Schedule-Modeling Worksheet
 Share
The version of the browser you are using is no longer supported. Please upgrade to a supported browser.Dismiss

View only
 
ABCDEFGHIJKLMNOPQRSTUVWXYZ
1
Baseline Dataset (Don't Change this One)Modeling Dataset (Try adjusting some of the variables to see the effects)
2
Some of our Fixed "Knowns" about our Site and PlansUnitsSome of our Fixed "Knowns" about our Site and PlansUnits
3
Volume Required to Excavate90cubic metersVolume Required to Excavate90cubic meters
4
Proposed Test Unit Level Size0.1metersProposed Test Unit Level Size0.1meters
5
Proposed Test Unit Size (1 x 1 m)1square metersProposed Test Unit Size (1 x 1 m)1square meters
6
Depth of Site Deposits2.5metersDepth of Site Deposits2.5meters
7
8
Calculating Rough Number of Test Units to ExpectCalculating Rough Number of Test Units to Expect
9
Volume to Excavate90cubic metersVolume to Excavate90cubic meters
10
Average Maximum Unit Depth2.5metersAverage Maximum Unit Depth3.5meters
11
Planned Number of Test Units36UnitsPlanned Number of Test Units26Units
12
13
Calculating the ScheduleCalculating the Schedule
14
Volume Required to Excavate90cubic metersVolume Required to Excavate90cubic meters
15
Proposed Test Unit Level Size0.1metersProposed Test Unit Level Size0.1meters
16
Number of Levels to Excavate900Unit LevelsNumber of Levels to Excavate900Unit Levels
17
Levels Excavated Per Person Per Day
1Levels/Person/Day
Levels Excavated Per Person Per Day
3Levels/Person/Day
18
Days to Complete Excavation900Days/PersonDays to Complete Excavation300Days/Person
19
Crew Size6PeopleCrew Size8People
20
Field Days150DaysField Days38Days
21
Translate that into Calendar Durations
Translate that into Calendar Durations
22
Work Days per Week5DaysWork Days per Week5Days
23
Weeks of Fieldwork30WeeksWeeks of Fieldwork7.6Weeks
24
Months of Fieldwork7.5MonthsMonths of Fieldwork1.9Months
25
26
Artifact PredictorArtifact Predictor
27
Volume Required to Excavate90cubic metersVolume Required to Excavate90cubic meters
28
Estimated Number of Artifact Density
500
Artifacts per cubic meter
Estimated Number of Artifact Density
2000
Artifacts per cubic meter
29
Number of Artifacts Anticipated45,000ArtifactsNumber of Artifacts Anticipated180,000Artifacts
30
Time to Clean and Curate One Artifact
1Minutes
Time to Clean and Curate One Artifact
0.5Minutes
31
Total Time to Curate All Artifacts45,000MinutesTotal Time to Curate All Artifacts360,000Minutes
32
Total Time to Curate All Artifacts750HoursTotal Time to Curate All Artifacts6000Hours
33
Work Days to Curate All Artifacts94DaysWork Days to Curate All Artifacts750Days
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
Loading...