DOC-1.0-001Rev 1Up Rev Change Order Check ListEffectiveness Date10/16/23
3
4
5
PO#(s) Affected:
Customer:Date of Up Rev:Completion Date:
6
Part Number (Top Assy, etc.):Current Rev:New Rev:
7
Total # of Jobs Affected:
8
Total # of Parts Affected:Inventory Checked:Yes / No
9
Does Rev Change Affect Fit, Form or Function of the Part:
10
Solid Model Received and Reviewed:Yes / NoBy who:
11
Revised PO Received:Yes / No Yes/No
12
13
Required Personnel:
(If more than one in a department then sign and date multiple. No N/A required if no signature)
SignDateSign DateSignDate
14
Programming
15
Doc Control
The highlighted Fields are required to be filled out.
16
CSR
17
PE
18
Scheduling
19
QA
20
Optional Personnel:
(If more than one in a department then sign and date multiple. No N/A required if no signature)
SignDateSign DateSignDate
21
DOM
22
DOO
23
Leads
24
Material
25
Tooling
26
Finance
27
Other
28
29
How to pull list of jobs to up rev:
30
1) Get list of all PO's that are affected by Up Rev Change Order
2) Go into E2 Shop Control, Production Summary
3) Filter by "Cust P.O. Number Like" and enter in the purchase order number you are looking for and hit enter

This will pull up a list of all open jobs for that purchase order, along with the quantity of parts at each routing step per job which makes it easier to identify where the physical traveler would be.
A copy of the change order checklist as well as the list of all open jobs for that purchase order goes to the Scheduling team and to Doc Control to check off the jobs when they have completed their task.
The original copy will remain with the CSR who will monitor the process and ensure all items are completed within the allotted time frame. All personnel required to sign and date the section below MUST sign and date the original copy with the CSR. You cannot sign and date for another employee.
This shall be saved in the customer folder under: O:\..MASTER CUSTOMER FOLDER\6_ACCEPTANCE RECORDS\1_RISK MANAGEMENT FORM & SHIPPING INSTRUCTIONS\UP REV CHANGE ORDER CHECK LIST.
***Please reopen all job requirements applicable***
31
32
**One line below at a minimum is required. Put N/A if not required on that one minimum lineO:Drive CheckERP System CheckPhysical Documentation Check
33
Items
Part Number
Date Drawing ReceivedDrawings in O:DriveSolid Models in O:DriveInternal/ Supplemental Drawings in O:DriveJobs UpdatedEstimates UpdatedDrawing fixed in Doc Control and any notes transferred overFAI/SPC UpdateJob Travelers FAI/SPCDrawingQA program saved
(if applicable)
MFG Program SavedVerification Sign off of All items to Left
34
35
36
37
38
39
40
Purge of Down Rev Parts: Yes/No
Are their any parts that cannot be modified to new revision request: Yes/No
Offered to Customer: Yes/No
41
42
Notes:
43
44
45
46
47
48
DOC-1.0-001Rev 1Effective: 10/16/23
If printed this document is considered uncontrolled and "For Reference Only"
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100