1 | Project | Date Reported | Area | Status | Notes | |||||||||||||||||||||||
2 | Bottle Filler on 1st floor | 8/15/2022 | Main Hallway | Completed | ||||||||||||||||||||||||
3 | 3rd Grade Desk not closing | 8/15/2022 | 3rd Grade | Completed | ||||||||||||||||||||||||
4 | Light in kitchen burnt out | 9/13/2022 | Kitchen | Completed | Notified Art via text | |||||||||||||||||||||||
5 | Toilet paper dispenser in girls bathroom (handicap stall) does not work properly | 9/13/2022 | Fellowship Hall | Completed | Notified Art via text | |||||||||||||||||||||||
6 | Paper Towel Dispenser in Kitchen needs a screwdriver or pen to open, Recommend replacement with model that matches current models | 9/13/2022 | Kitchen | Completed | Notified Art via text. Art asked us to look for a key. One key was located. No other keys were found. Not able to make copies. I requested that Art replace that dispenser. We have no other dispensers. | |||||||||||||||||||||||
7 | Fire Marshall Identified - Cannot block electrical panel in Art Room | 9/9/2022 | Fellowship Hall | Completed | Peter is working on a solution | |||||||||||||||||||||||
8 | Ceiling Fans in 3rd Grade Classroom. The one closest to my desk doesn't work, and the other one doesn't seem to be able to adjust to a faster speed anymore (they both used to work from the remote under my Smartboard.) | 8/15/2022 | 3rd Grade | Completed | Needed new batteries. Replaced by Stephen on 9/7 | |||||||||||||||||||||||
9 | Sink in Kitchen not working | 8/15/2022 | Fellowship Hall | Completed | Replaced batteries 9/12 - Stephen | |||||||||||||||||||||||
10 | Mount Smartboard in Butterfly Room | 8/15/2022 | 3K/4K | Completed | 9/6, Jared, Rod, Art, Stephen | |||||||||||||||||||||||
11 | Need insulation strip between wall and radiator below windows on North end of room- when the wind is from the east you can feel a strong breeze | 8/15/2022 | Kindergarten | Completed | ||||||||||||||||||||||||
12 | Installing the Shelves - August 5 | 8/15/2022 | 1st Grade | Completed | August 5 | |||||||||||||||||||||||
13 | Securing the trim to the right of the shelves - August 5 | 8/15/2022 | 1st Grade | Completed | August 5 | |||||||||||||||||||||||
14 | Water stained ceiling tiles near SMART board | 8/15/2022 | 1st Grade | Completed | August 5 | |||||||||||||||||||||||
15 | several coat hooks outside classroom need to be tightened | 8/15/2022 | 2nd Grade | Completed | ||||||||||||||||||||||||
16 | middle bookshelf the shelf falls down | 8/15/2022 | 3rd Grade | Completed | Art & Stephen | |||||||||||||||||||||||
17 | Wobbly Desks | 8/15/2022 | 3rd Grade | Completed | Art, Rod & Stephen | |||||||||||||||||||||||
18 | Outlet on north end of door installed | 8/15/2022 | 4th Grade | Completed | ||||||||||||||||||||||||
19 | door knob loose | 8/15/2022 | 5th Grade | Completed | ||||||||||||||||||||||||
20 | one tile on wall behind door - re-glued | 8/15/2022 | 5th/6th | Completed | ||||||||||||||||||||||||
21 | Girls bathroom sink on the right - New Batteries needed | 8/15/2022 | 2nd Floor | Completed | Marty was here on Friday, 9/2 | |||||||||||||||||||||||
22 | Upstairs boys' bathroom - middle sink not working | 8/15/2022 | 2nd Floor | Completed | Marty was here on Friday, 9/2 | |||||||||||||||||||||||
23 | area behind Smartboard needs to be finished (possibly lift off screen and put white board behind it?) Where are the metal trim pieces? Can they be put back on? - Greg Bakeberg | 8/15/2022 | 2nd Grade | Completed | ||||||||||||||||||||||||
24 | Hang clock above board | 8/15/2022 | 7th/8th | Completed | ||||||||||||||||||||||||
25 | Shelves to be built - 8/5 | 8/15/2022 | 7th/8th | Completed | ||||||||||||||||||||||||
26 | Exit lights if burnt out - Ron Beyer - 7/29 | 8/15/2022 | Completed | |||||||||||||||||||||||||
27 | The snow fence on the playground needs replacing- Denise fixed it in 3 different places - No Longer needed | 8/15/2022 | Completed | |||||||||||||||||||||||||
28 | Boys bathroom by activity center - foot stop needs to be replaced | 8/15/2022 | Completed | |||||||||||||||||||||||||
29 | Door of bathroom in Mother's room cannot be locked | 8/15/2022 | Completed | |||||||||||||||||||||||||
30 | 4th Grade - Tackstrip outside the classroom to post Art Projects - 18ft.- Centered between two doors - Falling Down | 8/15/2022 | 4th Grade | Completed | ||||||||||||||||||||||||
31 | 4th Grade Back light needs to be replaced - burnt out | 8/15/2022 | 4th grade | Completed | ||||||||||||||||||||||||
32 | Community Center Boys Baby changing stations | 8/15/2022 | Completed | |||||||||||||||||||||||||
33 | Girls bathroom by fellowship hall -- please add a foot stop like the boys have | 8/15/2022 | Completed | |||||||||||||||||||||||||
34 | Fix toilet in Girls Bathroom by fellowship hall | 8/15/2022 | Completed | |||||||||||||||||||||||||
35 | Change and clean the light fixture- lots of flies) the entryway going from the gym hallway into the school(by the trophy case) and then the main one the students use in the mornings. | 8/15/2022 | Completed | |||||||||||||||||||||||||
36 | Boys bathroom door stop needs to be lowered just a bit so it catches properly | 8/15/2022 | Completed | |||||||||||||||||||||||||
37 | Upstairs Girls bathroom needs a door stop. In Swinging door. | 8/15/2022 | Completed | |||||||||||||||||||||||||
38 | Add a door stop to the “Paper Room” door in the fellowship hall. Has a hook on the backside that drags on the floor. Northwest door. | 8/15/2022 | Completed | |||||||||||||||||||||||||
39 | 3K/4K Soap Dispenser needs to be replaced | 8/15/2022 | Butterfly Room | Completed | ||||||||||||||||||||||||
40 | Clean carpet in balcony hallway and church stairwell | 8/15/2022 | Sanctuary | Completed | Done over summer / will need to be done again once ceiling fixed | |||||||||||||||||||||||
41 | several windows need "catches" fixed so they can be used and not flop open | 8/15/2022 | 2nd Grade | Completed | ||||||||||||||||||||||||
42 | Clean Globes in Fellowship hall | 8/15/2022 | Completed | |||||||||||||||||||||||||
43 | 3K/4K Sink not working | 8/24/2022 | Butterfly Room | Completed | Replaced battery - Stephen | |||||||||||||||||||||||
44 | Fire Marshall Identified - 2 Fire Exit Signs are burned out and need to be replaced | 9/9/2022 | Extended Learning | Completed | Art has Andrew Holley coming in to replace. AH replaced on 9/15/2022 | |||||||||||||||||||||||
45 | Paper towel and soap dispensers in the concession stand do not work. We didn't see lights or hear noise , so it may be batteries? | 9/14/2022 | Concession Stand | Completed | Art was notified and asked us to check the batteries. Paper towel was replaced and soap dispenser was checked and works. | |||||||||||||||||||||||
46 | One of the carts still has the wheels on incorrectly | 9/15/2022 | Fellowship Hall | Completed | Stephen changed the wheels around | |||||||||||||||||||||||
47 | Paper Towel Dispenser is jammed | 9/15/2022 | 2nd Floor Bathroom | Completed | After 30 minutes and replacing batteries, I was able to unjam it. I had to take a needle nose pliers and screwdriver to clear out the jammed paper. | |||||||||||||||||||||||
48 | Wasp Nests located on church and adjacent church | 9/19/2022 | Exterior | Completed | Reported to Art on 9/19 | |||||||||||||||||||||||
49 | Girl's toilet in the activity center area does not flush. Hardware will need to be replaced. | 9/23/2022 | Activity Center | Completed | Emailed Art 9/23. Fixed 9/24 | |||||||||||||||||||||||
50 | Outlet Cover in the Gym is Broken | 9/29/2022 | Activity Center | Completed | Emailed Art 9/29. Will look at 10/1. Replaced 10/1 | |||||||||||||||||||||||
51 | Blinds in 4th grade classroom difficult to close | 10/18/2022 | 4th Classroom | Completed | Texted Art 10/18 | |||||||||||||||||||||||
52 | Strip of moulding has fallen off the wall | 10/20/2022 | 1st Grade Classroom | Completed | emailed Art 10/20 | |||||||||||||||||||||||
53 | Small tack strip outside 4th grade classroom is falling down | 10/20/2022 | 4th classroom | Completed | texted Art 10/20 | |||||||||||||||||||||||
54 | The ceiling tile above 1st Grade classroom SMART board was replaced during the summer because of a water stain. A new water stain is forming so there must still be a leak above it. | 11/14/2022 | 1st grade Classroom | Completed | Emailed Art 11/14 | |||||||||||||||||||||||
55 | Carpet Squares coming up in the Butterfly room | 12/13/2022 | Butterfly Room | Completed | Texted Art 12/14 | |||||||||||||||||||||||
56 | Concesisons Faucet needs to be replaced | 12/7/2022 | Concessions Area | Completed | Brian Carlson is working on replacing the unit | |||||||||||||||||||||||
57 | Concessions Safe needs to be installed | 12/12/2022 | Concessions Area | Completed | Brian C and Brian Z are working on this | |||||||||||||||||||||||
58 | Toilet in Girls bathroom (Middle Stall) does not flush | 12/19/2022 | Fellowship Hall | Completed | Texted Art 12/19 | |||||||||||||||||||||||
59 | Sink in Girls bathroom works intermittently | 12/19/2022 | Fellowship Hall | Completed | Texted Art 12/19 | |||||||||||||||||||||||
60 | Concessions valves "touchy" | 12/28/2022 | Activity Center | Completed | Emailed Art 12/28. Steve Fabry looked at them and believes they will be okay. | |||||||||||||||||||||||
61 | I thought it might be the battery in my remote again, so I put in a fresh one, but it's not working. The classroom fans will not turn on. Would you please let Art know they need to get fixed? | 1/12/2023 | 3rd Grade Classroom | Completed | Emailed Art 1/12. Battery is touchy. | |||||||||||||||||||||||
62 | Middle Urinal in boys bathroom, fellship hall does not flush. | 1/21/2023 | Fellowship Hall | Completed | Art told me on 1/21 | |||||||||||||||||||||||
63 | Boys toilet in first stall on 2nd floor flushes really slowly | 1/23/2023 | 2nd Floor | Completed | Texted Art 1/23 | |||||||||||||||||||||||
64 | Girls Locker Room Coat Rack fell out of the wall | 1/30/2023 | Girls Locker Room | Completed | Texted Art 1/30 | |||||||||||||||||||||||
65 | Classroom Sink not draining | 2/8/2023 | Kindergarten Room | Completed | Emailed Art 2/8 | |||||||||||||||||||||||
66 | Girls sink in the fellowship hall running constantly | 2/8/2023 | Fellowship Hall | Completed | Texted Art 2/8 | |||||||||||||||||||||||
67 | 5th & 6th Grade Hinges are very squeaky | 9/20/2022 | 5 & 6 Classroom | Completed | Emailed Art 9/20 | |||||||||||||||||||||||
68 | Boys Dispenser on 2nd Floor not working | 10/11/2022 | 2nd Floor | Completed | ||||||||||||||||||||||||
69 | Many Fire Exit Signs are outdated and should be replaced | 9/9/2022 | In Progress | Cost $45 each | ||||||||||||||||||||||||
70 | Plaster is falling off in 3K room by windows - Partially resolved | 3K/4K Room | In Progress | |||||||||||||||||||||||||
71 | TP Roll Holder Replacement | In Progress | Waiting for Samples | |||||||||||||||||||||||||
72 | Paper Towel Dispensers | In Progress | Waiting for Samples | |||||||||||||||||||||||||
73 | 4th Grade Tack Strip falling down. Will need to be screwed in. | 9/12/2022 | In Progress | Messaged Art 9/12, Will be in later this week | ||||||||||||||||||||||||
74 | Fellowship Hall Garbage Cans need to be hosed out. Attracting a lot of fruit flies | 9/12/2022 | In Progress | Messaged Art 9/12 | ||||||||||||||||||||||||
75 | Drinking Fountain on first floor is coming loose | 9/20/2022 | 1st Floor | Completed | Art Reported this to me on 9/20. Update on 9/29, looking to replace with bottle filler, Steve Fabry to install. | |||||||||||||||||||||||
76 | Paper Towel Dispenser motor in 3K/4K Room seems to be going out | 9/29/2022 | Butterfly Room | Completed | Emailed Art 9/29. Will look at 10/1 | |||||||||||||||||||||||
77 | Outet cover on outside of building by activity center, Webster exit, missing | 10/17/2022 | Outside | In Progress | Texted Art 10/17 | |||||||||||||||||||||||
78 | Fix ceiling in balcony hallway | 8/15/2022 | Sanctuary | Not Started | Need bell tower fixed before repair can take place | |||||||||||||||||||||||
79 | Fill in holes above hymn boards | 8/15/2022 | Sanctuary | Not Started | ||||||||||||||||||||||||
80 | Fill Holes, touch up paint in Extended Learning Room | 8/15/2022 | Extended Learning | Not Started | ||||||||||||||||||||||||
81 | Finish painting room- teachers will do but need BIG furniture moved - June 2023 | 8/15/2022 | Extended Learning | Not Started | Pushed to June 2023 | |||||||||||||||||||||||
82 | Touch up paint at the bottom of the steps by the elevator | 8/15/2022 | Not Started | |||||||||||||||||||||||||
83 | Put Security film on windows | 8/15/2022 | Entire Building | Not Started | ||||||||||||||||||||||||
84 | Bottle Filler in basement | 8/15/2022 | Fellowship Hall | Not Started | Will need to run water from different area | |||||||||||||||||||||||
85 | Elevator Entrance on 1st floor drywall chipped & broken | 9/13/2022 | Hallway | Not Started | Notified Art via text | |||||||||||||||||||||||
86 | Additional parts of the 4th grade tack strip are falling down | 9/15/2022 | 4th Grade Classroom | Completed | Emailed Art 9/15/2022 | |||||||||||||||||||||||
87 | Clair just came up & told us that the edging on the concession counter is coming loose on the gym side. Needs to be glued back on? He will apply a little painters tape to hold for now so you see. | 1/17/2023 | Concessions Area | Completed | Art Texted 1/17 | |||||||||||||||||||||||
88 | Ashley's uni-vent in her classroom is spitting out hot air out of at least 2 of the 3 vents on top. It is turned off, so it should not have anything coming out, we thought. Art will need to maybe see about getting it checked out. | 2/7/2023 | 4th Grade Classroom | In Progress | Texted Art 2/7 | |||||||||||||||||||||||
89 | Girls handicapped stall not working | 2/7/2023 | Fellowship Hall | Completed | Texted Art 2/16 | |||||||||||||||||||||||
90 | The upstairs girl's bathroom - the stall doors are out of alignment. Only the 1st and 4th doors latch well. The middle two doors either don't lock or don't lock well so they open while you are in it. | 2/14/2023 | 2nd Floor | Completed | Texted Art 2/14 | |||||||||||||||||||||||
91 | Glue coming up from the floor in the fellowship hall | 2/22/2023 | Fellowship Hall | In Progress | Texted Art 2/22 | |||||||||||||||||||||||
92 | Cheer mat bracket in gym brokent. Needs to be welded | 10/17/2022 | Gym | Not Started | Texted Art 10/17 | |||||||||||||||||||||||
93 | Hook by Kindergarten is broken | 2/8/2023 | Kindergarten Room | Not Started | Emailed Art 2/8 | |||||||||||||||||||||||
94 | The screen by the iPad storage (S. window) is missing the bottom left white latch to hold the screen firmly in place. If there isn't another one, maybe a screen from a less used window could be used. | 2/8/2023 | Kindergarten Room | Not Started | Emailed Art 2/8 | |||||||||||||||||||||||
95 | Ugly black spots on the stones? Probably some sort of plant, moss, mold, etc. that should get taken care of with a chemical for that. It's the first year that I've noticed it both out front and back. | 9/20/2022 | Not Started | Reported to Art on 9/20. This has been a problem for years. Very difficult to clean. | ||||||||||||||||||||||||
96 | Tile in 3K/4K Room came up | 2/22/2023 | 3K/4K Room | Completed | Contacted Art. Was told he would look at it. | |||||||||||||||||||||||
97 | Cracked Wall Outlet, possibly causing shorts | 2/24/2023 | 4th Grade Room | Not Started | Contacted Art, was told to put tape over it for now | |||||||||||||||||||||||
98 | Need additional hooks in the key box | 2/24/2023 | Office | Not Started | Emailed Art, 2/24 | |||||||||||||||||||||||
99 | Hand Sanitizer in library is detaching from the wall and the sanitizer does not stay put together | 3/1/2023 | Library | Not Started | Texted 3/2 | |||||||||||||||||||||||
100 | Front Door is not latching properly. Was open this morning. | 3/2/2023 | Front Door | Completed | Texted 3/2. Glenn Obry fixed |