1 | Team 5843 Flurb's Project list | ||||
2 | * Project list automatically sorts | ||||
3 | Priority | Status | Who | Project | Notes and Instructions |
4 | A | Status | Sponsor thank you letters | ||
5 | A | In process | Register all students in FIRST System | ||
6 | A | Status | All | Blog and social media post everyday | |
7 | A | Completed | Steven | Follow up on swervedrivespecilties order | Order has been placed |
8 | A | Completed | Steven | Follow up on VEX order | Order is shipping Thursday 1/12 |
9 | A3 | Status | Air compressor maintenance - Drain tank | ||
10 | A6 | Completed | Steven | Setup laptops | |
11 | B | Status | Spread stereo speakers out. | ||
12 | B | Status | Bumpers - buy wood backing | ||
13 | B | Status | Brenda | Order team apparel | |
14 | B | In process | Steven | Order water bottles | Amazon |
15 | C | Status | Batteries - start testing batteries | ||
16 | C | Completed | Install drivers station software on programing laptops | ||
17 | C | Status | Volunteers for Lakeview #2 | ||
18 | C | Status | Volunteers for St. Joseph | Need two people each day | |
19 | D | Status | J & C | Code - Start building the master robot project | |
20 | Status | Batteries - assemble and label | |||
21 | Status | Batteries - recycle | |||
22 | Status | Bumpers - assemble bumpers | |||
23 | Status | Bumpers - cut wood backing to size | Length of wood = length of robot side | ||
24 | Status | Bumpers - mount bumpers on robot | |||
25 | Status | J & C | Code - Auto aim | ||
26 | Status | J & C | Code - Auto ball pickup | ||
27 | Status | J & C | Code - climb arm angle (put the correct lengths in the calc.) | ||
28 | Status | J & C | Code - climb arm lenght | ||
29 | Status | J & C | Code - Exist auton | ||
30 | Status | J & C | Code - install labview and all libraries | WPILib, CTRE, REV, NavX, drivers station, labview, and Java FIRST stuff | |
31 | Status | J & C | Code - intake button | ||
32 | Status | J & C | Code - intake retrack button | ||
33 | Status | J & C | Code - limelights | intake 0=red 1=blue 5=driver shooter 0=upper 5=driver | |
34 | Status | J & C | Code - program car wash | ||
35 | Status | J & C | Code - shoot 1 + exist | ||
36 | Status | J & C | Code - shoot button | ||
37 | Status | Competition Prep - check tire pressure trailer | |||
38 | Status | Brenda | Competition Prep - Create a handout with hotel information for Lakeview #2 | ||
39 | Status | Brenda | Competition Prep - Create a handout with hotel information for St. Joseph | ||
40 | Status | Brenda | Competition Prep - Create a handout with hotel information for SVSU - FIM State Championship | ||
41 | Status | Competition Prep - Create engineering spec page | |||
42 | Status | Competition Prep - Prepare for judge interviews | |||
43 | Status | Competition Prep - secure all wiring | |||
44 | Status | Competition Prep - Setup and test scouting system on tablets | https://stenniswood1966.github.io/2022migul/ | ||
45 | Status | Competition Prep - Install sponsor panels | |||
46 | A7 | Completed | All | Finish cleaning and sorting materials at field | |
47 | B | Completed | Install office on all laptops | From elevated cmd prompt -> setup.exe /configure Office-Visio-Project-2019-x64.xml | |
48 | A1 | Completed | Steven | Kickoff - Check supplies for graph paper | |
49 | A4 | Completed | Steven | Fix dust collector for router | |
50 | A5 | Completed | Steven | Finish setting up router | |
51 | A | Completed | Steven | Order 1/4" plywood for prototypes | |
52 | A1 | Completed | Steven | Kickoff - email with details of the weekend. | |
53 | A2 | Completed | Steven | Kickoff - register with Clint Engineerds for strategy session | |
54 | Completed | Steven | https://www.projectb.net.au/resources/robot-mechanisms/#IN | Share this with team | |
55 | Completed | Steven | Order 12ga zip cord | Needs to be solid copper. | |
56 | Completed | Steven | Order aluminum rivets with steel shanks 3/16" | ||
57 | Completed | Steven | Order bandsaw blades | ||
58 | Completed | Steven | Order bumper supplies | ||
59 | Completed | Steven | Order cancoders from CTRE | ||
60 | Completed | Steven | Order prototyping parts (intake wheels, versa rollers, ect) | ||
61 | Completed | Steven | Order solid pool noodles | 2 1/2" round solid pool noodles | |
62 | Completed | Krista | Reservations - FIM State Chanpionship | ||
63 | Completed | Krista | Reservations - Lakeview #2 | ||
64 | Completed | Krista | Reservations - St. Joseph | ||
65 | A | Completed | Steven | Order game pieces | |
66 | |||||
67 | |||||
68 | |||||
69 | |||||
70 | |||||
71 | |||||
72 | |||||
73 | |||||
74 | |||||
75 | |||||
76 | |||||
77 | |||||
78 | |||||
79 | |||||
80 | |||||
81 | |||||
82 | |||||
83 | |||||
84 | |||||
85 | |||||
86 | |||||
87 | |||||
88 | |||||
89 | |||||
90 | |||||
91 | |||||
92 | |||||
93 | |||||
94 | |||||
95 | |||||
96 | |||||
97 | |||||
98 | |||||
99 | |||||
100 |