1 | FDP Form 10a - Bid Results on Civil Works | |||||||||||||||||||||||||
2 | Note: Bid Results are in three (3) separate forms, particularly, for Civil Works (Form 10a -CW), Goods and Services (Form 10b - GS) and Consulting Services | |||||||||||||||||||||||||
3 | (Form 10c - CS). If there is no bidded project, good or service for the quarter, the forms must still be submitted with the said notation and signed accordingly. | |||||||||||||||||||||||||
4 | ||||||||||||||||||||||||||
5 | CIVIL WORKS BID-OUT | |||||||||||||||||||||||||
6 | ||||||||||||||||||||||||||
7 | REGION: | REGION IV-A - CALABARZON | CALENDAR YEAR: | 2025 | ||||||||||||||||||||||
8 | PROVINCE: | BATANGAS | QUARTER: | 1 | ||||||||||||||||||||||
9 | CITY/MUNICIPALITY: | |||||||||||||||||||||||||
10 | ||||||||||||||||||||||||||
11 | No. | Reference No. | Name of Project | Approved Budget for Contract | Location | Winning Bidder | Name and Address | Bid Amount | Bidding Date | Contract Duration | ||||||||||||||||
12 | 1 | J-001 | Construction of Water Supply System | 1,885,758.69 | Barangay Lucsuhin, Calatagan, Batangas (Elevated Water Tank) | L.E. PANOPIO PUMPS, WELL DRILLING & CONSTRUCTION | L.E. PANOPIO PUMPS, WELL DRILLING & CONSTRUCTION | 1,883,800.00 | January 07, 2025 | 90 | ||||||||||||||||
13 | 2 | J-003 | Construction of Slope Protection | 5,000,000.00 | Brgy. Cawit, Taal, Batangas | RBG CONSTRUCTION SERVICES | RBG CONSTRUCTION SERVICES | 4,998,123.00 | January 07, 2025 | 90 | ||||||||||||||||
14 | 3 | J-004 | Construction of Slope Protection | 5,955,102.75 | Brgy. Bagong Tubig, San Luis, Batangas | 515 LIFE CONSTRUCTION, CORP. | 515 LIFE CONSTRUCTION, CORP. | 5,952,000.00 | January 07, 2025 | 90 | ||||||||||||||||
15 | 4 | J-007 | Construction of Slope Protection | 1,473,480.84 | Bagong Pook Bridge, Brgy. Poblacion, Malvar, Batangas | EDRES CONSTRUCTION SUPPLY | EDRES CONSTRUCTION SUPPLY | 1,471,500.00 | January 07, 2025 | 90 | ||||||||||||||||
16 | 5 | J-008 | Construction of Water Supply System | 1,525,614.45 | Brgy. Luyos, Tanauan City, Batangas (Elevated Water Tank) | L.E. PANOPIO PUMPS, WELL DRILLING & CONSTRUCTION | L.E. PANOPIO PUMPS, WELL DRILLING & CONSTRUCTION | 1,523,800.00 | January 07, 2025 | 90 | ||||||||||||||||
17 | 6 | J-009 | Construction of Cistern and Installation of Pumps and Other Accessories for the Fire Protection System | 4,538,640.09 | San Jose District Hospital, Brgy. Banay-Banay I, San Jose, Batangas | YAR DRAINAGE MAINTENANCE SERVICES | YAR DRAINAGE MAINTENANCE SERVICES | 4,532,880.00 | January 07, 2025 | 150 | ||||||||||||||||
18 | 7 | J-010 | Construction of Barangay/Farm to Market Road | 800,000.00 | Brgy. Dela Paz Proper, Batangas City | P-SQUARE CONTRACTING & SERVICES | P-SQUARE CONTRACTING & SERVICES | 795,435.60 | January 07, 2025 | 60 | ||||||||||||||||
19 | 8 | J-012 | Construction of Barangay/Farm to Market Road | 3,487,802.62 | Brgy. Gulibay, Bauan, Batangas | GREENFIELD CONSTRUCTION | GREENFIELD CONSTRUCTION | 3,484,800.00 | January 07, 2025 | 90 | ||||||||||||||||
20 | 9 | J-013 | Construction of Multi-Purpose Covered Court | 1,100,000.00 | Brgy. Ilat North, San Pascual, Batangas (Phase II) | MJV 28 CONSTRUCTION | MJV 28 CONSTRUCTION | 1,097,800.00 | January 07, 2025 | 45 | ||||||||||||||||
21 | 10 | J-014 | Construction of Barangay/Farm to Market Road | 1,353,500.00 | Brgy. San Mateo, San Pascual, Batangas | JNBER CONSTRUCTION SERVICES | JNBER CONSTRUCTION SERVICES | 1,352,000.00 | January 07, 2025 | 60 | ||||||||||||||||
22 | 11 | J-016 | Construction of Street Lighting System | 1,988,942.10 | Brgy. Sta. Elena, Sto. Tomas City, Batangas | Z. ANTIOQUIA CONSTRUCTION | Z. ANTIOQUIA CONSTRUCTION | 1,988,130.00 | January 07, 2025 | 75 | ||||||||||||||||
23 | 12 | J-017 | Construction of Street Lighting System | 2,474,539.23 | City of Tanauan, Batangas (package of 3) (a. Brgy. Ambulong, b. Brgy. Balele, c. Brgy. Laurel) | Z. ANTIOQUIA CONSTRUCTION | Z. ANTIOQUIA CONSTRUCTION | 25,472,000.00 | January 07, 2025 | 45 | ||||||||||||||||
24 | 13 | J-018 | Construction of Street Lighting System | 971,901.81 | Brgy. Cahigam, Rosario, Batangas | 515 LIFE CONSTRUCTION, CORP. | 515 LIFE CONSTRUCTION, CORP. | 970,000.00 | January 07, 2025 | 45 | ||||||||||||||||
25 | 14 | J-019 | Construction of Multi-Purpose Hall | 4,038,704.40 | Brgy. Malaya, Rosario, Batangas | JSAM CONSTRUCTION | JSAM CONSTRUCTION | 4,034,500.00 | January 07, 2025 | 105 | ||||||||||||||||
26 | 15 | J-020 | Construction of Street Lighting System | 1,999,127.17 | Brgy. San Jose, Rosario, Batangas | EDRES CONSTRUCTION SUPPLY | EDRES CONSTRUCTION SUPPLY | 1,997,000.00 | January 07, 2025 | 75 | ||||||||||||||||
27 | 16 | J-022 | Construction of Parking Area of Provincial Health Office | 530,000.00 | Brgy. Kumintang Ibaba, Batangas City | J.A.B. CONSTRUCTION | J.A.B. CONSTRUCTION | 529,000.00 | January 07, 2025 | 45 | ||||||||||||||||
28 | 17 | J-023 | Construction of Street Lighting System | 998,149.24 | Brgy. Mahacot East, Batangas City | JNBER CONSTRUCTION SERVICES | JNBER CONSTRUCTION SERVICES | 996,000.00 | January 07, 2025 | 45 | ||||||||||||||||
29 | 18 | J-028 | Construction of Barangay/Farm to Market Road | 2,000,000.00 | Brgy. Bagong Tubig, Calaca City, Batangas | CEDRIC B. CONSTRUCTION | CEDRIC B. CONSTRUCTION | 1,998,000.00 | January 07, 2025 | 60 | ||||||||||||||||
30 | 19 | J-029 | Construction of Street Lighting System | 998,149.24 | Brgy. Loma, Calaca City, Batangas | MJV 28 CONSTRUCTION | MJV 28 CONSTRUCTION | 996,800.00 | January 07, 2025 | 45 | ||||||||||||||||
31 | 20 | J-031 | Construction of Barangay/Farm to Market Road | 2,000,000.00 | Brgy. San Agustin, Bauan, Batangas | JNBER CONSTRUCTION SERVICES | JNBER CONSTRUCTION SERVICES | 1,998,500.00 | January 07, 2025 | 60 | ||||||||||||||||
32 | 21 | J-032 | Rehabilitation/Improvement of Provincial Road | 5,248,324.73 | BAT005 – Pinagkurusan, Alitagtag – Gelerang Kawayan, San Pascual – Poblacion, Bauan Road, San Pascual, Batangas | HEREFOLD BUILDERS & CONSTRUCTION SUPPLY | HEREFOLD BUILDERS & CONSTRUCTION SUPPLY | 5,242,078.00 | January 07, 2025 | 90 | ||||||||||||||||
33 | 22 | J-033 | Construction of Flood Control System | 10,000,000.00 | Brgy. Mabilog na Bundok, Lobo, Batangas | J.A.B. CONSTRUCTION | J.A.B. CONSTRUCTION | 9,998,500.00 | January 07, 2025 | 150 | ||||||||||||||||
34 | 23 | J-034 | Construction of Slope Protection | 4,600,000.00 | Brgy. Locloc, San Luis, Batangas | RBG CONSTRUCTION SERVICES | RBG CONSTRUCTION SERVICES | 4,596,800.00 | January 07, 2025 | 90 | ||||||||||||||||
35 | 24 | J-035 | Construction of Multi-Purpose Hall | 635,103.50 | Brgy. Muzon, San Luis, Batangas (Phase II) | EM HERNANDEZ CONSTRUCTION AND SUPPLY CORP. | EM HERNANDEZ CONSTRUCTION AND SUPPLY CORP. | 634,000.00 | January 07, 2025 | 45 | ||||||||||||||||
36 | 25 | J-036 | Construction of Water Supply System | 1,461,559.54 | Barangay San Sebastian, Balete, Batangas (Elevated Water Tank only) | L.E. PANOPIO PUMPS, WELL DRILLING & CONSTRUCTION | L.E. PANOPIO PUMPS, WELL DRILLING & CONSTRUCTION | 1,459,800.00 | January 07, 2025 | 90 | ||||||||||||||||
37 | 26 | J-038 | Rehabilitation/Improvement /Upgrading of Provincial Road | 8,251,482.10 | BAT072 – Poblacion, Padre Garcia – Marilag, Rosario Road, Rosario, Batangas (Phase II) | IKM BUILDERS AND CONSTRUCTION SUPPLY CORPORATION | IKM BUILDERS AND CONSTRUCTION SUPPLY CORPORATION | 8,243,000.00 | January 07, 2025 | 120 | ||||||||||||||||
38 | 27 | J-039 | Construction of Barangay/Farm | 2,000,000.00 | Market Road at Brgy. Calubcub II, San Juan, Batangas | EDRES CONSTRUCTION SUPPLY | EDRES CONSTRUCTION SUPPLY | 1,997,500.00 | January 07, 2025 | 60 | ||||||||||||||||
39 | 28 | J-040 | Rehabilitation/Improvement of Multi-Purpose Covered Court | 2,000,000.00 | Brgy. Haligue Silangan, Batangas City | J.A.B. CONSTRUCTION | J.A.B. CONSTRUCTION | 1,997,000.00 | January 07, 2025 | 45 | ||||||||||||||||
40 | 29 | J-042 | Rehabilitation/Improvement of Provincial Road | 10,000,000.00 | BAT026 – Gulod – Paraiso Road (Biga Section), Calatagan, Batangas | GREENFIELD CONSTRUCTION | GREENFIELD CONSTRUCTION | 9,990,800.00 | January 07, 2025 | 90 | ||||||||||||||||
41 | 30 | J-043 | Rehabilitation/Improvement of Provincial Road | 15,000,000.00 | BAT067 – Putat – Papaya Road (Cavite Boundary), Nasugbu, Batangas | GREENFIELD CONSTRUCTION | GREENFIELD CONSTRUCTION | 14,993,800.00 | January 07, 2025 | 120 | ||||||||||||||||
42 | 31 | J-044 | Construction of Canal/Drainage System | 10,000,000.00 | Provincial Medical Center Compound, Brgy. Putol, Tuy, Batangas | V.R. PATRON BUILDERS & DEVELOPERS CORP. | V.R. PATRON BUILDERS & DEVELOPERS CORP. | 9,995,000.00 | January 07, 2025 | 90 | ||||||||||||||||
43 | 32 | J-045 | Construction of Parking and Landscaping | 23,500,000.00 | Batangas Provincial Medical Compound at Brgy. Putol, Tuy, Batangas | V.R. PATRON BUILDERS & DEVELOPERS CORP. | V.R. PATRON BUILDERS & DEVELOPERS CORP. | 23,490,000.00 | January 07, 2025 | 90 | ||||||||||||||||
44 | 33 | J-046 | Construction of Sewerage Treatment Plant at the Batangas Provincial Medical Compound | 10,937,213.07 | Brgy. Putol, Tuy, Batangas | YAR DRAINAGE MAINTENANCE SERVICES | YAR DRAINAGE MAINTENANCE SERVICES | 10,930,880.00 | January 07, 2025 | 180 | ||||||||||||||||
45 | 34 | J-047 | Rehabilitation/Improvement of Provincial Road | 10,000,000.00 | BAT082 – Mayuro – Bayawang Road, Rosario, Batangas | GREENFIELD CONSTRUCTION | GREENFIELD CONSTRUCTION | 9,990,800.00 | January 07, 2025 | 120 | ||||||||||||||||
46 | 35 | J-048 | Construction of Two (2) Storey Six (6) Classrooms Regina R. Mandanas Memorial Building | 20,087,920.62 | Lumampao Elementary School, Brgy. Don Juan, Cuenca, Batangas | LLEB CONSTRUCTION AND TRADING | LLEB CONSTRUCTION AND TRADING | 20,077,800.00 | January 07, 2025 | 225 | ||||||||||||||||
47 | 36 | J-049 | Rehabilitation/Improvement of Provincial Road | 7,000,000.00 | BAT098 Poblacion, San Luis – Muzon, Alitagtag Road, San Luis, Batangas | GREENFIELD CONSTRUCTION | GREENFIELD CONSTRUCTION | 6,993,800.00 | January 07, 2025 | 150 | ||||||||||||||||
48 | 37 | J-050 | Construction of Flood Control System | 7,652,429.23 | San Juan District Hospital, Barangay Talahiban II, San Juan, Batangas | J.A.B. CONSTRUCTION | J.A.B. CONSTRUCTION | 7,645,000.00 | January 07, 2025 | 120 | ||||||||||||||||
49 | 38 | J-051 | Construction of Box Culvert | 5,000,000.00 | Brgy. San Isidro, Taysan, Batangas | P-SQUARE CONTRACTING & SERVICES | P-SQUARE CONTRACTING & SERVICES | 4,997,000.00 | January 07, 2025 | 90 | ||||||||||||||||
50 | 39 | J-052 | Installation of Wet Standpipe System and Fire Detection and Alarm System | 10,000,000.00 | Provincial Capitol Building | KAPITAN 21 BUILDERS OPC | KAPITAN 21 BUILDERS OPC | 9,992,800.00 | January 07, 2025 | 150 | ||||||||||||||||
51 | 40 | J-053 | Construction of Multi-Purpose Building | 50,000,000.00 | Brgy. Sta. Rita Aplaya, Batangas City (Phase I) | GREENFIELD CONSTRUCTION | GREENFIELD CONSTRUCTION | 49,975,800.00 | January 07, 2025 | 300 | ||||||||||||||||
52 | 41 | K-001 | Construction of Slope Protection | 6,000,000.00 | Real Bridge, Barangay Real, Calatagan, Batangas | MGSBUILDERS AND GENERAL CONTRACTOR OPC | MGSBUILDERS AND GENERAL CONTRACTOR OPC | 5,994,126.09 | January 10, 2025 | 90 | ||||||||||||||||
53 | 42 | K-002 | Construction of Canal/Drainage System | 2,000,000.00 | Brgy. Balayong, Bauan, Batangas | CEDRIC B. CONSTRUCTION | CEDRIC B. CONSTRUCTION | 1,996,757.74 | January 10, 2025 | 90 | ||||||||||||||||
54 | 43 | K-003 | Construction of Flood Control System | 3,039,169.58 | Brgy. San Lucas, Lipa City, Batangas | FEJAD CONSTRUCTION CORP. | FEJAD CONSTRUCTION CORP. | 3,037,148.92 | January 10, 2025 | 60 | ||||||||||||||||
55 | 44 | K-004 | Construction of Footbridge | 2,000,000.00 | Brgy. Bagong Pook, Lemery, Batangas | Z. ANTIOQUIA CONSTRUCTION | Z. ANTIOQUIA CONSTRUCTION | 1,997,000.00 | January 10, 2025 | 90 | ||||||||||||||||
56 | 45 | K-006 | Construction of Flood Control System | 13,250,000.00 | BAT022 Brgy. 6 – Madalunot Road, Calaca, Batangas | X.Y.Z. CONSTRUCTION & SUPPLIES | X.Y.Z. CONSTRUCTION & SUPPLIES | 13,241,800.00 | January 10, 2025 | 90 | ||||||||||||||||
57 | 46 | K-007 | Construction of Flood Control System | 2,500,000.00 | Brgy. San Diego, Lian, Batangas | EM HERNANDEZ CONSTRUCTION AND SUPPLY CORP. | EM HERNANDEZ CONSTRUCTION AND SUPPLY CORP. | 2,497,000.00 | January 10, 2025 | 75 | ||||||||||||||||
58 | 47 | K-008 | Rehabilitation/Improvement of Provincial Road | 3,000,000.00 | BAT045 Luntal – Tuy, Brgy. 4, Lian, Batangas | KERAND BUILDERS AND SUPPLY | KERAND BUILDERS AND SUPPLY | 2,997,359.38 | January 10, 2025 | 75 | ||||||||||||||||
59 | 48 | K-009 | Rehabilitation/Improvement of BMONC and OR/DR Complex | 5,000,000.00 | Apacible Memorial District Hospital, Brgy. Lumbangan, Nasugbu, Batangas | EGP CONSTRUCTION AND ENTERPRISES | EGP CONSTRUCTION AND ENTERPRISES | 4,994,800.00 | January 10, 2025 | 90 | ||||||||||||||||
60 | 49 | K-010 | Construction of Barangay/Farm to Market Road | 1,500,000.00 | Brgy. Abiacao, San Luis, Batangas | KERAND BUILDERS AND SUPPLY | KERAND BUILDERS AND SUPPLY | 1,498,873.02 | January 10, 2025 | 60 | ||||||||||||||||
61 | 50 | K-011 | Rehabilitation/Improvement of Provincial Road | 8,000,000.00 | BAT035 Poblacion 2, San Gregorio Road, Laurel, Batangas | V.R. PATRON BUILDERS & DEVELOPERS CORP. | V.R. PATRON BUILDERS & DEVELOPERS CORP. | 6,329,304.34 | January 10, 2025 | 120 | ||||||||||||||||
62 | 51 | K-013 | Rehabilitation/Improvement of Provincial Road | 6,334,304.34 | BAT091 – Poblacion 3, San Jose – Poblacion, Ibaan Road, San Jose and Ibaan, Batangas (Phase II) | V.R. PATRON BUILDERS & DEVELOPERS CORP. | V.R. PATRON BUILDERS & DEVELOPERS CORP. | 6,329,304.34 | January 10, 2025 | 90 | ||||||||||||||||
63 | 52 | K-014 | Improvement of Provincial Evacuation Center (Taysan Evacuation Center) | 2,128,063.68 | Brgy. Poblacion East, Taysan, Batangas (Phase II) | JSAM CONSTRUCTION | JSAM CONSTRUCTION | 2,126,000.00 | January 10, 2025 | 90 | ||||||||||||||||
64 | 53 | K-015 | Construction of Drainage System | 500,000.00 | Brgy. Balagtas, Batangas City | GREENFIELD CONSTRUCTION | GREENFIELD CONSTRUCTION | 498,880.00 | January 10, 2025 | 60 | ||||||||||||||||
65 | 54 | K-016 | Improvement of Provincial Sports Complex Facilities | 1,475,000.00 | Brgy. Sta. Rita, Batangas City (Swimming Pool) (Phase II) | TRIPLE "M" CONSTRUCTION | TRIPLE "M" CONSTRUCTION | 1,472,000.00 | January 10, 2025 | 60 | ||||||||||||||||
66 | 55 | K-019 | Construction of Rabies Testing Laboratory | 1,605,000.00 | Provincial Veterinary Compound, Diversion Road, Bolbok, Batangas City | JSAM CONSTRUCTION | JSAM CONSTRUCTION | 1,603,000.00 | January 10, 2025 | 90 | ||||||||||||||||
67 | 56 | K-020 | Repair and Maintenance of Provincial Road | 4,000,000.00 | BAT023 Madalunot – Puting Kahoy Rd., Calaca, Batangas | KNE BUILDERS | KNE BUILDERS | 3,997,008.34 | January 10, 2025 | 75 | ||||||||||||||||
68 | 57 | K-021 | Repair and Maintenance of BAT067 Putat – Papaya Rd., | 4,000,000.00 | Nasugbu, Batangas | X.Y.Z. CONSTRUCTION & SUPPLIES | X.Y.Z. CONSTRUCTION & SUPPLIES | 3,996,380.00 | January 10, 2025 | 75 | ||||||||||||||||
69 | 58 | K-022 | Repair and Maintenance at BAT126 Luna – Tuong Rd. | 4,000,000.00 | Tuy, Batangas | X.Y.Z. CONSTRUCTION & SUPPLIES | X.Y.Z. CONSTRUCTION & SUPPLIES | 3,996,380.00 | January 10, 2025 | 75 | ||||||||||||||||
70 | 59 | K-023 | Improvement of PSWDO Multi-Purpose Building at Provincial Sports Complex Compound | 3,100,000.00 | Brgy. Sta. Rita, Batangas City | R.M. TEJADA CONSTRUCTION AND SUPPLIES CORP. | R.M. TEJADA CONSTRUCTION AND SUPPLIES CORP. | 3,096,888.00 | January 10, 2025 | 45 | ||||||||||||||||
71 | 60 | K-024 | Construction of Drainage System | 4,200,000.00 | OPA Compound, Bolbok, Batangas City | MJV 28 CONSTRUCTION | MJV 28 CONSTRUCTION | 4,197,800.00 | January 10, 2025 | 90 | ||||||||||||||||
72 | 61 | K-025 | Construction of Warehouse | 10,000,000.00 | OPA Compound, Bolbok, Batangas City | IKM BUILDERS AND CONSTRUCTION SUPPLY CORPORATION | IKM BUILDERS AND CONSTRUCTION SUPPLY CORPORATION | 9,993,000.00 | January 10, 2025 | 150 | ||||||||||||||||
73 | 62 | K-026 | Construction of Pathway and Landscaping | 3,820,000.00 | PVO Bolbok, Batangas City | RBG CONSTRUCTION SERVICES | RBG CONSTRUCTION SERVICES | 3,816,800.00 | January 10, 2025 | 90 | ||||||||||||||||
74 | 63 | K-027 | Construction of Multi-Purpose Building Provincial Capitol Compound | 10,000,000.00 | Brgy. Kumintang Ibaba, Batangas City | GREENFIELD CONSTRUCTION | GREENFIELD CONSTRUCTION | 9,992,880.00 | January 10, 2025 | 150 | ||||||||||||||||
75 | 64 | K-028 | Construction of New PG-ENRO Laboratory Building (Phase II) | 7,800,000.00 | Provincial Capitol Compound, Brgy. Kumintang Ibaba, Batangas City | GREENFIELD CONSTRUCTION | GREENFIELD CONSTRUCTION | 7,793,880.00 | January 10, 2025 | 180 | ||||||||||||||||
76 | 65 | K-029 | Construction of HIM Type Open Classroom Building | 8,600,000.00 | Mataas na Lupa – Palsahingin Elementary School, Brgy. Mataas na Lupa, San Pascual, Batangas | TRIPLE "M" CONSTRUCTION | TRIPLE "M" CONSTRUCTION | 8,594,500.00 | January 10, 2025 | 150 | ||||||||||||||||
77 | 66 | K-030 | Construction of Water Supply System | 3,948,908.05 | Brgy. Dagatan, Taysan, Batangas | GREENFIELD CONSTRUCTION | GREENFIELD CONSTRUCTION | 3,944,000.00 | January 10, 2025 | 120 | ||||||||||||||||
78 | 67 | J-002 | Rehabilitation/Improvement of Dr. Danilo L. Aguilera Building | 5,000,000.00 | Batangas Provincial Hospital, Brgy. Palanas, Lemery, Batangas (Phase II) | TRIPLE "M" CONSTRUCTION | TRIPLE "M" CONSTRUCTION | 4,997,000.00 | January 07, 2025 | 120 | ||||||||||||||||
79 | 68 | J-006 | Construction of Stage and Bench | 2,500,000.00 | Brgy. Bugaan West, Laurel, Batangas | TRIPLE "M" CONSTRUCTION | TRIPLE "M" CONSTRUCTION | 2,498,500.00 | January 07, 2025 | 90 | ||||||||||||||||
80 | 69 | A-001 | Construction of Flood Control System | 3,000,000.00 | Brgy. Looc, Balete, Batangas | KEASCIA CONSTRUCTION & SUPPLY | KEASCIA CONSTRUCTION & SUPPLY | 2,997,000.00 | February 19, 2025 | 90 | ||||||||||||||||
81 | 70 | A-002 | Construction of Street Lighting System | 998,149.24 | Brgy. San Diego, Lian (Phase II), Batangas | AA LIVINGSTONE BUILDERS INC. | AA LIVINGSTONE BUILDERS INC. | 997,000.00 | February 19, 2025 | 45 | ||||||||||||||||
82 | 71 | A-003 | Rehabilitation/Improvement of Dancing Fountain | 4,522,663.60 | Provincial Capitol Compound, Brgy. Kumintang Ibaba, Batangas City | INDUSTRON INCORPORATED | INDUSTRON INCORPORATED | 4,500,000.00 | February 19, 2025 | 90 | ||||||||||||||||
83 | 72 | A-004 | Construction of Street Lighting System | 1,000,000.00 | Brgy. Balintawak, Lipa City, Batangas | IKM BUILDERS AND CONSTRUCTION SUPPLY CORPORATION | IKM BUILDERS AND CONSTRUCTION SUPPLY CORPORATION | 999,000.00 | February 19, 2025 | 45 | ||||||||||||||||
84 | 73 | A-005 | Construction of Street Lighting System | 1,478,186.32 | Brgy. Sabang, Lipa City, Batangas | IKM BUILDERS AND CONSTRUCTION SUPPLY CORPORATION | IKM BUILDERS AND CONSTRUCTION SUPPLY CORPORATION | 1,476,500.00 | February 19, 2025 | 60 | ||||||||||||||||
85 | 74 | A-006 | Construction of Street Lighting System | 952,779.98 | City of Lipa, Batangas (package of 2) (a. Brgy. San Sebastian, b. Brgy. Malitlit) | IKM BUILDERS AND CONSTRUCTION SUPPLY CORPORATION | IKM BUILDERS AND CONSTRUCTION SUPPLY CORPORATION | 951,700.00 | February 19, 2025 | 30 | ||||||||||||||||
86 | 75 | A-007 | Construction of Street Lighting System | 476,389.99 | Brgy. Quezon, Lipa City, Batangas (Phase II) | IKM BUILDERS AND CONSTRUCTION SUPPLY CORPORATION | IKM BUILDERS AND CONSTRUCTION SUPPLY CORPORATION | 475,850.00 | February 19, 2025 | 30 | ||||||||||||||||
87 | 76 | A-008 | Construction of Street Lighting System | 961,239.53 | Brgy. Anilao Labac, Lipa City, Batangas | IKM BUILDERS AND CONSTRUCTION SUPPLY CORPORATION | IKM BUILDERS AND CONSTRUCTION SUPPLY CORPORATION | 960,000.00 | February 19, 2025 | 45 | ||||||||||||||||
88 | 77 | A-011 | Construction of Multi-Purpose Building | 4,723,000.00 | Brgy. Calo, Lobo, Batangas | PRB BUILDERS | PRB BUILDERS | 4,715,068.32 | February 19, 2025 | 150 | ||||||||||||||||
89 | 78 | A-012 | Rehabilitation/Improvement of Provincial Road | 10,000,000.00 | BAT100 Poblacion – Balite Road, San Luis, Batangas | HEREFOLD BUILDERS & CONSTRUCTION SUPPLY | HEREFOLD BUILDERS & CONSTRUCTION SUPPLY | 9,992,043.00 | February 19, 2025 | 150 | ||||||||||||||||
90 | 79 | A-013 | Construction of Canal/Drainage System | 1,000,000.00 | Brgy. San Mariano, San Pascual, Batangas | KAPITAN 21 BUILDERS OPC | KAPITAN 21 BUILDERS OPC | 997,800.00 | February 19, 2025 | 90 | ||||||||||||||||
91 | 80 | A-014 | Rehabilitation/Improvement of Provincial Road | 15,000,000.00 | BAT105 Bihis, Taal – Poblacion, San Nicolas Road, San Nicolas, Batangas | Z. ANTIOQUIA CONSTRUCTION | Z. ANTIOQUIA CONSTRUCTION | 14,993,000.00 | February 19, 2025 | 120 | ||||||||||||||||
92 | 81 | A-015 | Construction of Street Lighting System | 476,389.99 | Brgy. Masaya, Rosario, Batangas | IKM BUILDERS AND CONSTRUCTION SUPPLY CORPORATION | IKM BUILDERS AND CONSTRUCTION SUPPLY CORPORATION | 475,850.00 | February 19, 2025 | 30 | ||||||||||||||||
93 | 82 | A-016 | Construction of Fence of Recreation and Action Center | 5,000,000.00 | Brgy. Sto. Domingo, Batangas City | GREENFIELD CONSTRUCTION | GREENFIELD CONSTRUCTION | 4,996,800.00 | February 19, 2025 | 120 | ||||||||||||||||
94 | 83 | A-017 | Construction of Street Lighting System | 952,779.98 | City of Lipa, Batangas (package of 2) (a. Brgy. Bulacnin, b. Brgy. Inosluban) | IKM BUILDERS AND CONSTRUCTION SUPPLY CORPORATION | IKM BUILDERS AND CONSTRUCTION SUPPLY CORPORATION | 951,700.00 | February 19, 2025 | 30 | ||||||||||||||||
95 | 84 | A-018 | Construction of Street Lighting System | 1,227,798.72 | City of Lipa, Batangas (package of 2) (a. Brgy. Bulaklakan, b. Brgy. Pinagtongulan) | IKM BUILDERS AND CONSTRUCTION SUPPLY CORPORATION | IKM BUILDERS AND CONSTRUCTION SUPPLY CORPORATION | 1,226,500.00 | February 19, 2025 | 30 | ||||||||||||||||
96 | 85 | A-019 | Installation of Water Lines | 1,108,847.80 | Brgy. Halang, Lipa City, Batangas | GREENFIELD CONSTRUCTION | GREENFIELD CONSTRUCTION | 1,105,800.00 | February 19, 2025 | 60 | ||||||||||||||||
97 | 86 | A-020 | Construction of Guardhouse | 500,000.00 | Provincial Health Office, Brgy. Kumintang Ibaba, Batangas City | RBG CONSTRUCTION SERVICES | RBG CONSTRUCTION SERVICES | 498,800.00 | February 19, 2025 | 60 | ||||||||||||||||
98 | 87 | A-021 | Construction of Flood Control System | 3,000,000.00 | EM HERNANDEZ CONSTRUCTION AND SUPPLY CORP. | EM HERNANDEZ CONSTRUCTION AND SUPPLY CORP. | 2,997,000.00 | February 19, 2025 | 75 | |||||||||||||||||
99 | 88 | A-022 | Construction of Slope Protection at Brgy. Cahil, Calaca, Batangas | 5,000,000.00 | Brgy. Carenahan, Balayan, Batangas | RRE ERECTOR'S CONSTRUCTION AND TRADING SPECIALIST | RRE ERECTOR'S CONSTRUCTION AND TRADING SPECIALIST | 4,996,000.00 | February 19, 2025 | 90 | ||||||||||||||||
100 | 89 | A-023 | Rehabilitation of Damaged Fence at the Health Integrated Management Center Compound | 3,000,000.00 | Brgy. Putol, Tuy, Batangas | X.Y.Z. CONSTRUCTION & SUPPLIES | X.Y.Z. CONSTRUCTION & SUPPLIES | 2,996,888.00 | February 19, 2025 | 75 | ||||||||||||||||