Deep Footing Design Based on ACI 318-02
6
7
INPUT DATA
8
PEDESTAL DIAMETER
c=60in
9
SQUARE FOOTING LENGTH
L=18ft
10
FOOTING EMBEDMENT DEPTH
Df=10.5ft
11
FOOTING THICKNESS
T=18in
12
WATER TABLE
h=8ft
13
CONCRETE STRENGTH
fc'=3ksi
14
REBAR YIELD STRESS
fy=60ksi
15
AXIAL DEAD LOAD
PDL=73.1k
16
AXIAL LIVE LOAD
PLL=365.4k
17
LATERAL LOAD (0=WIND, 1=SEISMIC)
=0
Wind,ASD
18
WIND AXIAL LOAD
PLAT=-79.175
k, ASD, uplift
19
WIND MOMENT LOAD
MLAT=867.4125ft-k, ASD
20
WIND SHEAR LOAD
VLAT=11.95k, ASD
21
SURCHARGE
qs=0.1ksf
22
BBACKFILL SOIL WEIGHT
ws=0.1kcf
23
ALLOW SOIL PRESSURE
Qa=4ksf
24
FOOTING REINFORCING SIZE
#10
25
PEDESTAL VERT. REINF. SIZE
22 #10vertical
26
PEDESTAL SHEAR. REINF.
#4spiral @3in o.c.
27
28
DESIGN SUMMARY
29
TOP FOOTING REINF., E. WAY =>
6 # 10
30
BOT. FOOTING REINF., E. WAY =>
29 # 10 @ 7 in o.c.
THE FOOTING DESIGN IS ADEQUATE.
31
32
33
ANALYSIS
34
DESIGN LOADS (IBC SEC.1605.3.2 & ACI 318-02 SEC.9.2.1)
35
CASE 1:DL + LLP=439kips
1.2 DL + 1.6 LL
Pu=672kips
36
CASE 2:
DL + LL + 1.3 W
P=336kips
1.2 DL + LL + 1.6 W
Pu=326kips
37
M=1128ft-kipsMu=1388ft-kips
38
e=3.4ft, fr cl ftgeu=4.3ft, fr cl ftg
39
CASE 3:
DL + LL + 0.65 W
P=387kips
0.9 DL+ 1.6 W
Pu=-61kips
40
M=434ft-kipsMu=1388ft-kips
41
e=1.1ft, fr cl ftgeu=-22.8ft, fr cl ftg
42
43
CHECK OVERTURNING FACTOR
44
MR / MO =
2.284438012>F = 1.5
[Satisfactory]
45
WhereMO =
MLAT + VLAT Df - 0.5 PLATL =
1705k-ft
46
Pftg =
(0.15 kcf) [T L2 + (p c2/ 4)(Df - T)] =
99.41
k, footing weight
47
wsat =
ws + 0.018 kcf =
0.118
kcf, saturated soil weight
48
wwater =
0.0625
kcf, water specifc weight
49
Psoil =
[ws MIN(h, Df -T)+ (wsat - wwater) MAX(Df - T - h, 0)] (L2 - p c2/ 4) =
260.3842968k, soil wt
50
MR =
0.5 (PDL + Pftg + Psoil) L =
3896k-ft
51
F = 1.5 for wind, IBC 1609.1.3
52
53
CHECK UPLIFT CAPACITY
54
FGravity / FUplift =
7.55168121>1.0
[Satisfactory]
55
WhereFUplift = - PLAT =79.2k
56
Pftg =99.41
k, footing weight
57
Psoil =425.40
k, soil weight with 30o pyramid
58
FGravity =
PDL+ Pftg+ Psoil =
597.90k4
59
60
61
62
(cont'd)
63
CHECK SOIL BEARING CAPACITY (ACI 318-02 SEC.15.2.2)
64
65
Service Loads
CASE 1CASE 2CASE 3
66
P438.5335.6387.0k
67
e0.03.41.1
ft, (from center of footing)
68
qs L232.432.432.4
k, (surcharge load)
69
DPftg33.133.133.1
k, (footing increased)
70
S P504.0401.1452.6k
71
S M0.01290.8496.4
k-ft, (VLat included)
72
e0.0< L/63.2> L/61.1< L/6ft
73
qmax1.62.61.9ksf
74
qallow4.05.35.3ksf
75
76
Where
77
78
[Satisfactory]
79
80
81
82
83
DESIGN FOOTING FLEXURE & CHECK FLEXURE SHEAR
84
(ACI 318-02 SEC.15.4.2, 10.2, 10.3.5, 10.5.4, 7.12.2, 12.2, 12.5, 15.5.2, 11.1.3.1, & 11.3)
85
86
87
88
89
90
91
92
93
94
95
96
97
FACTORED SOIL PRESSURE
98
Factored Loads
CASE 1CASE 2CASE 3
99
Pu672.4326.4-60.9k
100
eu0.04.3-22.8ft