Project Review List & Deadlines
 Share
The version of the browser you are using is no longer supported. Please upgrade to a supported browser.Dismiss

View only
 
 
ABCDEFGH
1
2
Project TitleProject NumberDesign Phase/
Items in Package
Review Deadline Date Location of Review DocumentsOnline Review of DocumentsScope of ProjectProject Manager
3
Chiller Replacement - Lee Residence Hall201920036CD

Drawings
Tuesday, July 14, 2020 at 5:00 PMNAOnline documents available for review though Bluebeam Studio: https://studio.bluebeam.com/join.html?ID=993-754-018This project replaces the chiller at Lee Residence Hall. The chiller (1998) has reached the end of its useful life. This project also includes modifications to chiller piping to address reliability.Rob Arthur
Project Manager
Capital Project Management
Phone #: 919-513-7870
Email: jrathu2@ncsu.edu
4
Lab & Building Systems Modifications to VRB
(2nd Review Notice)
201920015CD

Drawings
Specifications
Friday, July 17, 2020 at 5:00 PMNAOnline documents available for review though Bluebeam Studio: https://studio.bluebeam.com/join.html?ID=156-689-148This project will improve the HVAC system and provide minor lab renovations in the Varsity Research Building. The HVAC renovation will include replacing VAV boxes and local controls in Modules 8, 9 and 10. The renovations in the 15,200 GSF area of Modules 8 - 10 will consolidate the College of Sciences into two modules, accommodate programmatic needs of the research programs, and improve the HVAC infrastructure.David Hammock
Project Manager
Capital Project Management
Phone #: 919-515-2030
Email: dlhammoc@ncsu.edu
5
Pool HVAC Upgrades - Carmichael Gym202035062CD

Drawings
Project Manual
Friday, July 17, 2020 at 5:00 PMNAOnline documents available for review though Bluebeam Studio: https://studio.bluebeam.com/join.html?ID=702-313-844This project will upgrade the existing HVAC system at the pool in Carmichael Gym with poolside bench style exhaust along the south side of the pool to exhaust the area.Melanie Butler
Project Manager
Capital Project Management
Phone #: 919-515-8059
Email: mdbodenh@ncsu.edu
6
Greek Village Phase 4 - Telecom Hub CD Submittal201920017CD

Drawings
Monday, July 20, 2020 at 5:00 PMNAOnline documents available for review though Bluebeam Studio: https://studio.bluebeam.com/join.html?ID=973-272-346Phase 4 will add seven additional lots to the Greek Village. The Townhomes and Apartments will provide ~ 279 beds as a self-liquidating project, owned and operated by the University. This submittal is intended for a separate informal project that replaces the existing telecom hub in the Greek Village Duplex with a standalone building that will eventually get encompassed into a toilet room pavilion / bus shelter.Mike Kapp
Project Manager
Capital Project Management
Phone #: 919-513-7239
Email: mjkapp@ncsu.edu
7
Water Line Modifications at Ligon Street Bridge201920034CD

Drawings
Specifications
Wednesday, July 22, 2020 at 5:00 PMNAOnline documents available for review though Bluebeam Studio: https://studio.bluebeam.com/join.html?ID=452-869-198This project will design and construct the relocation of two water lines, resulting from the DOT I-440 Widening Project. The water lines serve the West Research Annex buildings and the Method Road Headhouses and Greenhouses. New meters, taps and backflow preventer will be installed.David Hammock
Project Manager
Capital Project Management
Phone #: 919-515-2030
Email: dlhammoc@ncsu.edu
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
Loading...