ABCDEFGHIJKLMNOPQRSTUVWXY
1
Inventory of Training Rooms and Data Processing Spaces for 2024 POPCEN-CBMS ImplementationGoogle Drive: https://drive.google.com/drive/u/0/folders/10bwzauA5U5QsVxreVwWNwEdZ2gUwg-_L
2
3
Training RoomData Processing Center
4
RSSO/PSOTraining RoomTotal CapacityTotal Area
Measurement
in Square Meter
RemarksData Processing
Center
Total CapacityCurrent PCs
available
Total Area
Measurement
in Square Meter
Remarks
5
NCR
6
RSSO NCRTraining Room 150100 sqm112030 sqm3 PCs stationed in processing room runs on Window 7
7
NCR ITraining Room 12556 sqm00150No available space in provincial office. Upcoming surveys and censuses were taken into consideration is deriving the number of available PCs
8
NCR IINonePreviously available rooms already utilized for other PSA projects as storage/processing1202040 sqmWith 5 racks installed used for filing Currently occupied for processing of maps (EA delineation for 2024 POPCEN-CBMS)
9
NCR IIITraining Room 160120 sqm1352560 sqm
10
NCR IVTraining Room 148158 sqm14025155 sqm
11
NCR VTraining Room 13674 sqm1253650 sqmCurrently occupied for processing of POPCEN_CBMS EA delineation
12
CAR
13
RSSO CARTraining Room 12550 sqmBeing used for other trainings/activities of the region. Can be used as training room if available.Data Processing Center 18218 sqm
14
Data Processing Center 216-38 sqmEnclosed area which can be used as DP area. No tables and chairs for processors.
15
AbraTraining Room 11515.6 sqmWithout CP Unit Conference RoomData Processing 1101213.75 sqm
16
Data Processing 251213.81 sqmLibrary
17
ApayaoTraining Room 12030 sqmData Processing Center 1202230 sqm
18
BenguetTraining Room 11214.61 sqmThe Conference Room is being used as processing center/training room for the regular activities (Agri surveys, LFS/APIS, CPBI, etc.)Data Processing Center 172010 sqmThe Computer Room in the provincial office is also used as processing area for the regular activities (Agri surveys,LFS/APIS CPBI, etc.).
19
Ifugao---To be rented, no available training room in our office.--14-To be rented, no availabe training room in our office.
20
KalingaTraining Room 12048 sqmData Processing Center 1301380 sqmCan be converted as Training Room if no data processing activities are conducted.
21
Mountain ProvinceTraining Room 11532 sqmThe training room will be utilized as the Data Processing CenterData Processing Center 1151032 sqmThe DPC is an open area at the PSO and is not an enclosed room to be exclusively for CBMS DPC.
22
Region I
23
RSSO ITraining Room 140125 sqmSOCD - Conference Room0N/A12N/A
24
Ilocos NorteTraining Room 125120 sqm112735 sqm
25
Ilocos SurTraining Room 13548 sqm115921.86 sqm
26
La UnionTraining Room 12045 sqmUtilized during regular PSO Staff/C/MCRs' meetings, and trainings on household-based, and establishment based monthly/quarterly/annual surveys1101722.45 sqmUtilized during regular data processing for household-based, agriculture-based and establishment-based monthly/quarterly/annual surveys
27
PangasinanTraining Room 13058 sqm.Conference Room16030124 sqmOther PCs are currently used in FIES, CAF and EA Delineation Processing
28
Region II
29
RSSO II13090.89 sqmConference Room1201857.6 sqmProcessing Center
30
Batanes11018 sqmN/AN/AN/AN/AN/A
31
CagayanNoneNoneNoneNo available training rooms in the office1303052 sqm
32
IsabelaNoneNoneNoneNo available training rooms in the office13016200 sqmWithin the Provincial Office
33
Nueva Vizcaya14099.3 sqm118843.2 sqm
34
QuirinoNoneNoneNoneNo available training rooms in the officeNoneNone6NoneNo available processing room in the office
35
Region III
36
RSSO III14589.8 sqm110737.5 sqmCurrently used for CAF Processing and venue for the monthly Inflation Rate Press Conference
37
Aurora11535.7 sqmTraining Room/Conference Room1131112.08 sqmPCs used for CBMS = 2 PCs used for CAF = 3 (Server, Firewall, Backup) PCs used for FIES = 6
38
Bataan 12030 sqmWith cabinets and equipments used for other activitiesN/AN/A18N/A
39
Bulacan14064 sqmProcessing area for mapping activities with PC set up1405164 sqm51 PCs currently used in IPM to end
this March
40
Nueva Ecija120The designated Training Room is being used for other PSA activities1105830 sqm
41
Pamapanga12548 sqm14012120 sqm
42
Tarlac130100 sqmThe Philsys Fixed Registration Center is also used as Training room13020100 sqm
43
ZambalesN/A00The designated training room is used as Data Processing Center2355100 sqmData Processing Center 1-40 sqm (capacity-15 pax) (located in main PSO in Brgy Pag-asa) Data Processing Center 2-60 sqm (capacity-20 pax) (located in PhilSys FRC in Brgy Kalaklan) DPC 1 - currently used in FIES processing; 10 computers used DPC 2 - currently used in EA Delineation; 13 computers used
44
Region IV-A
45
RSSO IV-ATraining Room2459.66 sqmClassroom type set-upData Processing Center24754.06 sqm
46
Batangas NoneUsed as processing centerData Processing Center30-3576150 sqm
47
CaviteTraining Room 1 2884 sqmData Processing Center100103200 sqmPart of the Provincial Government with plan to demolish
48
Training Room 22540 sqmPart of the Provincial Government with plan to demolish; shared with other National Government Agencies
49
LagunaTraining Room2570 sqm
Not enough space for social distancing
Data Processing Center 1255170 sqmDesktop units from: IPM(51)
50
Data Processing Center 23030100 sqmDesktop units from: CBMS (15) and 2020 CPH (15)
51
QuezonTraining Room2460 sqmData Processing Center4050162.85 sqmAlso served as stockroom of unused equipment, supplies, etc.
52
RizalTraining Room30100 sqmData Processing Center 13048100 sqm11 units for CBMS data processing, 7 units for CBMS map processing, 30 units for geotagging (crowded set-up)
53
Data Processing Center 2300100 sqmBeing used for processing of CAF and other agriculture and household-based surveys
54
MIMAROPA
55
RSSO MIMAROPATraining Room 150150 sqm17720 sqm
56
MarinduqueTraining Room 11535 sqm3rd floor1203528.5 sqm
57
Occidental Mindoro---No available training room1244456.25 sqmInsufficient office space
58
Oriental MindoroTraining Room 13065 sqm1322445 sqmOngoing data processing of 2022 CAF
59
PalawanTraining Room 11632 sqmVenue of the Monthly Inflation Report Press Conference. Used by permanent employees to conduct regular monthly, and quarterly survey 3rd level trainings.14254102 sqm
60
23094 sqm
61
Romblon---None1204930 sqmAt Multipurpose room
62
Region V
63
RSSO VTraining Room 125-30100 sqmConference Room, Classroom Type110-158100 sqm
64
TRaining Room 21050 sqmWellness Area, Classroom Type
65
AlbayTraining Room 12057.40 sqmNoneN/A34N/A
66
Camarines NorteTraining Room 11247.88 sqmWithin the PSA PSO BuildingNoneN/A19N/AA portion in the Training Room is converted into Data Processing Center if needed up to 7 pax only.
67
Camarines SurTRaining Room 12530 sqmBeing used as training room in various activities/surveys1306070 sqmBeing used as processing center of other surveys
68
CatanduanesTraining Room 12536 sqmBeing used in regular conduct of briefings and trainings of surveysNone83612 sqmUses portion in the Training Room for Data Processing 21 PCs from CAF and 15 PCs from Mapping
69
Masbate Training Room 11640 sqmConference Room11925 (IPM PCs)
70
SorsogonNoneNoneNoneNoneNoneN/A40N/AThere is available space for processing, but it is being used and rented by PhilSys.
71
Region VI
72
RSSO VIPSA Learning and Development Center, 2nd Floor4280 sqmUsed every Monday for Flag Ceremony and serves as a venue for other office events like news conferences, training venue of Iloilo PSO, meeting, etc.SOCD Processing Room, 1st Floor10224 sqm Will be occupied for FIES Data Processing on April 11-May 8, 2024 with 4-7 processors
73
AklanNo Available Training RoomArea for training room was utilized as processing room
PSA Aklan, Conference Room
302281 sqmSame area utilized for Training Room
74
Antique
Training Conference Room
2528.8 sqmUsed as data processing center for various PSA surveys (LFS-FIES,Agri-fishery surveys). Flag ceremony and meetings are held all the hallway. CSS's office is used for small group meetings/conferences (F2F or online).None25An area of 7.43 sqm of Philsys Registration Center is being used for Map Processing. The training Room is used as data processing center for other PSA activities (LFS-FIES, Agri-fishery surveys).
75
CapizNoneNoneNoneCapiz Conference Room is used as data processing center for various PSA surveys (FIES, Mapping, LFS, Agri-fishery surveys)Conference Room252530 sqmCurrently used as processing room for FIES, CAF and Agri-Fishery Surveys
76
GuimarasConfeerence Room1040 sqmUtilized as the data processing center for various activities such as LFS/FIES, CAF, and Mapping; training venue for other projects; and used on Monday during the flaf ceremonyNone5Conference room is utilized as the DPC for various PSA activities (e.g. LFS/FIES, CAF, Mapping)
77
IloiloIPSO Training Room2560 sqmUtilized as the CAF data processing and EA Delineation room (Occupied by 38 prococessors)IPSO Processing Room163632 sqmCurrently used as processing room for CBMS and CAF (Occupied by a total of 31 processor)
78
Negros OccidentalNoneNoneNoneUsed as data processing centers for various PSA surveys (FIES, Mapping)PSA Negros Occidental Training Room403556 sqmCurrently occupied by Map DCata Reviewer
79
Region VII
80
RSSO VIINone N/AN/ANo available training roomNoneN/A1 DP unit 1 serverN/ARSSO Procured: 40 units + 1 server -these units were distributed to the provinces for CAF DPs as per email instruction from PSA CPS2022CAF with the following breakdowns: RSSO: 4 units + 1 server (retained in the RO). ** 3 units were currently used for CAF DPs Negros Oriental: 6 units Cebu: 11 units Bohol: 19 units
81
BoholNone N/AN/ANo available training roomNoneN/A76N/A
82
CebuTraining Room 12062.6 sqmNot conducive for learning: no proper ventilation, noisy environment (e.g., noise emitted by means of road traffic, industrial activity)DPC6089226 sqmDPC is the same with the above mentioned DPC for training room
83
Negros OrientalTraining Room 12040 sqm1605080 sqm
84
SiquijorTraining Room 13072 sqm1121334 sqm
85
Training Room 22064 sqm
86
Region VIII
87
RSSO VIIITraining Room 12048.75 sqmCurrently used as our Library room/conference room/media room16715.75 sqmas of 15 March 2024
88
BiliranTraining Room 11127 sqmCurrently used/occupied by LFS/FIES and 2023 CBMS processors191021 sqmcurrently used as processing area for the 2022 CAF
89
Eastern SamarTraining Room 11424 sqmLocated in the 2nd Floor1323680 sqmThe assumption that the 36 PCs are avilable if no other projects will utilize during the data processing period.
90
Training Room 23080 sqmLocated in the 4th Floor
91
LeyteTraining Room 145100 sqm14518100 sqm
92
Northern SamarTraining Room 112-1532 sqmInside PSA office1201172 sqmCurrently used for 2022/2023 CBMS processing
93
2201072 sqmCAF processing until March 31
94
3202072 sqmMap Data Processing/EA delineation-until 2nd week of March
95
SamarNoneN/AN/ARent only for office space for training outside the office premise1141566 sqmPersonnel included in DPC center: 1 PPA; 8 CAF; 3 CBMS; 1 Philsys ISA. Need to rent office space for 2024 CBMS-POPCEN data processing center outside the office.
96
Southern LeyteTraining Room 11525 sqm1101214 sqm
97
Region IX
98
RSSO IX12098 sqm1292225 sqm
99
2840 sqm2464649 sqm
100
3362165 sqm