ABCDEFGHIJKLMNOPQRSTUVWXYZ
1
PROPOSED CONSTRUCTION OF SITE OFFICE CARETAKER HOUSE 4m x4m & 4mX5m
2
ItemDescriptionUnitQtyRate Amount
3
Sub Structure & superstructure works
4
A Allow for digging 8 x 8 x 15 ft Septic tankFt 15 -
5
6
B Supply Foundation 200mm thick stonesPcs 250 -
7
8
C Supply of 9 x 9 machine cut stonesPcs 600 -
9
10
D Supply of tonnes River Sand Tons 12 -
11
12
E Supply of tonnes Ballast Tons 8 -
13
14
F Supply of bags of ordinary cement Bags 60 -
15
16
G Supply of full length Y12 barsPcs 18 -
17
18
H Supply of Rolls of Mukwa HoopsRolls 2 -
19
20
I Supply of of 6 x 1 timberFt 250 -
21
22
J Supply of 10 pcs of straight polesPcs 10 -
23
24
K Supply of NailsKgs 8 -
25
26
L Supply of 1 Roll of binding wireRoll 1 -
27
28
M Supply of 2 pcs 4“waste pipe @ 1,800Pcs 2 -
29
30
N Truck of waterLtrs 10,000 -
31
32
Roof works
33
O Supply of 14 pcs of roof sheetsPcs 14 -
34
35
P Supply of 4 x 2 roof timberFt 200 -
36
37
Q Supply of 2 x 2 roof timberFt 150 -
38
39
R Supply of 8 x 1 facia boardFt 80 -
40
41
S Supply of 15 Kg NailsKgs 15 -
42
43
T Supply of 5 Kg Roof NailsKgs 15 -
44
45
U Supply of roofing washersPkts 5 -
46
47
V Supply of 4 x 1 paintsTin 3 -
48
49
X Supply of 20Kg Wood preservativeTin 1 -
50
51
Y Supply of 6 pcs ceiling boardNo. 6 -
52
53
Z Supply of 30 ft coniceFt 120 -
54
55
Z1 Supply WC complete No. 1 -
56
57
ItemDescriptionUnitQtyRate Amount
58
59
Doors
60
A Allow for steel doorsNo. 3 -
61
62
B Allow for steel windowsNo. 6 -
63
64
C Allow for the supply and installation of 3000 litres water tank inclusive of raised support structureItem
65
66
67
68
69
Sub Total Materials -
70
Transport
71
Labour -
72
Management fee 10% -
73
Totals -
74
75
NB; CONTRACTOR MUST VISIT SITE BEFORE QUOTING AND ASCERTAIN THE
76
SCOPE. CONTRACTOR FREE TO QUANTIFY ANY ITEM THAT IS DEEMED LEFT OUT OF THE BQ
77
78
SAMPLE DESIGN IS ATTACHED BUT SUBJECT TO MINOR CHANGES AT SITE