ABCDEFGH
1
2
Project TitleProject NumberDesign Phase/
Items in Package
Review Deadline Date Location of Review DocumentsOnline Review of DocumentsScope of ProjectProject Manager
3
Renovation to Chemistry Teaching Lab 608 - Dabney Hall202135047100% CD

Drawings
Specifications
Friday, September 17, 2021 at 5:00 PMNAOnline documents available for review though Bluebeam Studio:https://studio.bluebeam.com/hyperlink.html?link=studio.bluebeam.com/sessions/434-028-565Renovation of 6th floor lab classroom to update it. Includes demolition, new flooring, equipment, with associated PME work, including connections to lab fume hoods. Casework & lab fixtures by Owner's vendor.Lisa Keel
Project Manager
Capital Project Management
Phone #: 919-515-8066
Email: llkeel@ncsu.edu
4
Electrical Distribution Upgrade201920030DD

Drawings
Specifications
Friday, September 17, 2021 at 5:00 PMNAOnline documents available for review though Bluebeam Studio:https://studio.bluebeam.com/hyperlink.html?link=studio.bluebeam.com/sessions/329-052-431The NC State campus between Western Blvd and Hillsborough St. has an aging underground electrical distribution system with components that have exceeded their useful life. The campus electrical infrastructure project will replace the aging infrastructure and install a new mainline loop configuration to improve resiliency, capacity, and safety. New underground ductbank, cables, manholes, and pad mounted switchgear for the electrical infrastructure improvements will be installed. The University will purchase and furnish to the contractor all pad mounted switchgear for installation.Melanie Butler
Project Manager
Capital Project Management
Phone #: 919-515-8059
Email: mdbodenh@ncsu.edu
5
Advance Planning Report for the Integrative Sciences Building202020005Planning

Report
Wednesday, September 29, 2021 at 5:00 PMNAOnline documents available for review though Bluebeam Studio:https://studio.bluebeam.com/join.html?ID=446-479-508The Integrative Sciences Building will further the mission of NC State University by providing much-needed STEM (science, technology, engineering, and mathematics) teaching and research space. It will be a catalyst for transforming the sciences at NC State. The building design will promote creativity and collaboration and will showcase and celebrate the sciences at NC State. It will be a flexible, interdisciplinary sciences building with a focus on chemistry, biochemistry and biotechnology. The building will be approximately 145,000 gross square feet (GSF) comprised of classrooms, teaching labs, research labs, research core facilities, collaboration/study space, and office space. The research/core facility space will be about 45% of the total space inventory. The Total Project Budget is $160M.Bob Cwikla
Project Manager
Capital Project Management
Phone #: 919-515-6836
Email: rmcwikla@ncsu.edu
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100