PROJECT ID: Station-Park-Green (One side of double shear wall)
4
5
6
Date:12-Mar-26
7
ITEM #DESCRIPTIONUNIT COST
(Labor+ Material)
TOTAL COST
(Labor+ Material)
TRADE COST
8
1GENERAL REQUIREMENTS
9
1Supervision 0N/A0.00$0
10
2Permits 0N/A0.00$0
11
3Final Cleanup0N/A0.00$0
12
4Mobilization Costs 0N/A0.00$0
13
5Project Overheads 0N/A0.00$0
14
6Bonds 0N/A0.00$0
15
7Temporary Control & Facilities0N/A0.00$0
16
Subtotal (General Requirements)$0
17
6Division 06 — Wood and Plastics
18
8SHEAR WALL (ONE SIDE ONLY OF DOUBLE SHEAR WALLS)QTYUNITUNIT COST
TOTAL COST
19
9DOUBLE SHEAR WALL ONE SIDE: LEVEL 1 (TYPE 2A)2370.5SQ FT0.00$0
20
10DOUBLE SHEAR WALL ONE SIDE: LEVEL 2 (TYPE 2A)6124.7SQ FT0.00$0
21
11DOUBLE SHEAR WALL ONE SIDE: LEVEL 3 (TYPE 2A)5661.9SQ FT0.00$0
22
12DOUBLE SHEAR WALL ONE SIDE: LEVEL 3 (TYPE 3A)462.1SQ FT0.00$0
23
13DOUBLE SHEAR WALL ONE SIDE: LEVEL 4 (TYPE 2A)2449.2SQ FT0.00$0
24
14DOUBLE SHEAR WALL ONE SIDE: LEVEL 4 (TYPE 3A)2715.3SQ FT0.00$0
25
15DOUBLE SHEAR WALL ONE SIDE: LEVEL 5 (TYPE 4A)1553.22SQ FT0.00$0
26
16DOUBLE SHEAR WALL ONE SIDE: LEVEL 5 (TYPE 2A)1652.13SQ FT0.00$0
27
17DOUBLE SHEAR WALL ONE SIDE: LEVEL 5 (TYPE 3A)179.28SQ FT0.00$0
28
18DOUBLE SHEAR WALL ONE SIDE: ROOF (TYPE 4A)166.557SQ FT0.00$0
29
19DOUBLE SHEAR WALL ONE SIDE: ROOF (TYPE 2A)120.006SQ FT0.00$0
30
Subtotal(Wood and Plastics)$0
31
32
33
SUBTOTAL$0.00
34
OVERHEAD0%$0.00
35
INSURANCE0%$0.00
36
CONTINGENCY0%$0.00
37
TOTAL BASE BID
$0.00
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101