A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | AA | AB | AC | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | Mission Log | ||||||||||||||||||||||||||||
2 | Mission | Date | Mission | Launcher | Objectives | ||||||||||||||||||||||||
3 | Number | RL | Kerbal | Name | Type | Crew | Code | Name | Priority | Objective | Result | Success/Failure | Grade | Status | Notes | ||||||||||||||
4 | |||||||||||||||||||||||||||||
5 | 1 | 4/17/2013 | Argus 1 | Mapping Satellite | Unmanned | XS1O-R2L125-B2S125LC | Juno 1 | Primary | Achieve Orbit | Achieved Orbit | Success | A | Complete | First Satellite Launch. | |||||||||||||||
6 | Map the Surface of Kerbin | Mapping | Success | A+ | Ongoing | No Fairing. | |||||||||||||||||||||||
7 | Secondary | Circularize Orbit at 200x200km | Circular 184x179km Orbit (1.38% Eccentricity) | Success | A- | Complete | Remains on Station and Mapping. | ||||||||||||||||||||||
8 | Orbital inclination of at least 45 degrees | Inclination of 48 Degrees | Success | A | Complete | ||||||||||||||||||||||||
9 | |||||||||||||||||||||||||||||
10 | 2 | 4/17/2013 | Heracles 1 | Manned Orbiter | 1 | XM1O-R2L125-B2S125LC | Juno 1 | Primary | Achieve Orbit | Sub Orbital | Failure | F | Complete | First Manned Orbital Attempt. | |||||||||||||||
11 | Jebediah | Safely Return Kerbonaught to Kerbin | Complete | Success | A | Complete | Second Stage Engine had Insufficent Thrust to Circularize. | ||||||||||||||||||||||
12 | Secondary | Circularize Orbit at 100x100km | Sub Orbital | Failure | F | Complete | Achieved an Apoapsis of 84km. | ||||||||||||||||||||||
13 | Equitorial Orbit | Sub Orbital | Failure | F | Complete | ||||||||||||||||||||||||
14 | |||||||||||||||||||||||||||||
15 | 3 | 4/17/2013 | Heracles 2 | Manned Orbiter | 1 | XM1aO-R2L125-B4S125LC | Juno 2 | Primary | Achieve Orbit | Achieved Orbit | Success | A | Complete | New Second Stage Motor Achieved Circularization. | |||||||||||||||
16 | Jebediah | Safely Return Kerbonaught to Kerbin | Complete | Success | A | Complete | |||||||||||||||||||||||
17 | Secondary | Circularize Orbit at 100x100km | Circular 104x101km Orbit (1.46% Eccentricity) | Success | A- | Complete | |||||||||||||||||||||||
18 | Equitorial Orbit | Equitorial Orbit | Success | A | Complete | ||||||||||||||||||||||||
19 | |||||||||||||||||||||||||||||
20 | 4 | 4/17/2013 | Heracles 3 | Manned Orbiter | 1 | M1O-R2a-2L125-B4S125LC | Juno 2 | Primary | Achieve Orbit | Achieved Orbit | Success | A | Complete | ||||||||||||||||
21 | Bill | Safely Return Kerbonaught to Kerbin | Complete | Success | A | Complete | |||||||||||||||||||||||
22 | Secondary | Circularize Orbit at 100x100km | Circular 103x102km Orbit (0.98% Eccentricity) | Success | A- | Complete | |||||||||||||||||||||||
23 | Equitorial Orbit | Equitorial Orbit | Success | A | Complete | ||||||||||||||||||||||||
24 | Minimum 5 Orbits | 7 Orbits | Success | A | Complete | ||||||||||||||||||||||||
25 | Coupled EVA | Bill EVA'd for half an orbit. | Success | A | Complete | ||||||||||||||||||||||||
26 | |||||||||||||||||||||||||||||
27 | 5 | 4/17/2013 | Perseus 1 | Manned Orbiter | 3 | XM2O-R2L25-B6L25LS | Hera 1 | Primary | Achieve Orbit | Sub Orbital | Failure | F | Complete | Steady Flight Under Boost. | |||||||||||||||
28 | Jebediah | Safely Return Kerbonaughts to Kerbin | Complete | Success | A+ | Complete | Exhibited moderate roll after 1st booster seperation. | ||||||||||||||||||||||
29 | Bill | Secondary | Circularize Orbit at 100x100km | Sub Orbital | Failure | F | Complete | Roll increased after second booster seperation and unrecoverable. | |||||||||||||||||||||
30 | Bob | Equitorial Orbit | Sub Orbital | Failure | F | Complete | Cut thrust to all engines and successfully aborted using escape tower rockets. | ||||||||||||||||||||||
31 | Minimum 5 Orbits | Sub Orbital | Failure | F | Complete | ||||||||||||||||||||||||
32 | Tertiary | Deploy and Test Solar Arrays | Sub Orbital | Failure | F | Complete | |||||||||||||||||||||||
33 | |||||||||||||||||||||||||||||
34 | 6 | 4/17/2013 | Perseus 2 | Manned Orbiter | 3 | XM2aO-R2L25-B6L25LS | Hera 1a | Primary | Achieve Orbit | Sub Orbital | Failure | F | Complete | Steady flight with all six boosters. | |||||||||||||||
35 | Jebediah | Safely Return Kerbonaughts to Kerbin | Complete | Success | A+ | Complete | Exhibited moderate roll after 1st booster seperation but was controlable. | ||||||||||||||||||||||
36 | Bill | Secondary | Circularize Orbit at 100x100km | Sub Orbital | Failure | F | Complete | Roll increased after second booster seperation and began to overwhelm SAS and pilot. | |||||||||||||||||||||
37 | Bob | Equitorial Orbit | Sub Orbital | Failure | F | Complete | Roll becomes unrecoverable after third booster staging. Begin to see excessive flex between first and second core stages. | ||||||||||||||||||||||
38 | Minimum 5 Orbits | Sub Orbital | Failure | F | Complete | Cut thrust to all engines and successfully aborted using escape tower rockets. | |||||||||||||||||||||||
39 | Tertiary | Deploy and Test Solar Arrays | Sub Orbital | Failure | F | Complete | |||||||||||||||||||||||
40 | |||||||||||||||||||||||||||||
41 | 7 | 4/19/2013 | Perseus 3 | Manned Orbiter | 3 | XM2bO-R2L25-B6L25LS | Hera 1b | Primary | Achieve Orbit | Sub Orbital | Failure | F | Complete | Steady flight with all six boosters. | |||||||||||||||
42 | Jebediah | Safely Return Kerbonaughts to Kerbin | Complete | Success | A+ | Complete | Exhibited moderate roll after 1st booster seperation but was controlable. | ||||||||||||||||||||||
43 | Bill | Secondary | Circularize Orbit at 100x100km | Sub Orbital | Failure | F | Complete | Roll increased after second booster seperation and began to overwhelm SAS and pilot. | |||||||||||||||||||||
44 | Bob | Equitorial Orbit | Sub Orbital | Failure | F | Complete | Cut thrust to all engines and successfully aborted using escape tower rockets. | ||||||||||||||||||||||
45 | Minimum 5 Orbits | Sub Orbital | Failure | F | Complete | ||||||||||||||||||||||||
46 | Tertiary | Deploy and Test Solar Arrays | Sub Orbital | Failure | F | Complete | |||||||||||||||||||||||
47 | Uncoupled EVA | Sub Orbital | Failure | F | Complete | ||||||||||||||||||||||||
48 | |||||||||||||||||||||||||||||
49 | 8 | 4/19/2013 | Perseus 4 | Manned Orbiter | 3 | XM2cO-R2L25-B6L25LS | Hera 1c | Primary | Achieve Orbit | Complete | Success | C+ | Complete | Steady flight with all six boosters. | |||||||||||||||
50 | Jebediah | Safely Return Kerbonaughts to Kerbin | Complete | Success | A+ | Complete | Exhibited moderate roll after 1st booster seperation but was controlable. | ||||||||||||||||||||||
51 | Bill | Circularize Orbit at 100x100km | Orbit of 173km x 184km (3.08% Eccentricity) | Failure | F | Complete | Roll increased after second booster seperation and began to overwhelm SAS and pilot. | ||||||||||||||||||||||
52 | Bob | Secondary | Equitorial Orbit | Polar Orbit 85 Degrees Inclination | Failure | F | Complete | Jeb able to retain enough control to prevent rocket break up. After third booster seperation rocket is controlable. | |||||||||||||||||||||
53 | Minimum 5 Orbits | 5 Orbits | Success | A | Complete | No flex in first/second stage coupler. Problem resolved. | |||||||||||||||||||||||
54 | Deploy and Test Solar Arrays | Complete | Success | A | Complete | Successful, but unplanned polar orbit mission. | |||||||||||||||||||||||
55 | Uncoupled EVA | Complete | Success | A- | Complete | ||||||||||||||||||||||||
56 | |||||||||||||||||||||||||||||
57 | 9 | 4/22/2013 | Perseus 5 | Manned Orbiter | 3 | XM2dO-R2L25-B6L25LS | Hera 1d | Primary | Achieve Orbit | Complete | Success | A+ | Complete | Steady flight, only minor roll exhibited in four booster flight. Pilot controlable. | |||||||||||||||
58 | Jebediah | Safely Return Kerbonaughts to Kerbin | Complete | Success | A | Complete | Unable to sucessfully dock with Perseus 6 | ||||||||||||||||||||||
59 | Bill | Dock with Perseus 6 | Unable to Dock | Failure | D | Complete | |||||||||||||||||||||||
60 | Bob | Secondary | Circularize Orbit at 100x100km | Orbit of 100.5km x 99.8km (0.35% Eccentricity) | Success | A | Complete | ||||||||||||||||||||||
61 | Equitorial Orbit | Orbital Inclination of 0.2 Degrees | Success | A | Complete | ||||||||||||||||||||||||
62 | |||||||||||||||||||||||||||||
63 | 10 | 4/24/2013 | Perseus 6 | Manned Orbiter | 3 | M2dO-R2L25-B6L25LS | Hera 1d | Primary | Achieve Orbit | Complete | Success | A+ | Complete | Unable to dock with Perseus 5. Was able to syncronize orbits but unable to navigate a closer approach than 7.5km. | |||||||||||||||
64 | Safely Return Kerbonaughts to Kerbin | Complete | Success | A | Complete | ||||||||||||||||||||||||
65 | Dock with Perseus 5 | Unable to Dock | Failure | D | Complete | ||||||||||||||||||||||||
66 | Secondary | Circularize Orbit at 100x100km | Orbit of 100.5km x 99.8km (0.35% Eccentricity) | Success | A | Complete | |||||||||||||||||||||||
67 | Equitorial Orbit | Orbital Inclination of 0.2 Degrees | Success | A | Complete | ||||||||||||||||||||||||
68 | Tertiary | Transfer Fuel Between Perseus 5 & 6 | Incomplete | Failure | F | Complete | |||||||||||||||||||||||
69 | Transfer Crew Between Perseus 5 & 6 | Incomplete | Failure | F | Complete | ||||||||||||||||||||||||
70 | |||||||||||||||||||||||||||||
71 | 11 | 4/26/2013 | Bacchus 1 | Unmanned Fueler | Unmanned | S2dO-R2L25-B6L25LS | Hera 1d | Primary | Achieve Orbit | Complete | Success | A+ | Complete | Goal: Deliver a full Rockomax Jumbo 64 fuel tank (orange long) to orbit fully loaded. | |||||||||||||||
72 | Dock with Perseus 7 | Complete | Success | A | Complete | Full Jumbo 64 put into orbit along with partial 8. 90% full RCS tank as well. | |||||||||||||||||||||||
73 | Secondary | Circularize Orbit at 100x100km | Orbit of 100.2km x 99.8km (0.2% Eccentricity) | Success | A+ | Complete | Sufficent mobility for target craft but not docking. | ||||||||||||||||||||||
74 | Equitorial Orbit | Orbital Inclination of 0.2 Degrees | Success | A+ | Complete | ||||||||||||||||||||||||
75 | Tertiary | Transfer Fuel to Perseus 7 | Complete | Success | A | Ongoing | |||||||||||||||||||||||
76 | |||||||||||||||||||||||||||||
77 | 12 | 4/26/2013 | Perseus 7 | Manned Orbiter | 3 | M2dO-R2L25-B6L25LS | Hera 1d | Primary | Achieve Orbit | Complete | Success | A+ | Complete | Achieved rendevous with Bacchus 1. Approached within 60m. | |||||||||||||||
78 | Safely Return Kerbonaughts to Kerbin | Complete | Success | A | Complete | Unable to dock with Bacchus 1 due to insufficent RCS control. | |||||||||||||||||||||||
79 | Dock with Bacchus 1 | Incomplete | Failure | D | Complete | RCS thrusters located significantly forwards of the CG. Perseus capsule unable to translate, only rotate. | |||||||||||||||||||||||
80 | Secondary | Circularize Orbit at 100x100km | Orbit of 100.2km x 99.8km (0.2% Eccentricity) | Success | A+ | Complete | Docking attempts continued until RCS fuel was reduced to 10% then mission aborted. | ||||||||||||||||||||||
81 | Equitorial Orbit | Orbital Inclination of 0.2 Degrees | Success | A+ | Complete | ||||||||||||||||||||||||
82 | Tertiary | Transfer Fuel Between Perseus 7 and Bacchus 1 | Incomplete | Failure | F | Complete | |||||||||||||||||||||||
83 | |||||||||||||||||||||||||||||
84 | 13 | 4/26/2013 | Perseus 8 | Manned Orbiter | 3 | M2eO-R2L25-B6L25LS | Hera 1e | Primary | Achieve Orbit | Complete | Success | A+ | Complete | Perseus RCS control redesigned with second set of RCS thrusters located at rear of SM and forward RCS thrusters moved forward to balance. | |||||||||||||||
85 | Jebediah | Safely Return Kerbonaughts to Kerbin | Complete | Success | A | Complete | Translation now possible and docking completed. | ||||||||||||||||||||||
86 | Bill | Dock with Bacchus 1 | Complete | Success | B+ | Ongoing | Fuel transfer initiated, first topping off Perseus 8's fuel, oxidizer, and monopropellant tanks before returning the fuel to Bacchus 1 and filling it. | ||||||||||||||||||||||
87 | Bob | Secondary | Circularize Orbit at 100x100km | Orbit of 100.2km x 99.8km (0.2% Eccentricity) | Success | A+ | Complete | ||||||||||||||||||||||
88 | Equitorial Orbit | Orbital Inclination of 0.2 Degrees | Success | A+ | Complete | Note: Add ladders to Bacchus control module for ease of EVA. Consider relocating Bacchus solar panels to allow for clearer approach. | |||||||||||||||||||||||
89 | Tertiary | Transfer Fuel Between Perseus 7 and Bacchus 1 | Complete | Success | A | Complete | |||||||||||||||||||||||
90 | |||||||||||||||||||||||||||||
91 | 14 | 4/29/2013 | Argus 2 | Mun Mapping | Unmanned | S2eI-R3L25-B6L25LS | Hera 1e | Primary | Achieve Orbit of Kerbin | Complete | Success | A+ | Complete | Successful luanch and Munar Injection. | |||||||||||||||
92 | Satellite | Perform Succeful Munar Injection and Capture | Complete | Success | B- | Complete | Malfunction in second stage decoupler lead to early ejection of satellite in equitorial Munar orbit. | ||||||||||||||||||||||
93 | Map the Surface of the Mun | Mapping | Success | A+ | Ongoing | Able to use satellite's main engine and RCS to establish inclined mapping orbit. | |||||||||||||||||||||||
94 | Secondary | Circularize Kerbin Orbit at 100x100km | Orbit of 100.2km x 99.7km (0.25% Eccentricity) | Success | A | Complete | |||||||||||||||||||||||
95 | Circularize Mun Orbit of 120x120km | Orbit of 111.2km x 127.1km (6.67% Eccentricity) | Success | B | Complete | ||||||||||||||||||||||||
96 | Munar Orbital Inclination of at least 45 degrees | Orbital Inclination of 54 Degrees | Success | A | Complete | ||||||||||||||||||||||||
97 | |||||||||||||||||||||||||||||
98 | 15 | 4/29/2013 | Ulysses 1 | Manned | 3 | K2eO-R2L25-B6L25LS | Hera 1e | Primary | Achieve Orbit of Kerbin | Complete | Success | A | Complete | Successful launch. Able to dock with Bacchus 1 and have Perseus 8 redock. | |||||||||||||||
99 | Orbital Station | Circularize Kerbin Orbit at 100x100km | Orbit of 104.4km x 96.5km (4.05% Eccentricity) | Success | A- | Complete | Unbalanced RCS profile made docking difficult. Had to complete docking via Bacchus 1. | ||||||||||||||||||||||
100 | Equitorial Kerbin Orbit | Complete | Success | A | Complete | Resultant station difficult to control via RCS. |