ABCDEFGHIJKLMNOPQRSTUVWXYZ
1
Project Intake Form
2
3
4
5
6
Customer InformationInputsComments
7
Name
8
Email
9
Position
10
Company Name
11
Project Highlights
12
Project Name
13
Project location
14
Technical DetailsInputsComments / Sample Inputs
15
Required power kW or MW
16
Required capacity (or duration at full power) kWh or MWH
17
Is required capacity measure at BOL or EOL?BOL (Beginning of Life) or EOL (End of Life)
18
Contract Term if required capacity is EOLYears
19
Point of InterconnectionAt the storage inverter AC terminals or high side of the transformer
20
Are AUX loads considered in required capacity?yes/no
21
Application/use casePeak shaving, demand response, backup/off-grid
22
Can power be exported to the grid?yes/no
23
Average loadkW
24
Peak loadkW
25
Average daily usagekWh
26
Estimated cycles per day1 cycle/day
27
Generation Assets
28
PV arrayyes/no; if yes, list size in kW and if new or existing
29
PV inverter(s)manufacturer
30
Generatoryes/no; if yes, list size in kW
31
Other
32
AC Interconnection
33
AC voltage magnitude
34
Three phase or Single Phase
35
Configuration: delta or wye
36
Main service panelList size in amps
37
Regulatory
38
Any specific certifications required?UL1741 Supp SA, UL 9540A, NFPA 855, etc.
39
Site Conditions
40
Single Line Diagram of proposed system available?
If so, please provide (can be a rough sketch)
41
Internet Connection at the site?
42
Indoor/Outdoor installation
43
New construction or adding storage to existing site
44
Any physical constraintsfootprint, height
45
Minimum operational temperaturespecify C or F
46
Maximum operational temperaturespecify C or F
47
Noise Constraintsdefine limits and location of measurement
48
Any extreme conditions: elevated ambient, salt spray, high altitude, etc.
49
Seismic-Zoning
50
Warranty
51
Standard warranty2 year material/workmanship and 5 year parts only
52
5 Year Additional (10 Year Total) Parts Only Warranty Extension
yes/no: 10% of the BESS cost
53
10 Year Additional (15 Year Total) Parts Only Warranty Extension
yes/no: 20% of the BESS cost
54
Project Status
55
Target equipment delivery date
56
Target project COD (commercial operation date)
57
Project award status (as applicable)working on bid, short listed, won
58
Interconnection Application statusnot-submitted, submitted, approved
59
Site Controlowned, leased
60
Financingsources (secured / not-secured)
61
Additional Information
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100