Project Review List & Deadlines
 Share
The version of the browser you are using is no longer supported. Please upgrade to a supported browser.Dismiss

 
View only
 
 
ABCDEFG
1
Facilities Division
Project Review List
2
Project TitleProject NumberDesign Phase/
Items in Package
Review Deadline Date Location of Review DocumentsScope of ProjectProject Manager
3
Exterior Lighting LED Conversion201620008Study

Draft Report
Friday, November 17, 2017 at 5 PMFile Slot #1
Review documents for the project are available for review in the Plan Review area located in the Administrative Services III Building, 2701 Sullivan Drive, Room 324.
The project will convert exterior public pole mounted lighting for roads, walks, drives, service lots, and pathways from existing lamp types to LED lamps and fixtures that meet the campus design standard.Damian Lallathin
Project Manager
Capital Project Management
Phone #: 919-513-0373
Email: dllallat@ncsu.edu
4
Steam Tunnel Structure Repairs201720058SD/DD

Drawings
Preliminary Project Manual
Tuesday, November 21, 2017 at 5 PMFile Slot #8
Review documents for the project are available for review in the Plan Review area located in the Administrative Services III Building, 2701 Sullivan Drive, Room 324.
This project involves repairs and renovations to approximately 1-mile of steam tunnels on North Main Campus plus some realignment of some pedestrian steps.Steve Bostian
Project Manager
Capital Project Management
Phone #: 919-515-8059
Email: srbostia@ncsu.edu
5
Dearstyne HVAC Renovations201611034CD

Drawings
Specifications
Wednesday, November 22, 2017 at 5 PMFile Slot #4
Review documents for the project are available for review in the Plan Review area located in the Administrative Services III Building, 2701 Sullivan Drive, Room 324.
The Dearstyne Complex HVAC renovation project will include new air handlers, building wide HVAC controls upgrade, demolition of penthouse mechanical spaces, and miscellaneous mechanical equipment/component replacements to meet the conditions required by space utilization.David Hammock
Project Manager
Capital Project Management
Phone #: 919-515-2030
Email: dlhammoc@ncsu.edu
6
Engineering Building Oval201520025CD

Drawings
Specifications
Wednesday, November 22, 2017 at 4 PMFile Slot #11
Review documents for the project are available for review in the Plan Review area located in the Administrative Services III Building, 2701 Sullivan Drive, Room 324.
Package 2 - Early Building Structural, Elevator and Smart Building- To construct a new Engineering building on Centennial Campus.Bob Cwikla
Project Manager
Capital Project Management
Phone #: 919-515-6836
Email: rmcwikla@ncsu.edu
7
Case Academic Dining Addition (Phase I)201511114CD

Drawings
Specifications
Thursday, November 30, 2017 at 5 PMFile Slot #2
Review documents for the project are available for review in the Plan Review area located in the Administrative Services III Building, 2701 Sullivan Drive, Room 324.
Phase I of this project will add 300 square feet to the mechanical room on the first floor in summer of 2018. The work includes, but is not limited to, site improvements, concrete foundation and floor slabs, masonry, structural steel, membrane roofing, plus associated plumbing, mechanical, and electrical system improvements.Angkana Bode
Project Manager
Capital Project Management
Phone #: 919-515-8062
Email: apbode@ncsu.edu
8
Plant Sciences Building201620005SD

Drawings
Report
Specifications
Tuesday, December 5, 2017 at 5 PMFile Slot #9
Review documents for the project are available for review in the Plan Review area located in the Administrative Services III Building, 2701 Sullivan Drive, Room 324.
The vision for the new Plant Sciences Building is to create a highly collaborative and interactive environment, where researchers from the College of Agriculture and Life Sciences (CALS) and from across the university can build imaginative and far-reaching multidisciplinary partnerships with scientists from government, industry, and regulatory agencies. The goal of these interdisciplinary, research-team partnerships is to find innovative and creative solutions for the grand challenges of agriculture, agribusiness, and plant research, including those regarding food production, sustainability, disease resistance, and climate change.Mike Kapp
Project Manager
Capital Project Management
Phone #: 919-513-7239
Email: mjkapp@ncsu.edu
9
Waterline Replacement201620051CD

Drawings
Specifications
Wednesday, December 6, 2017 at 5 PMFile Slot #3
Review documents for the project are available for review in the Plan Review area located in the Administrative Services III Building, 2701 Sullivan Drive, Room 324.
This project will replace original cast-iron piping and lateral connections to Syme, Gold, Welch, and Bragaw Residence Halls, as well as Kamphoefner and Brooks Halls with ductile iron-mortar lined piping. The project also includes connecting the water main between University College Commons and Carmichael Gym eliminating two dead end portions. Building lateral connections will be upgraded in these areas. New pipe will be sized according to the water-system master plan requirements.David Hammock
Project Manager
Capital Project Management
Phone #: 919-515-2030
Email: dlhammoc@ncsu.edu
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
Loading...
 
 
 
Project Review
ReadMe_UpdateInfo
ProjectManagerList