| A | B | C | D | E | |
|---|---|---|---|---|---|
1 | Priority | Status | Who | Flurb's Project List | Notes and Instructions |
2 | 1A | Completed | Jim S. | Align tailstock on lathe (need setscrews) | |
3 | 1A | Completed | Batteries - recycle | ||
4 | 1A | Completed | Build a bench for the lathe | ||
5 | 1A | Completed | Build KOP robot on Dot's swerve chassis | ||
6 | 1A | Completed | CAD passthru elevator with over the head arms' | ||
7 | 1A | Completed | Steven | Kickoff - email with details of the weekend. | |
8 | 1A | Completed | Put Sasha up on rack | ||
9 | 1A | Completed | Recycle Aluminum scrap | ||
10 | 1A | Completed | replace Timbit drive motor | ||
11 | 1A | Completed | Replace wrist belt on timbit | ||
12 | 1A | Completed | take apart charging station | ||
13 | 1A | Completed | Take apart prototype grippers | ||
14 | 1A | Completed | take apart scoring station | ||
15 | 1A | Completed | Test Timbit wrist code from power off with wrist in multiple positions | ||
16 | 2A | Completed | Jim | Add light to chop saw bench | |
17 | 2A | Completed | Add shelf below chop saw bench | ||
18 | 2A | Completed | cut chassis rails for minibot | ||
19 | 2A | Completed | cut corner brackets for minibot | ||
20 | 3A | Completed | Load batteries in truck | ||
21 | 3A | Completed | load scrape aluminum in truck | ||
22 | 3A | Completed | Practice building autons with Timbit | ||
23 | 3A | Completed | Put colsons on timbit | ||
24 | 4A | Completed | Air compressor - fix leak at three way to compressor | ||
25 | 4A | Completed | Air compressor maintenance - Drain tank | ||
26 | 4A | Completed | Clean up Dot swerve code | ||
27 | 4A | Completed | finish chopsaw station | ||
28 | 4A | Completed | Finish letter for returning sponsors | ||
29 | 4A | Completed | Make table for Richmond router | ||
30 | 5A | Completed | Inventory bumper material | Order fabric and numbers | |
31 | 5A | Completed | 8 | Inventory Pool noodles | |
32 | A | Batteries - assemble and label | |||
33 | A | Bumpers - cut wood backing to size | Length of wood = length of robot side + 1/4" | ||
34 | A | Bumpers - purchase plywood (Birch no-void) | |||
35 | A | Completed | CNC 2nd set of arms | ||
36 | A | CNC 2nd shooter | |||
37 | A | CNC intake side plates | |||
38 | A | In process | cut shafts to length and tap. shoulder | ||
39 | A | cut shafts to length shooter | |||
40 | A | Completed | All | Finish cleaning and sorting materials at field | |
41 | A | finish electronics cover | |||
42 | A | Completed | Steven | Kickoff - Check supplies for graph paper | |
43 | A | make 2nd set of intake rollers | |||
44 | A | Make sponsor panel for back | |||
45 | A | In process | mount 2nd limelight | ||
46 | A | Completed | Steven | Order 12ga zip cord | Needs to be solid copper. |
47 | A | Completed | Steven | Order aluminum rivets with steel shanks 3/16" | |
48 | A | Completed | Steven | Order cancoders from CTRE | |
49 | A | Completed | Steven | Order parts to assemble batteries | |
50 | A | Completed | Steven | Order prototyping parts (intake wheels, versa rollers, ect) | |
51 | A | In process | Register all students in FIRST System | ||
52 | A | Completed | Setup network so computers can print | ||
53 | A | In process | Steven | Update budget and send receipts | |
54 | A1 | Add limitswitch to climber | |||
55 | A1 | Competition Prep - Create a handout with hotel information for St. Joseph | |||
56 | A1 | Email to principals - 1st competition | |||
57 | B | Bumpers - assemble bumpers | |||
58 | B | Bumpers - mount bumpers on robot | |||
59 | B | Completed | Image laptops | ||
60 | B | Completed | Steven | Order solid pool noodles | 2 1/2" round solid pool noodles - we have 8 |
61 | B | Completed | Lisa Z. | Reservations - Livonia Event | |
62 | B | Completed | Lisa Z. | Reservations - St. Joseph | |
63 | B | spare parts: all belts and pulleys used on robot | |||
64 | B | spare parts: swerve drive belts | |||
65 | B | spare parts: swerve wheels (new and old style) | |||
66 | B | Sponsor thank you letters | |||
67 | B | Volunteers for St. Joseph | Need two people each day | ||
68 | C | Competition Prep - check tire pressure trailer | |||
69 | C | Competition Prep - Create engineering binder with pictures and CAD exports | |||
70 | C | Competition Prep - Install sponsor panels | |||
71 | C | Competition Prep - Prepare for judge interviews | |||
72 | C | Competition Prep - secure all wiring | |||
73 | C | Competition Prep - Setup and test scouting system on tablets | https://stenniswood1966.github.io/2022migul/ | ||
74 | C | Completed | Steven | Order batteries from wcp | |
75 | C | Completed | Steven | Order bumper supplies - fabric and numbers | |
76 | C | Completed | Steven | Order buttons | |
77 | C | Completed | Brenda | Order team apparel | |
78 | D | Completed | Steven | Order new trailer tires | |
79 | Add second ethernet drop for Richmonds mill | ||||
80 | Batteries - start testing batteries | ||||
81 | All | Blog and social media post everyday | |||
82 | Build a paint booth | ||||
83 | Completed | Build excel dash board for scouting data | |||
84 | Completed | Build field elements | |||
85 | On hold | Build mini bot | |||
86 | Completed | Steven | Bumpers - buy wood backing | ||
87 | Competition Prep - Create a handout with hotel information for Livonia Event | ||||
88 | Competition Prep - Create a handout with hotel information for SVSU - FIM State Championship | ||||
89 | Completed | Steven | Email - Magna | ||
90 | Completed | Steven | Email - Cargill | ||
91 | Completed | Jim M. | Email - FCA (Jim Moran does this.) | ||
92 | Email - NDIA-MICH | ||||
93 | Completed | Steven | Email - SMR | ||
94 | Completed | Steven | Email - Yukon | ||
95 | Completed | Steven | Email - ZF | ||
96 | Email to principals - 2nd competition | ||||
97 | Email to principals - States | ||||
98 | Completed | Steven | Finish setting up router | ||
99 | Completed | Fix dust collector for router | |||
100 | Fix lathe electronics |