EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
2
3
ItemDescriptionQtyUnitRateAmount
4
0(SR)(SR)
5
6
02 SITE CONSTRUCTION
7
8
The Contractor is referred to the specifications and drawings for all details related to the works of this division and he is to include for complying with all the requirements contained therein, whether or not they are specifically mentioned within the i
9
10
02300 EXCAVATION
11
12
NOTE: Excavation quantities are based on the assumption that rock layers are found at a depth less than 1.25 m from the natural ground level.
13
14
AMat Foundations715m324.5017,517.50
15
0.00
16
BIsolated Footings470m330.6014,382.00
17
0.00
18
CGrade Beams83m336.703,046.10
19
0.00
20
02300 FILLING0.00
21
0.00
22
DCompacted replacement granual material fill1321m324.5032,364.50
23
24
25
26
02 SITE CONSTRUCTION
27
To Building SummaryS.R67,310.10
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100