoli | BNL | Y | Y | Roman Pot, 4D tracker, TOF | Fully equipped test lab for full characterisation of (AC-)LGAD sensor prototypes and their readout with testboards. Expertise will include a physicist, two postdocs and summer students. | Equipment, test lab and expertise are available at BNL. | Work is already underway | In the test lab we can provide measurements of timing and space resolution, charge collection efficiencies, with probe stations, radioactive sources and lasers, in warm and cold conditions, data analysis, readout boards. | |||||||||||||||||
10 | Gabriele Giacomini | BNL | Y | Y | Roman Pot, 4D tracker, TOF | Fully equipped clean rooms for fabrications of (AC-)LGADs, as well as sensor design and testing. Expertise will include a scientist and a technician. | Design capabilities (TCAD license and expertise) as well as equipment and clean rooms are available at BNL, whereas for fabrication of sensor prototypes (e.g. M&S and manpower) projects funds are assumed | Work is already underway | In BNL's Instrumentation Division we can design and fabricate sesnors, provide wire and bump bonding of test assemblies, test stations electrical equipment for testing | |||||||||||||||||
11 | Xuan Li | LANL | Y | Y | Hadron going silicon veretx/tracking detector integration with TOF | |||||||||||||||||||||
12 | Artur Apresyan | FNAL | Y | Y | 4D tracker, TOF | |||||||||||||||||||||
13 | Abe Seiden | UCSC | Y | Y | 4D tracker, TOF | Measurments on number of AC-LGADS | Funded internally for next year. If ramp up will need EIC funding. | Work is already underway, can continue for a few years. | ||||||||||||||||||
14 | Hartmut Sadrozinski | UCSC | Y | Y | 4D tracker | Measurments on number of AC-LGADS | Funded internally for next year. If ramp up will need EIC funding. | Work is already underway, can continue for a few years. | ||||||||||||||||||
15 | Simone Mazza | UCSC | Y | Y | 4D tracker, TOF | Measurments on number of AC-LGADS | Funded internally for next year. If ramp up will need EIC funding. | Work is already underway, can continue for a few years. | ||||||||||||||||||
16 | Bruce Schumm | UCSC | Y | Y | 4D tracker, TOF | Measurments on number of AC-LGADS | Funded internally for next year. If ramp up will need EIC funding. | Work is already underway, can continue for a few years. | ||||||||||||||||||
17 | Zhenyu Ye | UIC | Y | Y | TOPSide, 4D tracker, TOF, Roman Pot | |||||||||||||||||||||
18 | Olga Evdokimov | UIC | Y | Y | 4D tracker, TOF | |||||||||||||||||||||
19 | Zein-Eddine Meziani | ANL | Y | Y | TOPSiDE, 4D tracker, TOF, hybrid LGAD/SOI tracker | LGAD R&D, readout electronics, mechanical engineering and construction | Already internally funded by Argonne | |||||||||||||||||||
20 | Whitney Armstrong | ANL | Y | Y | TOPSiDE, 4D tracker, TOF, hybrid LGAD/SOI tracker | LGAD R&D, readout electronics, mechanical engineering and construction | Already internally funded by Argonne | |||||||||||||||||||
21 | Sylvester Joosten | ANL | Y | Y | TOPSiDE, 4D tracker, TOF, hybrid LGAD/SOI tracker | LGAD R&D, readout electronics, mechanical engineering and construction | Already internally funded by Argonne | |||||||||||||||||||
22 | Jessica Metcalfe | ANL | Y | Y | TOPSiDE, 4D tracker, TOF, hybrid LGAD/SOI tracker | LGAD R&D, readout electronics, mechanical engineering and construction | Already internally funded by Argonne | |||||||||||||||||||
23 | Manoj Jadhav | ANL | Y | Y | TOPSiDE, 4D tracker, TOF, hybrid LGAD/SOI tracker | LGAD R&D, readout electronics, mechanical engineering and construction | Already internally funded by Argonne | |||||||||||||||||||
24 | Angelo Dragone | SLAC | Y | 4D tracker, TOF, ASICs | ||||||||||||||||||||||
25 | Chris Kenney | SLAC | Y | 4D tracker, TOF, Sensors | ||||||||||||||||||||||
26 | Charlie Young | SLAC | Y | Beyond 3D silicon tracker | ||||||||||||||||||||||
27 | Ariel Schwartzman | SLAC | Y | 4D tracker | ||||||||||||||||||||||
28 | Julie Segal | SLAC | Y | 4D tracker, TOF, Sensors | ||||||||||||||||||||||
29 | Christophe Royon | KU | Y | Y | Si TOF timing detectors (electronics, sensors, tests) | full tests (laser, source, oscilloscope), electronics, lab fully equiped | Additional resources for people (post-doc) | Work is underway for other projects (NASA) so lab is ready | ||||||||||||||||||
30 | Constantin Loizides | ORNL | Y | Y | Tracking, TOF + general readout system | TBD | TBD | TBD | Scope has to fit in ORNL EIC EOI (and other EOI) proposal related to silicon tracking and readout systems | |||||||||||||||||
31 | Frank Geurts | Rice | Y | Y | 4D tracker, TOF | |||||||||||||||||||||
32 | Cinzia Da VIa | SUNY | Y | Y | Si TOF timing detectors (electronics, sensors, tests) | Tests on existing LGADS with pixel electronics | One graduate student in CY 2021 | |||||||||||||||||||
33 | Bolek Wyslouch | MIT | Y | Y | 4D Tracker, TOF | Mechanics and cooling | Assuming participation from Bates Research and Engineering Center at MIT | Part of MIT EIC effort, we can provide mechanical engineering support at this stage | ||||||||||||||||||
34 | Rachid Nouicer | BNL | Y | Y | 4pi Silicon Hybrid Tracker (SOI,LGAD), TOPSIDE | Detector construction | Assembly/testing/equipments lab (2-211) and expertise are available at BNL Physics Department | |||||||||||||||||||
35 | Laurent Serin | IJCLab | Y | Roman Pot ASIC | ASIC + tests | under assumption of funding by Funding Agency (IN2P3/CNRS) | Construction of ATLAS HGTD up to 2025) | |||||||||||||||||||
36 | Carlos Munoz Camacho | IJCLab | Y | Y | Roman Pot | ASIC + tests | ||||||||||||||||||||
37 | Janusz J. Chwastowski | IFJ PAN | Y | Y | Roman Pot: | test beam data analysis, simulations, reconstruction,alignment, irradiation tests | IFJ PAN contribution depends on obtaining a proper funding from Polish Goverment | presently involved in the ATLAS experiment: the ATLAS Roman Pot system; up 2028? | on-site irradiation tests using the proton cyclotron: energies 5 MeV to 230 MeV; also non-uniform irradiation tests | |||||||||||||||||
38 | Rafał Staszewski | IFJ PAN | Y | Y | Roman Pot | test beam data analysis, simulations, reconstruction,alignment, irradiation tests | ||||||||||||||||||||
39 | Maciej Trzebiński | IFJ PAN | Y | Y | Roman Pot | test beam data analysis, simulations, reconstruction,alignment, irradiation tests | ||||||||||||||||||||
40 | Jacek Świerblewski | IFJ PAN | Y | Roman Pot | mechanics, design, construction, intergration with the EIC | From 2022; Presently at XFEL, ITER, ESS | ||||||||||||||||||||
41 | Alexander Kiselev | BNL | Y | Roman Pot, 4D detectors | Tracking, timing. Charge sharing pad design. Have DRS4 electronics in the lab (used for LAPPD-related project). Expertise in C++ coding, small scale DAQ setups. Several beam test campaigns at FTBF. | |||||||||||||||||||||
42 | Salvatore Fazio | BNL | Y | Roman Pot | test beam data analysis, simulations | |||||||||||||||||||||
43 | (*) Potential contributions are for each item of interest | (***) Time Constraints | ||||||||||||||||||||||||
44 | Please indicate what the level of potential contributions are for each item of interest: (e.g. indi-cate if contributions are for full in-kind experimental equipment components – we have provideda rough direct cost estimate for many components in an appendix (see slide 10 and 11 athttps://indico.bnl.gov/event/7449/contributions/35863/attachments/27277/41597/EIC.Comp.Det.032020.eca.pptx, if contributions are for partial in-kind experimental equipment compo-nents, if contributions are for in-kind labor contributions, etc.) | Please indicate if there are timing constraints to your submission: (e.g., indicate any known oranticipated timing profile assumed in your EOI. This can include anticipated time frames folding in constraints due to ongoing commitments, due to ongoing R&D and its anticipated completion date, etc.) | ||||||||||||||||||||||||
45 | ||||||||||||||||||||||||||
46 | (****) Other Info | |||||||||||||||||||||||||
47 | Please indicate any other information you feel will be helpful: (e.g., this could be things like as-sembly and storage space at your institute, clean rooms and class, special skills or machine shops, or perhaps some pointers to past accomplishments – you can expand on those in an appendix. If you could make existing engineering, design or technician labor available to the EIC experimentalequipment but would rely on funds coming from the EIC Project you can also list those here) | |||||||||||||||||||||||||
48 | ||||||||||||||||||||||||||
49 | ||||||||||||||||||||||||||
50 | (**) Assumptions about items from EIC Project | |||||||||||||||||||||||||
51 | Please indicate what, if any, assumptions you made as coming from the EIC Project or the labs for your items of interest: (e.g., indicate if you include engineering and design activities or assume those to come from the EIC Project, if you assume certain material costs to be covered by the EIC Project, if you rely on existing capabilities at the labs, etc. Try to be as inclusive as you can be.) | |||||||||||||||||||||||||
52 | ||||||||||||||||||||||||||
53 | ||||||||||||||||||||||||||
54 | ||||||||||||||||||||||||||
55 | ||||||||||||||||||||||||||
56 | ||||||||||||||||||||||||||
57 | ||||||||||||||||||||||||||
58 | ||||||||||||||||||||||||||
59 | ||||||||||||||||||||||||||
60 | ||||||||||||||||||||||||||
61 | ||||||||||||||||||||||||||
62 | ||||||||||||||||||||||||||
63 | ||||||||||||||||||||||||||
64 | ||||||||||||||||||||||||||
65 | ||||||||||||||||||||||||||
66 | ||||||||||||||||||||||||||
67 | ||||||||||||||||||||||||||
68 | ||||||||||||||||||||||||||
69 | ||||||||||||||||||||||||||
70 | ||||||||||||||||||||||||||
71 | ||||||||||||||||||||||||||
72 | ||||||||||||||||||||||||||
73 | ||||||||||||||||||||||||||
74 | ||||||||||||||||||||||||||
75 | ||||||||||||||||||||||||||
76 | ||||||||||||||||||||||||||
77 | ||||||||||||||||||||||||||
78 | ||||||||||||||||||||||||||
79 | ||||||||||||||||||||||||||
80 | ||||||||||||||||||||||||||
81 | ||||||||||||||||||||||||||
82 | ||||||||||||||||||||||||||
83 | ||||||||||||||||||||||||||
84 | ||||||||||||||||||||||||||
85 | ||||||||||||||||||||||||||
86 | ||||||||||||||||||||||||||
87 | ||||||||||||||||||||||||||
88 | ||||||||||||||||||||||||||
89 | ||||||||||||||||||||||||||
90 | ||||||||||||||||||||||||||
91 | ||||||||||||||||||||||||||
92 | ||||||||||||||||||||||||||
93 | ||||||||||||||||||||||||||
94 | ||||||||||||||||||||||||||
95 | ||||||||||||||||||||||||||
96 | ||||||||||||||||||||||||||
97 | ||||||||||||||||||||||||||
98 | ||||||||||||||||||||||||||
99 | ||||||||||||||||||||||||||
100 |